SPEC. NO.

TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT ELECTRICAL WORKS OF CHIMNEY

SECTION: CONTENTS

TCE-5259A-D-266-205

SHEET i OF iii

ESSAR POWER GUJARAT LIMITED 2X600 MW SALAYA THERMAL POWER PLANT JAMNAGAR, GUJARAT

TECHNICAL SPECIFICATION FOR ELECTRICAL WORKS OF CHIMNEY (Doc. No. TCE.5259A-D-266-205)

TCE CONSULTING ENGINEERS LTD 73/1, ST. MARKS ROAD BANGALORE 560 001 INDIA SEPTEMBER 2008

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT ELECTRICAL WORKS OF CHIMNEY
REV NO. P0 P0 P0

SECTION: CONTENTS

TCE-5259A-D-266-205

SHEET ii OF iii

SECTION SPECIFICATION NO. NO. A TCE.5259A-D-266-205 B C TCE.5259A-D-266-205 TCE.5259A-D-266-205

TITLE INTRODUCTION PROJECT INFORMATION SPECIFIC REQUIREMENTS

NO. OF SHEETS 5 3 15

DATA SHEETS D D D D D D D D TCE.5259A-D-266-205 TCE.5259A-D-266-205 TCE.5259A-D-266-205 TCE.5259A-D-266-205 TCE.5259A-D-266-205 TCE.5259A-D-266-205 TCE.5259A-D-266-205 TCE.5259A-D-266-205 P0 P0 P0 P0 P0 P0 P0 P0 DATA SHEET A1 LIFT DATA SHEET A2 - LIFT DATA SHEET A1 MOTORS DATA SHEET A2 MOTORS DATA SHEET A1 CONTROL CABINETS DATA SHEET A2 CONTROL CABINETS DATA SHEET A1 OTHER EQUIPMENTS DATA SHEET A2 OTHER EQUIPMENTS SCHEDULE OF PRICES OVERALL TIME SCHEDULE SCHEDULE OF DEVIATIONS FROM TECHNICAL SPECIFICATION SCHEDULE OF DEVIATIONS FROM GENERAL & SPECIAL CONDITIONS OF CONTRACT SCHEDULE OF MANDATORY SPARES SCHEDULE OF RECOMMENDED SPARES SCHEDULE OF SPECIAL ERECTION, MAINTENANCE TOOLS AND TACKLES SCHEDULE OF PLACES OF TEST AND INSPECTION 3 1 3 2 2 1 6 1

SCHEDULES F F1 F2 F3 TCE.5259A-D-266-205 TCE.5259A-D-266-205 TCE.5259A-D-266-205 P0 P0 P0 2 1 1

F4

TCE.5259A-D-266-205

P0

F5 F6 F7

TCE.5259A-D-266-205 TCE.5259A-D-266-205 TCE.5259A-D-266-205

P0 P0 P0

1 1 1

F8

TCE.5259A-D-266-205

P0

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT ELECTRICAL WORKS OF CHIMNEY
REV NO. P0 DRAWING TITLE

SECTION: CONTENTS

TCE-5259A-D-266-205

SHEET iii OF iii

SL. NO.

DRAWING NO.

NO. OF SHEETS

F9

TCE.5259A-D-266-205

SCHEDULE OF WEIGHTS AND DIMENSIONS

EXHIBITS 1 2 3 TCE.5259A-266-GA-6601 TCE.5259A-266-GA-6602 TCE.5259A-266-GL-3201 P0 P0 P1 275m HIGH RC CHIMNEY GENERAL ARRANGEMENT SH-1 275m HIGH RC CHIMNEY GENERAL ARRANGEMENT SH-2 RCC CHIMNEY EARTHING AND LIGHTNING PROTECTION LAYOUT RCC CHIMNEY LIGHTING LAYOUT 1 1 1

TCE.5259A-266-GL-3301

P0

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED 2x600 MW SALAYA THERMAL POWER PLANT


INTRODUCTION ESSAR POWER GUJARAT LIMITED

SECTION: A

TCE.5259A-D-266-205

SHEET 1 OF 5

1.0

INTRODUCTION ESSAR POWER GUJARAT LTD. (EPGL) proposes to install a 1200 MW imported coal fired thermal power station at Khambalia Taluk, Jamnagar District, Gujarat. 1000 MW from this proposed power station would be supplied to Gujarat Urja Vikas Nigam Limited (GUVNL), as per state Power Purchase Agreement (PPA). After meeting the internal plant requirements i.e., about 6.5%auxiliary power of 80 MW, the balance power of about 120 MW will be sold outside Gujarat to the neighbouring states viz. Maharashtra etc.

2.0 2.1

SCOPE OF SPECIFICATION The scope of this specification covers the design, manufacture, supply and fixing of all accessories required for installation of below equipments, inspection and testing at VENDOR's and / or his SUB-VENDOR's works, packing, transportation from place of manufacture to site, transit insurance from place of manufacture to site, unloading at site, storage insurance and supervision of erection / testing & commissioning of 1 No. Rack & Pinion Lift for Chimney (necessary input data for civil works, Mast structure, Lift, Drive system, Control panels & accessories), Main distribution board, Normal and Normalemergency AC Lighting panels, Cables, Conduit laying, Aviation warning lights, Earthing, Lighting, Receptacles and Lightning protection for chimney. Cable channels wherever required shall be supplied and erected by the contractor. The BIDDERS shall quote their firm prices as called for in Section-F1 of this specification.

2.2 2.3 2.4

For the present scope of enquiry, Essar Power Gujarat Limited shall be considered as the OWNER, as referred in various clauses of this specification. For installation of fixtures etc, the contractor shall have to arrange tools, tackles, welding sets, pipe bending machine, cable crimping tools etc. Contractor shall supply approved type danger boards in English and in local language and shall also supply fixing accessories such as nut bolts, check nuts, bushes, clips, nails, hoopers, clamps, screws, conduits, etc. Contractor shall be responsible to maintain all fittings/ equipment till handing over the chimney and shall change free of cost any fitting / equipment / accessories if found not in working condition. Contractor shall be responsible for taking approval of the installation and permission to energise the system from statutory authority.

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED 2x600 MW SALAYA THERMAL POWER PLANT


INTRODUCTION ESSAR POWER GUJARAT LIMITED

SECTION: A

TCE.5259A-D-266-205

SHEET 2 OF 5

2.5

For lightning protection, contractor's scope of work shall include supply and installation of the complete system up to and including the earth electrodes and earth mat. The contractor shall furnish a detailed drawing of the lightning protection system and earthing system and, execution of work shall be commenced only after obtaining approval to this from the owner.

2.6

For aviation warning system contractor's scope of work shall include supply and installation & commissioning of the complete aviation warning system including power receptacles and cabling between main board / switch and aviation warning beacons. Aviation lighting system shall be test operated by the contractor for not less than 60 days. The scope shall also include the civil works associated with aviation lighting. The contractor shall furnish a detailed drawing of aviation warning system and associated power distribution scheme and execution of work shall be commenced only after obtaining approval to this from the owner.

2.7

For general illumination of RCC Chimney, scope of work includes installation of complete illumination system including photo electric light detector, power receptacles and cabling. The contractor shall also furnish a detailed drawing of illumination system and associated power distribution net work and execution of work shall be commenced only after obtaining approval to this from the owner.

3.0 3.1

INSTRUCTIONS TO BIDDERS It is not the intent to specify completely herein, all the details of design and construction of the equipment / plant. However, the equipment/plant shall conform in all respects to high standards of engineering, design and workmanship and be capable of performing in continuous commercial operation upto the VENDOR's guarantees in a manner acceptable to the owner, who will interpret the meaning of specifications and drawings and shall reject any work or material which in his judgement is not in full accordance therewith.

3.2

The extent of supply under the contract includes all items shown in the drawings, not withstanding the fact that such items may have been omitted from the specifications or schedules. Similarly the extent of supply also includes all items mentioned in the specification and/or schedules, not withstanding the fact that such items may have been omitted in the drawings.

3.3

In the event of conflict between requirements of any two clauses of the specification documents or requirements of different codes/standards, specified, the more stringent
ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED 2x600 MW SALAYA THERMAL POWER PLANT


INTRODUCTION ESSAR POWER GUJARAT LIMITED

SECTION: A

TCE.5259A-D-266-205

SHEET 3 OF 5

requirement as per the interpretation of TCE will apply. 3.4 Whether called for specifically or not, all accessories required for normal operation of equipment (as interpreted by the owner) are deemed to be a part of the BIDDERs basic scope of supply and no claims, whatsoever for extra payment on these grounds, shall be accepted. 3.5 The VENDOR shall carry out all necessary co-ordination with regard to sub-contracted equipment. TCE will communicate only with the VENDOR for all matters pertaining to this contract. 3.6 The total price quoted for this contract shall be on lump sum all inclusive basis and shall cover all items and services necessary for the successful completion of the contract. Even if all components required for a system included in this specification are not explicitly identified and/or listed herein, these shall be supplied under this contract to ensure completeness of the system. Changes in quoted lump sum price shall be permissible only in case of addition/deletion of scope. 3.7 If any defects of design, workmanship and materials are observed within one year from the date of completion of work as certified by the Engineer, it shall be corrected by the contractor, entirely at his risk and cost. If the work of repairs or replacement is carried out by the owner, actual cost shall be recovered from the contractor. 3.8 The contractor shall carry out all rectifications, repairs or adjustment work found necessary during testing, commissioning at his own cost. 4.0 4.1 CODES AND STANDARDS All equipment, system and services covered under this specification shall comply with all currently applicable statutes, regulations and safety codes. Nothing in this specification shall be construed to relieve the VENDOR of this responsibility. 4.2 4.3 4.4 The standards not indicated in the specification are also acceptable, if they are established to be equal or superior to the standards indicated in the specification. The metric units/SI units shall be used in all data/drawings submitted against this package. The latest issue of IS codes prevailing at the time of submission of final offer will be applicable. However, if there are any revisions during the execution of the contract, the same shall be applicable and the cost implication if any shall be mutually discussed.

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED 2x600 MW SALAYA THERMAL POWER PLANT


INTRODUCTION ESSAR POWER GUJARAT LIMITED

SECTION: A

TCE.5259A-D-266-205

SHEET 4 OF 5

5.0 5.1

TERMINAL POINTS OF SUPPLY The PURCHASER will provide one 415V, 3 phase, 4 wire power supply in Main distribution board and one emergency supply 415V, 3 phase, 4 wire for normalemergency (N/E) lighting panel. Vendor shall clearly indicate in the bid the required feeder rating for the above power supplies. Cabling from Main distribution board (MDB) and Lighting panels shall be in the scope of vendor with further distribution to equipments, lighting fixtures etc. Any other voltage required shall be arranged by the Vendor.

5.2

Power supply for emergency lights for lift and emergency alarm shall be arranged by vendor from N/E lighting panel and MDB. Supply of lighting wires, conduits, etc. shall be included in the scope of vendor.

5.3

Complete wiring of all electrical equipment from the point of supply onwards required for the safe and satisfactory operation shall be in the scope of the Vendor.

6.0 6.1

INSPECTION TESTING AND COMMISSIONING After completion of erection / installation, such piece of equipment shall be thoroughly inspected in presence of the owner for correctness and completeness of erection and acceptability.

6.2

A check list may be furnished by the owner wherein all details to be checked and necessary instruction shall be listed. The inspection and checking shall strictly follow the checklist. On completion of the inspection two copies of the checklist dully filled in shall be handed over to the owner.

6.3 6.4

The checklist shall be jointly signed by the contractor and the owner. Such endorsement, however shall not relive the contractor of his obligation under the contract. After completion of erection work, tests shall be conducted by the contractor on each of equipment as per schedule of quantities to be supplied by the owner or his authorised representatives.

6.5 6.6

The contractor shall provide all tools, materials, labour and supervisory personnel for carrying out field tests on equipment and materials under his scope of work. The tests shall be conducted in presence of the owner and according to his directions. All temporary arrangements, rigging and connections required for the tests shall be provided by the contractor.
ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED 2x600 MW SALAYA THERMAL POWER PLANT


INTRODUCTION ESSAR POWER GUJARAT LIMITED

SECTION: A

TCE.5259A-D-266-205

SHEET 5 OF 5

6.7

The contractor shall record the test results on approved proforma and furnish six (6) copies of the results to the owner for approval within a week of the date of tests completed.

6.8 6.9

On successful inspection and testing the equipment shall be commissioned and put on service in a manner mutually agreed upon. The contractor shall carry out all rectifications, repairs or adjustment work found necessary during testing, commissioning at his own cost

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED 2x600 MW SALAYA THERMAL POWER PLANT


PROJECT INFORMATION ESSAR POWER GUJARAT LIMITED

SECTION : B

TCE.5259A-D-266205

SHEET 1 OF 3

PROJECT INFORMATION 1.0 Owner Essar Power Gujarat Limited, Essar House, P.O. Box No. 7945, Mahalaxmi, Mumbai - 400 034 Maharastra State Tel: +91-22-6660 1100 Fax: +91-22-2495 4787 Essar Constructions India Limited (ECIL), Essar House, P.O. Box No. 7945, Mahalaxmi, Mumbai - 400 034 Maharastra State Tel: +91-22-6660 1100 Fax: +91-22-2495 4787 TCE Consulting Engineers Ltd. 73/1, St. Marks Road, Bangalore 560 001 Tel : +91-806638 6300 Fax : +91-8022274873 / 874 4.0 5.0 6.0 7.0 7.1 Location of the plant Latitude and Longitude Elevation above mean sea level Climatic conditions Temperatures : Annual basis Highest temperature recorded Average ambient temperature Wet bulb temperature Relative humidity Annual average rainfall Taluk Khambalia, Dist. Jamnagar, Gujarat Latitude : 220 20 5.6 N Longitude : 690 37 9.8 E About 10 m

2.0

EPC Contractor

3.0

Owners / EPC Contractors Design Engineering Consultant

46C 35.9C 27C Varies between 27% and 96% Annual average rainfall is about 535.7 mm (most of which occurs during the monsoon season from June to September)

7.2 7.3

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED 2x600 MW SALAYA THERMAL POWER PLANT


PROJECT INFORMATION ESSAR POWER GUJARAT LIMITED

SECTION : B

TCE.5259A-D-266205

SHEET 2 OF 3

7.4 7.5 8.0

Basic Wind Speed (Vz) as per IS 875 (Part-III) Seismic Zone Auxiliary power supply:

50m/s Zone - V

Auxiliary electrical equipment to be supplied against this specification shall be suitable for operation on the following system : a) For motors rated above 1500 kW b) For motors rated > 200 KW & 1500 kW c) For motors rated upto 200 kW d) DC motor starters, DC solenoids, DC alarm, control and protections of Breakers e) AC control & protective devices 11000V, 3 phase, 3 wire, 50Hz medium earthed AC 3300V, 3 phase, 3 wire, 50Hz medium earthed AC 415V AC, 3-phase, 4-wire, 50 Hz effectively earthed 220V DC, 2 wire, unearthed DC

f) Uninterrupted power supply g) Lighting fixtures and space heaters

230V, 1 phase, 50Hz, 2 wire AC supply. The single-phase 110V AC supply shall be derived by CONTRACTOR by providing 415V / 110V control transformers of adequate rating with MCCB / MCB on both the primary and secondary sides 230V, 1 phase, 50Hz, 2 wire AC supply 240V, 1 phase, 2 wire, 50Hz

h) The above voltages may vary as follows : All devices shall be suitable for continuous operation over the entire range of voltage and frequency indicated below without any change in their performance. Voltage variation 10% Frequency variation 5% Combined voltage & frequency variation 10% DC Supply Voltage variation +10% -15% All the electrical equipment shall be designed for 50C reference ambient temperature. AC supply

9.0

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 1 OF 15

1.0 1.1 1.1.1

LIFT General Lift shall be provided for the chimney inside the wind shield. The lift shall be of cage type and suitable for installation in outdoor area with corrosive and dusty atmosphere that generally exists in thermal power stations/industrial complexes. It shall generally conform to the provisions of IS:1860 and IS:4289 unless otherwise specified. The lift shall have a minimum carrying capacity of 400 kg at a speed of 0.7 metre per second. The lift shall be of rack and pinion driven service type of approved make. All the control devices inside the cage shall be housed in a dust free and water proof enclosure. Landings shall be provided as shown in the data sheet A2 of Lift. Construction of guard cage and supply of other accessories required for satisfactory and safe operation of lift shall be included in CONTRACTORS scope. CONTRACTOR shall also supply and install safety devices such as automatic stop equipment, over speed governor etc. all complete as per Manufacturers recommendation. All the embedments for the lift structure, approach platforms at landing levels and the lift supporting structure including lift cage shall be hot dip galvanised. Vendor shall derive AC power from the Main distribution board. All electrical devices like contactors, push buttons, indicating lamps located outside shall be housed in dust tight/water tight weather proof enclosures as specified in Data Sheet 'A1'. Indirect lighting by 1 x 20 W fluorescent lamp channel type shall be provided for the lift. The earthing scheme of elevator shall be connected to earth grid at two points. Motors Motors shall conform to the latest applicable standard of IEC-60034/IS-325. Motors shall also comply with the technical requirements specified herein and in Motor Data Sheets. Motors shall be suitable for Direct On Line (DOL) starting. The minimum permissible voltage shall be 85% of the rated voltage during motor starting. Motors shall be capable of starting and accelerating the load with the applicable method of starting, without winding temperatures reaching injurious levels, when the supply voltage is in the range of 85% of the rated motor voltage to maximum permissible voltage specified. Locked rotor current of the LT motor shall not exceed 600% (tolerance applicable as per IS) of full load current. Motors shall be capable of developing the rated full load torque (FLT) even if the supply voltage drops to 70% of the rated voltage. If such operation is envisaged for a period of one second, the pull out torque of the motor shall be at least 205% of FLT.
ISSUE P0 TCE FORM 329 R3

1.1.2 1.1.3 1.1.4

1.1.5 1.1.6 1.1.7

1.1.8 1.2 1.2.1

1.2.2 1.2.3

1.2.4 1.2.5

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 2 OF 15

1.2.6

Motors shall withstand for 1 second the voltage and torque stresses developed due to the vector difference between the motor residual voltage and the incoming supply voltage equal to 150% of the rated voltage during fast change over of buses. All motors shall be designed to withstand atleast 5% harmonics in the supply voltage. The locked rotor withstand time under hot condition at 110% rated voltage shall be more than the starting time at minimum permissible voltage specified above by atleast three seconds or 15% of the accelerating time whichever is greater. Provision of speed switch shall be avoided to the extent possible. In case the speed switch is required, it shall be indicated by the bidder in his offer. The class of insulation shall be class F with the temperature rise of the winding limited to class B. Bearing Each bearing shall be provided with a dial type thermometer. The dial thermometers shall be of reliable and reputed make. The thermometers shall be located at a convenient height for easy reading and handing. Each thermometer shall consist of 2 potential free contacts. They shall be designed to close independently at two different temperatures - one for 'Alarm' and another for 'Trip'. The contact rating of the potential free contacts shall be 1A at 240V AC & 0.1A at 220V DC. Any auxiliary supply, if required shall be indicated by the bidder. One bearing shall be insulated. Maximum noise level measured at a distance of 1.0 metre from the outer surface of the motor shall not exceed 85 db(A). Two independent earthing points shall be provided on opposite sides of the motor. Unless otherwise approved, the terminal box shall be capable of being turned through 3600 in steps of 90o. Terminal boxes shall be suitable for termination of motor cables. Separate terminal boxes to be provided for space heater, RTDs, thermocouple, vibration monitors etc. All terminal boxes shall be provided with two earthing studs for termination of protective earth conductor. Motor terminal covers shall have drain plugs so located that they will drain water, resulting from condensation or other causes from all pockets in the motor casing. The following details, in addition to those specified in applicable standards shall be included on the rating plate. 1. Temperature rise of windings in degree centigrade at rated load, rated voltage, frequency and ambient conditions and the method of measuring temperature rise (Thermometer/ Winding resistance). 2. Type of bearings, recommended lubricant, lubricating interval & relubricating quantity.

1.2.7

1.2.8 1.3 1.3.1

1.3.2 1.3.3 1.3.4 1.3.5

1.3.6 1.3.7

1.3.8

Space heaters shall be provided for all LT motors of rating above 30 kW. Heaters to be automatically OFF when the motor is switched ON. Space heaters shall be located at easily accessible position for maintenance. Space heaters shall have adequate capacity to maintain motor internal temperature above dew point to prevent
ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 3 OF 15

moisture condensation during idle period. 1.3.9 All motor parts exposed directly to atmosphere shall be finished and painted to produce a neat and durable surface which would prevent rusting and corrosion. The equipment shall be thoroughly degreased, all rust, sharp edges and scale removed and treated with one coat of primer and painted with two coats of grey epoxy paint. Motor shall be subjected to all the routine tests as per applicable standard in the presence of the PURCHASER'S representative. Copies of test certificates of type and routine tests, shall be furnished as specified in the distribution schedule, for PURCHASER'S approval. The VENDOR shall ensure to use calibrated test equipment/instruments having valid calibration test certificates from standard laboratories traceable to national/international standards. Control Cabinets The control panel shall include all necessary devices for receiving and distribution of power supply, control and protection for various equipment of the elevator. Control cabinets shall be sheet steel enclosed and shall be dust, weather and vermin proof providing a degree of protection of IP 55. Sheet Steel used shall be cold rolled and at least 2.0mm thick and properly braced to prevent wobbling. Control cabinets shall be provided with hinged door(s) with padlocking arrangement and suitable brackets/channels shall be provided for the type of mounting specified in Data Sheet. All doors, removable covers and plates shall be gasketed all around with neoprene gaskets. All accessible live connections shall be shrouded and it shall be possible to change individual fuses, switches, MCBs without danger of contact with live metal. All live parts shall be provided with at least phase to phase and phase to earth clearances in air of 25 mm and 20mm respectively. Two earthing leads shall be provided at either end of the panel. All sheet steel work shall be degreased, pickled, phosphated and then applied two coats of zinc chromate primer and two coats of finishing epoxy paint, both inside and outside, of colour as specified in Data Sheet. Busbars Busbars shall be insulated and of aluminium alloy of E91E grade and shall have adequate cross-section to carry the required continuous currents such that the operating temperature of the busbars does not exceed 850C. Motor feeders Motor to be controlled from the cabinet shall be provided with 3 pole/2 pole isolating switch, HRC fuses, contractors with thermal overload relays and other equipment required for satisfactory control of motors. When schematic drawings/bill of material is enclosed, all equipment shown shall be supplied by the VENDOR. The isolating switch and contactor shall be rated at least 20% more than the connected motor full load current. Unless otherwise specified motors rated 0.5KW and above being
ISSUE P0 TCE FORM 329 R3

1.3.10

1.4 1.4.1 1.4.2

1.4.3

1.4.4

1.4.5 1.4.6 1.4.7

1.5 1.5.1

1.6 1.6.1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 4 OF 15

controlled from the control cabinet shall be rated for 415V, 3 phase, 50 Hz and motors rated below 0.5 KW shall be 240V, 1 phase, 50 Hz. 1.7 1.7.1 Switches/MCBs Switches / MCBs / MPCBs / MCCBs shall be hand operated, air break, heavy duty, quick make, quick break type conforming to applicable standards. They shall be of reputed make acceptable to the Purchaser and rating of the same shall be optimized to reduce number of types of spares. The rating of switch shall be so chosen as to get complete protection by associated O/L relay or fuse under all normal/abnormal conditions such as full load, overload, locked rotor, short circuit etc. MCBs / MPCBs / MCCBs shall be provided with overload/short-circuit protective device. It shall be the responsibility of the VENDOR to fully coordinate the overload and short circuit tripping of the MCBs / MPCBs / MCCBs with the downstream MCBs/fuses/motor starters, to provide satisfactory discrimination. Switch handle shall have provision for locking in both fully open and fully closed positions. MCBs / MPCBs / MCCBs shall be provided with locking facility when called for in Data Sheet. Contactors Contactor type motor starters shall be of the full voltage, direct-on-line, air break, single throw, electro-magnetic type unless otherwise specified. Automatic star-delta type starters shall be provided when specified. Contactors shall be provided with at least 2 'NO' and 2 'NC' auxiliary contacts. Contactor shall be provided with a three element, positive acting, ambient temperature compensated time lagged, hand reset type thermal overload relay with adjustable settings to suit the rated motor current. Fuses Fuses generally shall be of the HRC cartridge link type, mounted on plug-in type of fuse bases having a rupturing capacity of 80 kA. Fuses upto 63A may be of HRC cartridge screw-cap, D-type, having a rupturing capacity of not less than 46 kA at 440V A.C. and 16 kA at 250V D.C. Fuses shall be provided with visible operation indicators to show that they have operated. All accessible live connections shall be adequately shrouded, and it shall be possible to change fuses with the circuit alive, without danger of contact with live metal. Control & auxiliary power supply All AC control equipment shall be suitable for operation on 240V AC, 1 phase, 50 Hz system. This supply may be obtained from phase and neutral when 4 wire 415V main supply is available. Otherwise, or when control voltage, other than 240V is specified, a suitable transformer shall be provided. The control transformer shall be
ISSUE P0 TCE FORM 329 R3

1.7.2

1.7.3

1.7.4

1.8 1.8.1

1.8.2 1.8.3

1.9 1.9.1

1.9.2 1.9.3 1.10 1.10.1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 5 OF 15

complete with isolation facilities and primary and secondary HRC fuses.

1.10.2 1.11 1.11.1

Separate circuits with switches, fuses etc. of adequate rating shall be provided for control of space heater, through thermoster and panel illumination etc. Relays Necessary auxiliary release for alarm, time-delay relays, voltage relays as required for control and protection shall be mounted inside the cabinet. Relays shall be equipped with externally reset, positive action operation indicator. Voltage relays shall have sufficient thermal capacity for continuous energization, using external resistors if necessary. Auxiliary relays shall be rated to operate satisfactorily between 80% and 110%of the rated voltage. Each relay shall be provided with at least two potential free contacts (1NO+1NC) for the PURCHASER's use. Control & selector switches Control and selector switches shall be of the rotary type provided with properly designated escutcheon plates clearly marked to show the operating positions. Control switches shall have momentary contacts, spring return to centre, with pistol grip handle. Selector switches shall have stay put contacts with oval handles. The number of contacts and their operation in each switch shall be as indicated in control schematic (when enclosed) or shall be as per the requirements of the connected circuit. The switches shall be rated for minimum 10A at 240V A.C. and 1A inductive break at 220V D.C Indicating lamps Indicating lamps of the Clustered Coloured LED type with coloured Lens engraved ON,OFF,TRIP. Space heater Strip type space heaters of adequate capacity shall be provided inside each cabinet. Heaters shall be complete with rotary type 'ON-OFF' switch, HRC fuse on phase or a single-pole MCB with overload and short circuit protection, link on the neutral and a thermostat to cut off the heaters at 45 Degree Celsius and shall have continuously settable range from 30 to 90 degree Celsius. Interior lighting and receptacle Control cabinet shall be provided with a 240V, 1 phase, 50 Hz, T5 type fluorescent tubes (Energy efficient) for interior illumination controlled by a 'ON-OFF' switch / MCBs and 240V, 1 phase, 5/15 Amp., 3 pin receptacle with Plug and Switch/MCB for Switching ON & OFF. Power source for interior lighting and receptacles shall be completely independent of control power source.

1.11.2 1.11.3 1.12 1.12.1

1.13 1.13.1 1.14 1.14.1

1.15 1.15.1

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 6 OF 15

1.16 1.16.1

Cabinet internal wiring Control cabinet shall be supplied completely wired, ready for the PURCHASER'S external connections at the terminal blocks. All wiring shall be carried out with 650/1100V grade, XLPE insulated, stranded conductors. Power circuits shall be wired with standard aluminium conductors of adequate sizes to suit the rated circuit current; the minimum size shall be 4 mm2. Control, alarm and indication circuits shall be wired with stranded copper conductors of sizes not smaller than 2.5 mm2. C.T. & P.T. circuits shall be colored wired for R Y B phases with stranded copper conductor of size, not smaller than 4 mm2. Engraved identification ferrules, marked to correspond with the wiring diagram shall be fitted at both ends of each wire. All wiring shall be adequately rated for the circuit current, the minimum rating shall be 20A. AC DISTRIBUTION PANEL MDB and Lighting panels (LP) shall be supplied, installed and commissioned at a height of 1.5 meter from grade level on a supporting structure with proper grouting. The MDB and LP shall be supplied with tinned brass glands and tinned crimping type copper cable lugs for termination of cables. The panel shall have two distinct earthing terminals and shall be connected to earth grid. N/E Lighting panel shall have provision for two incoming supplies. One incomer supply shall be derived from MDB by vendor and second incomer supply will be provided by purchaser from emergency switchboard supplied by others. Auto changeover facility shall be provided for the two incomers through contactor interlock. At a time, one source shall be feeding N/E loads (contactor connected to this source will be energised) and on failure of the supply (contactor de-energised), other source will automatically resume with NC auxiliary contact connected to the source. The incoming and outgoing feeders shall be switch fuse unit and shall supply power for aviation lighting, emergency light for lift and 20% stair case lighting only. Other required power supply shall be derived from main distribution board only. The short circuit rating of the panel shall be 10kA for 1 second. Main distribution board shall consists of one incoming supply with MCCB feeder & seven outgoing switch fuse feeders for power supply to lift, welding receptacles, normal lighting panel and one supply to normal-emergency lighting panel with two spare feeder. The short circuit rating of the panel shall be 65kA for 1 second. Normal lighting panel shall consist of one incoming supply derived from MDB. The incoming and outgoing feeders shall be switch fuse unit and shall supply power to 80% stair case lighting, platform lighting, 1 ph. Receptacles etc. The short circuit rating of the panel shall be 10kA for 1 second. The distribution boards shall confirm to IP: 55 class of enclosure and provided with suitable rain canopy over the top. Sheet steel thickness of distribution board shall not be less than 2mm for load bearing structures and 1.6 mm for others. 20% spare feeders shall be provided in the Lighting panels. Incoming feeder of the Main distribution boards shall be with Ammeter & Voltmeter with selector switches and phase indication lamps. Lighting panels shall be provided with photo electric light
ISSUE P0 TCE FORM 329 R3

1.16.2

2.0

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 7 OF 15

detector circuit and each phase circuit of lighting panels shall be provided with ELMCB (300mA, 30ms) along with fuse so that on short circuit fuse will be blown before ELMCB gets damaged as the short circuit current will be more than 40kA. The boards shall be painted with one coat of zinc chromate primer (yellow) and two coats of synthetic enamel paint of approved shade. The switches shall be of heavy duty type conforming to the requirements of IS:13947 -1993. The fuses shall be HRC link type. 3.0 3.1 CABLES LV Power Cable shall be 1100 V grade, stranded aluminium / copper conductor, XLPE insulated, extruded PVC inner sheathed of type ST-2, armoured and with outer sheath made of FRLS PVC compound of type ST-2. Control cables shall be 1100V grade, multicore, minimum 2.5 mm2 cross section, stranded copper conductor having 7 strands, PVC insulated, inner FRLS PVC sheathed of type ST-1, galvanised steel wire armoured and outer sheath made of FRLS PVC compound of type ST-1. In situations where accuracy of measurement or voltage drop in control circuit, warrant, higher cross sections as required shall be used. AVIATION WARNING SYSTEM Contractor shall supply and install, including wiring, Medium intensity aviation warning light with all associated accessories such as sockets, special cables, electrical controllers / Flashers and necessary mounting brackets/supports. The body of the aviation light shall be made of a corrosion resistant aluminium casting finished in stove enameled aviation yellow. The paint shall be epoxy paint, of aviation yellow colour, which shall be hard and weather resistant. The light source shall be protected by thick glass dome and the fittings shall be complete with double compression type cable glands. All the aviation light fixtures shall be weatherproof and outdoor type suitable for highly humid and flue ladden atmosphere. The aviation warning beacons shall be provided at the locations shown in the drawing. Double obstruction aviation lighting fixtures securely mounted at the top of the the chimney shall be within the zone of protection of roof conductor of chimney. The Medium Intensity aviation warning beacons shall generally meet the following requirements: a) Type of lamp : Red coloured 'LED' b) Type of fitting c) Control of flash d) Intensity of flash e) Frequency of flashes : : : : Medium intensity flashing type Automatic night intensity operation 3000 cd (minimum) 20 to 60 flashes per minute

3.2

4.0 4.1

4.2

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS
: : :

SECTION : C

TCE-5259A-D-266205

SHEET 8 OF 15

f)

Type of flashes

Synchronised flashing of all the lights 240V, 1 phase and 50 Hz Weather proof conforming to IP 55 classification as per IS:13947

g) Rated power supply voltage & frequency h) Type of enclosure 4.3

Aviation lighting system shall be fed from separate circuit. The aviation light circuits shall be distributed among R, Y and B phase of 3 phase, 4 wire supply. The contractor shall install weather proof terminal boxes with cable glands on each platform of the chimney at location close to the aviation warning beacons. The maximum conduit fill shall not exceed 60%. Suitable pull boxes shall be provided at convenient locations. All aviation light fixtures, conduits and junction boxes etc, shall be properly earthed. Earth wire shall run inside along the entire length of conduit between the fixtures and distribution board where it shall be connected to earth. Temporary warning lights shall be installed during construction suitably located above the top most point of obstruction and shall be shifted up as the construction progresses. Power for operation of the temporary lights shall be obtained from the construction power system. Supply circuits for these lights shall be furnished, installed and maintained by the contractor.

5.0

GENERAL ILLUMINATION General illumination of the RCC chimney shall be done for platform & staircase lighting with industrial weather proof dust tight with reflector integral mounted control gear with 1x70 watt HPSV well glass fitting mounted on the platform hand rails on fabricated MS angle support. The contractor shall provide suitable mounting arrangement for the above fixtures capable of withstanding high wind pressure. The lamp on the same vertical line shall be fed from different phases, so that failure any one phase shall not cause total block out on one side. General lighting system of chimney shall be fed from a separate feeder of distribution board. Considering voltage drop, suitable XLPE insulated heat resistant cable conforming IS.1554 Part -II shall be used for wiring all lighting fixtures and power receptacles. The cable shall be clamped by the side of the ladder at 750 mm centres by means of GI clamps. Lighting fixtures, conduits, etc. shall be properly earthed using galvanised steel wire of 12 swg. Earth wire shall run inside along the entire length of conduit between the fixtures and distribution panel where it shall be connected to the earth. One number 15A 3 Phase, 4 pin industrial type receptacle and one number 63A welding receptacle with controlling switch and loose matching plug mounted in weather proof and dust tight box shall be supplied and installed at each of the platform near access doors. The box shall be fabricated of galvanised sheet steel having suitable hinged door properly gasketed to make it dust proof.
ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 9 OF 15

Photoelectric light detectors shall be furnished and installed at Lighting panels to monitor the light intensity. The detector shall cause the control unit to energize the lighting system when the luminance on a vertical surface decreases to less than 35 candela. Lights shall be deenergised when the luminance on a vertical surface increases to more than 58 candelas. In case of malfunction of photo electric circuit, manual bypass arrangement through bypass switch shall be provided. 6.0 EARTHING SYSTEM Separate earthing conductors of 75 x 10 M.S. flat shall run in the inner side of RC shell concrete floor. Only risers of 60 X 10 G.S. flat shall be brought out at all platforms for equipment earthing supported at 2500mm interval. A 40 mm dia M.S. rod shall be provided at 600mm below the ground around the chimney. The earth grid shall be connected to the earth electrodes and shall be connected to plants earth grid through Test pits. The Earth electrode / Test pit shall be of 40mm dia, 3M long Mild Steel (MS) round bar. The earthing resistance of earthing system shall be less than 1 Ohm. If the earth resistance is found as more than one ohm, Contractor shall provide additional earth electrodes or mat to bring down the earth resistance to a value less than one ohm. All metallic parts, lighting fixtures, JBs , Lift motor, Handrail etc., shall be earthed to the nearest earthing grid by using suitable earth conductor at two points. JBs --- 8 SWG wire N/E DB, LP & metallic structure ---------25x6 flat Chimney staircase / Ladder shall be electrically connected to the down conductors both at top and bottom. For this, the two lower pairs of inserts supporting the Staircase / ladder shall be adequately connected to the grounding system and the top pair of inserts shall be connected to the circumferential conductor connecting the down conductor. All intermediate breaks in the ladder should be electrically bonded to form a continuous support from top to bottom. 7.0 LIGHTNING PROTECTION The installation work shall conform to IS: 2309. The roof / circumferential conductor of chimney shall be 70 mm2 copper conductor coated with lead. Each segment of cast iron cap of the chimney shall be connected to the circumferential band by means of tightly bolted connections as shown in the drawing. The down comers of 25 x 6 GS flat shall be run inner side of the concrete shell. The circumferential band shall be supported at an interval of 600mm and down comers shall be supported at interval of 2500mm.

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 10 OF 15

Down conductors shall be connected to the circumferential conductor at the top of the chimney and to the testing point at the chimney base .There shall be no intermediate splices in the down conductors which shall be embedded in the concrete shell. Tapping of down conductor by bolting is not acceptable. The down comers shall come out from the shell to facilitate connection with the test link. Lightning system grounding shall be distinct from the plant grounding system. Lightning down conductors shall be separately grounded through earth electrode rods. During construction, temporary lightning protection should be maintained by connecting the concrete reinforcement to two permanent electrical grounding conductors. After the top lift of the chimney shell has been completed, temporary air terminals which may consist of reinforcing bars, should be installed at the top to serve as a temporary protection until the lining and cap are completed and permanent air terminals are installed. Each down conductor shall be provided with a testing point around 1500 mm above ground level but inaccessible in order to avoid interference. Test link shall be enclosed in GI box. All bolt-nuts and washers in the test link shall be electroplated. Incoming and outgoing portion of the lightning down conductor from the test link shall be galvanised to length of atleast 500mm. All connections, clamps, anchors, etc., of the lightning protection system shall be made of GI and shall conform IS-2309. All electrical connections or joints, unless otherwise specified, shall be clamped or bolted by high pressure contact to form a connection of adequate current carrying capacity and mechanical strength. Soldered connections will not be permitted. Roof conductors, connections, clamps, fixtures, anchors, etc., exposed within 8000 mm of the top of the chimney shall have a continuous lead covering of a sheath of commercially pure lead not less than 2mm in thickness extruded, the ends being covered by soldering or puddling. Where lead covering is specified, after the joints have been made, they shall be again covered with solder or lead either by wiping or casting. 8.0 8.1 LABLES & DIAGRAM PLATE Every equipment mounted in the cabinet for lift, distribution boards and other equipments shall be provided with individual labels with equipment designation/rating. Also, the cabinet shall be provided on the front & Rear side with a non-rusting label engraved with the designation of the cabinet as furnished by the purchaser. Inside the door a circuit diagram engraved on non-rusting metal / PVC shall be fixed for reference. TESTS & TEST REPORTS The CONTRACTOR shall conduct all the routine and functional test for all equipment
ISSUE P0 TCE FORM 329 R3

8.2 9.0 9.1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 11 OF 15

supplied under this contract and for the system as installed in presence of owner. Tests shall be conducted as required by the relevant standards as well as by the PURCHASER/ENGINEER. Copies of all type test certificates conducted on equipment of similar type and rating, carried out within the last five years shall be furnished. 10.0 10.1 11.0 11.1 MAKES The Bidder shall furnish the sub-vendors list for purchasers approval. MAINTENANCE TOOLS CONTRACTOR shall include all necessary maintenance tools and tackles required for maintenance of the equipments supplied by him. A list of maintenance tools included in the scope shall be furnished along with the BID. SPARES A list of essential spares has been listed. The BIDDER shall quote for these spares in the price schedule. The BIDDER may suggest changes in the list of essential spares as well as the quantities included on the equipment / system being offered. The BIDDER shall also furnish a list of recommended spares for satisfactory operation of the system for a period of three years. Unit price for each of the recommended spares shall also be furnished in the price schedule. Essential spares for Rack & Pinion Lift Description 12.3.1 Elevator a) b) c) 12.3.2 Motor a) 12.3.3 Bearing of each type & size for motors. 1 no. Brake coil Hoist way limit switch Down & Up limit switch 1 no. 1 no. 1 no. Quantity (for each equipment)

12.0 12.1

12.2

12.3

Control Panel a) b) c) d) e) f) Break switches AC contactors Auxiliary relays contacts Clustered LED of different colours Push buttons MCBs of power & control circuit 1 no. of each rating. 1 no. of each rating. 2 of each type 2 nos. 2 nos. 2 nos of each type
ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 12 OF 15

and rating g) h) 12.4 Fuses of each rating Auxiliary Relays of each type 2 nos. 1 no. Quantity (for each equipment) 1 set 5 nos of each type 5 nos of each type 3 nos. 2 sets of each type 5 nos of each type 10 nos.

Essential spares for Other Equipments Description

12.4.1 12.4.2 12.4.3 12.4.4 12.4.5 12.4.6 12.4.7 13.0 13.1

Photo electric device Junction boxes Termination boxes Aviation lamps(LED type Medium intensity) Flasher unit complete with electronic cards etc. MCCB, MCB, ELMCB & SFU 1 x 70 watt HPSV lamps with complete fittings APPROVALS

All equipment supplied and all works executed under this contract including system design and detailed engineering, shall comply with the statutory requirements of the Government of India, the Government of Gujarat the Indian Electricity Rules, etc. The scope of work includes obtaining necessary statutory approvals/clearances from all the concerned authorities for various systems covered in this contract. INFORMATION TO BE FURNISHED BY THE BIDDER ALONG WITH BID All the Data Sheets and Schedules duly filled up. General arrangement drawings of Lift and its accessories and layout. Description literature/catalogues and write-ups for the offered equipment. Type test certificates/reports for the equipment covered in the specification. DATA TO BE FURNISHED AFTER AWARD OF CONTRACT For Approval Dimensional drawings, giving overall dimensional details, foundation and cable entry particulars, weights, the necessary internal details, bill of materials, etc., for a) b) Lift and accessories Distribution boards and Local control panels with necessary metering, protection, internal schematic and wiring diagram.

14.0 14.1 14.2 14.3 14.4 15.0 15.1 15.1.1

15.1.2

Technical details of all cables being supplied by the VENDOR


ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 13 OF 15

15.1.3 15.1.4 15.1.5 15.1.6 15.1.7 15.2 15.2.1 15.2.2 15.2.3 15.2.4

Motor GA drawing Motor Data Sheets Single line diagram of the internal network Incoming cable route layout with sections Make of the items For Information Approval of all relevant drawings from the Tariff Advisory Committee and other bodies as applicable. List of routine, type and functional tests and the test procedure, for all equipment supplied under the contract. Guaranteed technical particulars of all equipment supplied under the contract as per Data Sheet and additional details as required. The VENDOR shall also furnish to the PURCHASER / CONSULTANT the required data / drawings / information called for elsewhere in the specification and also deemed necessary from time to time for design and engineering of the project. Following data shall be furnished for the Motors: In case of GA drawing of the motor following data shall be furnished: a) Name of Manufacturer, b) Weight of motor (kg.) c) Centre line of motor d) Foundation details, e) Openings and embedment details in foundation for entry of all cables such as power, space heater etc. f) Connection details of motor i.e., terminal markings, clearance between phase, disconnecting facilities and direction of cable entry and cable glands. g) Contact rating At 220V DC h) Dimensions of terminal boxes for main power leads, space heater leads and ETD leads i) Location of bearing thermometers and pockets for the same No. & type (NO/NC) of contacts provided on bearing thermometers j) Coupling type and diameter of shaft extension

15.2.5 15.2.5.1

15.2.5.2 15.2.5.3

Material and treatment of insulation Winding Stator winding a) Connection


ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 14 OF 15

b) Resistance/phase Rotor winding a) Connection b) Resistance/phase 15.2.5.4 Bearing DE Bearing / NDE Bearing a) Type, No. & make b) Lubricant 15.2.5.5 Air temperature detector (Internal) (CACA motor) a) Type & make b) Number c) Number of contacts in each indicator 15.2.5.6 15.2.5.7 15.2.5.8 15.2.5.9 Terminal box: Location of main terminal box viewed from non drive end (Right/Left) and its rotation details No load current of motor at rated voltage & frequency (for each type of motor) Limiting rotor temperature for determining safe stall time Data Sheet for Motors and characteristic curves with additional details that are specified below. a) Starting time (Secs) With 100% voltage at terminals With minimum voltage at terminals (at ____ % Rated voltage) With 110% voltage at terminals b) Safe stall time at 100/110% rated voltage under hot/cold condition. c) Type and size of cable for which gland is provided in the terminal box d) Type of bearings and expected life. e) Total weight of motor (kg) Weight of Stator (kg) Weight of Rotor (kg) f) Motor GD2 : g) Efficiency (%) Full Load Efficiency 75% Load Efficiency 50% Load Efficiency 25% Load Efficiency
ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SPECIFIC REQUIREMENTS

SECTION : C

TCE-5259A-D-266205

SHEET 15 OF 15

h) Power Factor Full Load Power Factor 75% Load Power Factor 50% Load Power Factor 25% Load Power Factor i) Torque (% FLT) Starting Maximum (Pullout torque) Pull up torque j) Space heaters Rated voltage/number k) Speed torque curve at rated & minimum starting voltage l) Current speed curve m) Current time curve n) Efficiency, power factor, slip, current against output curve o) Thermal withstand characteristic for motors of 100 kW & above - Hot & Cold p) Negative sequence current Vs time curve for motor of 100 kW & above.

ISSUE P0 TCE FORM 329 R3

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 - LIFT
Specification Requirements RACK AND PINION LIFT REF. DATA SHEET-A2 O YES Zone-V 415V, 3 ph, 4 wire supply * *

SECTION : D

TCE-5259A-D-266205

SHEET 1 OF 3

Description 1. LIFT CATEGORY 2. QUANTITY


1 GENERAL

Bidders Data

(a) INSTALLATION

I INDOOR O OUTDOOR (b) HAZARDOUS AREA CLASSIFICATION (IS 5572) 5. 6. 7. 1. 2. CORROSIVE LOCATION SEISMIC ZONE POWER SUPPLY MAKE RATED LOAD a) SINGLE POINT LOAD(Kg.) b) UNIFORMLY DISTRIBUTED LOAD (Kg.) RATED SPEED TOTAL RISE NO. OF FLOORS SERVED LEVELLING ZONE NO. OF DOORS IN THE CAGE CAGE DIMENSIONS (LXBXH) mm OVERALL WEIGHT kg. WEIGHT OF CAB COMPLETE WITHOUT LOAD (kg) a) NON AUTOMATIC m/sec m

2 LIFT PARTICULARS

3. 4. 5. 6. 7. 8. 9. 10.

0.7 REF. DATA SHEET-A2 REF. DATA SHEET-A2 * * * * * *

11. Weight of hoist cab kg. (with load)


3 LIFT CONTROL

1. OPERATION

b) SEMI AUTOMATIC c) AUTOMATIC WITHOUT ATTENDANT a) UP PUSH BUTTON

YES YES YES YES


ISSUE P0 TCE FORM 330 R1

4 OPERATING DEVICES

1. IN THE CAGE b) (YES/NO) c) d)

DOWN PUSH BUTTON NUMBER PUSHBUTTONS FOR EACH LANDING ALARM PUSH BUTTON

. ex i

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 - LIFT
Specification Requirements YES YES YES * * 605 x 2100 mm high minimum Manual single leaf hinged YES * * * * * * * Manual sliding collapsible YES YES YES

SECTION : D

TCE-5259A-D-266205

SHEET 2 OF 3

Sl. No.

Description e) EMERGENCY STOP PUSH-BUTTON UP PUSH BUTTON DOWN PUSH BUTTON

Bidders Data

5 GROUND & LANDING ENCLOSURE

a) 2. IN THE b) LANDING (YES/NO) a. SIZE OF THE ENCLOSURE (HEIGHT X BREADTH X DEPTH) b. MATERIAL OF CONSTRUCTION c. SIZE OF LANDING ENTRANCE (MM X MM) d. e. f. g. a. b. c. a. b. c. METHOD OF OPERATION OF DOOR ELECTRICAL AND MECHANICAL INTERLOCKING OF THE DOOR PROVIDED METHOD OF FIXING THE ENCLOSURE WITH THE CHIMNEY ANY OTHER DETAILS NOT COVERED ABOVE MATERIAL OF MAST LENGTH OF EACH PIECE OF MAST METHOD OF FIXING MAST WITH CHIMNEY INTERNAL SIZE (W X D X H) MATERIAL OF CONSTRUCTION METHOD OF OPERATION OF CAB DOOR ESCAPE HATCH ELECTRICALLY INTERLOCKING WITH ELEVATOR SYSTEM PROVIDED ARRANGEMENT OF LIGHT / FAN INSIDE THE CAB INDICATORS AND CONTROLS PROVIDED INSIDE THE CAB

5 MAST

6 CAB

d. e. f.

7 DRIVE UNIT

a. b.

LOCATION OF THE DRIVE UNIT NAME OF THE COMPONENTS OF THE DRIVE UNIT COMPRISE WITH THEIR MATERIAL

DETAILS OF ELECTRIC MOTOR i. MANUFACTURER

On Roof of Cage Electric motor, gear box, Electromagnetic brake disc type

BHEL/ BHARAT BIJLEE /Crompton

ISSUE P0 TCE FORM 330 R1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 - LIFT Specification Requirements

SECTION : D

TCE-5259A-D-266205

SHEET 3 OF 3

Sl. No.

Description ii. iii. iv. v. vi. c. d. e. f. g. h. i. j. k. l. m. n. o. p. a. EQUIPMENT DRIVEN BY MOTOR TYPE FRAME SIZE & TYPE APPLICABLE STANDARD RATED OUT AT 50 DEG.C MAX. POWER TO THE DRIVEN EQUIPMENT AT DESIGN DUTY POINT (KW) SERVICE FACTOR CLASS AND TYPE OF INSULATION TYPE OF ENCLOSURE AND METHOD OF COOLING DEGREE OF PROTECTION RATED VOLTAGE RATED FREQUENCY RATED SPEED (RPM) EFFICIENCY AT DESIGN DUTY POINT (WITHOUT TOLERENCE) POWER FACTOR AT DESIGN DUTY TIME RATIO OF LOCKED ROTOR KVA AND RATED KW TYPE OF MOUNTING BEARING TYPE i. DE ii. NDE WEATHER TYPE TESTED OR NOT MANUFACTURER TYPE AND MATERIAL RATED VOLTAGE (V) RATED CURRENT (AMP.)

Bidders Data

CAGE SQ. CAGE INDUCTION *

IS:325

* *

40% F IP 55, AIR


*

415 Volts + 10% 50 cycles


* * * *

FLANGE
*

8 POWER CABLE

b. c. d.

* As per approved vendor

Trailing/Fixed, FRLS
1.1kV GRADE *

* indicated above shall be filled by the Bidder and submitted along with the Bid.

ISSUE P0 TCE FORM 330 R1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2 X 600 MW SALAYA THERMAL POWER PLANT DATA SHEET A2 - LIFT

SECTION : D

TCE-5259A-D-266205

SHEET 1 OF 1

FLOOR DESIGNATIONS FOR CHIMNEY GROUND LEVEL LANDING 1 LANDING 2 LANDING 3 LANDING 4 LANDING 5 LANDING 6 LANDING 7 LANDING 8 LANDING 9 LANDING 10

FLOOR ELEVATION

TOTAL RISE

QTY. REQD

EL 0.0 M EL +11.3 M EL +31 M EL +39 M EL +65 M EL +105 M EL +145 M EL +152.5 M EL +182.5 M EL +222.5 M EL +262.5 M +262.5 M 1 No.

ISSUE P0 TCE FORM 330 R1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A2 - MOTORS
Unit Specification Requirement for Lift * As required * Squirrel cage kA kV kW 50 0.415 * * 3-phase, 3-wire, 50 Hz rpm * Continuous S5 Deg. C 50

SECTION : D

TCE-5259A-D-266205

SHEET 1 OF 5

Sl. No. 1.0 2.0 3.0 4.0 5.0 6.0 7.0 7.1 7.2 7.3 7.4 8.0 9.0 10.0 11.0 12.0 12.1 12.2 13 13.1 13.2 13.3 14.0 15.0 16.0

Description Application Designation & Frame size Number of units Manufacturer Type of motors Supply system fault level Rating Rated voltage Output Load factor Number of phases and frequency Speed Duty Type of duty Reference ambient temperature Installation Location Atmosphere Allowable variations in supply Conditions Voltage Frequency Combined Efficiency Rated power factor Power factor during starting

Bidders Details

Outdoor Corrosive & dusty

% % % %

+ 10 +5 10 * * *

ISSUE P0 TCE FORM 330 R1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A2 - MOTORS
Unit Specification Requirement * * DOL

SECTION : D

TCE-5259A-D-266205

SHEET 2 OF 5

Sl. No. 17.0 17.1 17.2 18.0 19.0 19.1 19.2 20.0 21.0 22.0 22.1 22.2 23.0 23.1 23.2 24.0 24.1 24.2 24.2.1 24.2.2 24.3 25.0 26.0 Current Full load Starting

Description

Bidders Details

Amps % FL

Method of starting Insulation Class of insulation Temperature rise by Resistance method Type of cooling Hazardous area division (IS:5572 or Equivalent) Earthing conductors Material Size Miscellaneous Shaft orientation & Mounting symbol Rotation as seen from nondrive end Bearings Make Type of Bearing Drive end Non drive end Permissible temperature rise for bearings Permissible vibration limits Degree of protection for motors Mm/sec mm Deg. C

Class F Temp. rise limited to Class B TEFC Non-hazardous

GS *

* *

* * *

As per IS 325 IP-55

ISSUE P0 TCE FORM 330 R1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A2 - MOTORS

SECTION : D

TCE-5259A-D-266205

SHEET 3 OF 5

Sl. No. 27.0 27.1 27.2 27.3

Description Terminal box Degree of protection Location as seen from nondrive end Short time a) Current b) Time

Unit

Specification Requirement IP-55 *

Bidders Details

kA (RMS) secs kA (peak)

50 0.25 105

27.4 28.0 28.1 28.2 29.0 30.0 31.0 32.0

Dynamic External cable details Type Size and no. of cores Normal winding connection Permissible No. of starts starts Hot thermal withstand time at 110% of the rated voltage. Starting time at 80% of the rated voltage. Thermal characteristics, starting characteristics and negative sequence characteristics to be furnished Weights and Dimensions Paint Shade Dimensioned drawing enclosed

Al. conductor, XLPE insulated * Star / Delta * * Sec Sec * *

33.0

**

34.0 35.0 36.0

* RAL 7032 *

* indicated above shall be filled by the Bidder and submitted along with the Bid. ** Bidder shall furnish the data after placement of order
ISSUE P0 TCE FORM 330 R1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A2 - MOTORS

SECTION : D

TCE-5259A-D-266205

SHEET 4 OF 5

SL.NO. BRIEF TITLE 1. THREE PHASE INDUCTION MOTORS 2. 3. 4. 5. ROTATING ELECTRICAL MACHINES SINGLE PHASE INDUCTION MOTORS CODE OF PRACTICE FOR CLIMATE PROOFING DESIGNATIONS FOR TYPES OF CONSTRUCTION AND MOUNTING ARRANGEMENT OF ROTATING ELECTRICAL MACHINES TERMINAL MARKING & DIRECTION OF ROTATION FOR ROTATING ELECTRICAL MACHINERY DESIGNATION OF METHODS OF COOLING FOR ROTATING ELECTRICAL MACHINES DEGREES OF PROTECTION PROVIDED BY ENCLOSURE FOR ROTATING ELECTRICAL MACHINERY GUIDE FOR TESTING THREE PHASE INDUCTION MOTORS MEASUREMENT AND EVALUATION OF VIBRATION OF ROTATING ELECTRICAL MACHINES CLASSIFICATION OF HAZARDOUS AREAS FOR ELECTRICAL INSTALLATION DIMENSIONS OF SLIDE RAILS FOR ELECTRIC MOTORS PERMISSIBLE LIMITS OF NOISE LEVEL FOR ROTATING ELECTRICAL MACHINES GUIDE FOR TESTING INSULATION RESISTANCE OF ROTATING MACHINES TANGENT DELTA & DELTA TANGENT DELTA TEST IMPULSE VOLTAGE WITHSTAND TEST TEMPERATURE RISE MEASUREMENT OF ROTATING ELECTRICAL MACHINES TYPE OF DUTY AND CLASSES OF RATING ASSIGNED TO ROTATING ELECTRICAL MACHINES CBIP RECOMMENDATION FOR MOTORS

REFERENCE NUMBER OF STANDARDS IS-325 IS-4722 IS-996 IS IS-2253 BS-4999 BS BS BS-6751 BS IEC-34 IEC IEC IEC IEC-34-

6. 7.

IS-4728 IS-6362 IS-4691 IS-4029 IS-12075 IS-5572 IS-2968 IS-12065 IS-7816 IS-13508 IS BS

BS-4999 BSEN 60034

IEC-34-108 IEC-34-6-1994

8.

BS-4999

IEC-34-105

9. 10.

BS BS-4999

IEC-34 IEC-34-142

11.

BS

IEC-79

12. 13.

BS-4999-141 IEC BSEN 60034 -9-1994 BS BS IEC IEC IEC-34-15 BS BS IEC IEC IEC

14. 15. 16. 17. 18.

IS-12802 IS 12824

19.

ISSUE P0 TCE FORM 330 R1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A2 - MOTORS

SECTION : D

TCE-5259A-D-266205

SHEET 5 OF 5

NOTES 1. EQUIPMENT, ASSOCIATED ACCESSORIES, COMPONENTS/PARTS, RAW MATERIAL AND ESTS SHALL IN GENERAL CONFORM TO IS BS IEC 2. OFFERS CONFORMING TO OTHER AUTHORITATIVE STANDARDS MAY ALSO BE CONSIDERED/MAY NOT BE CONSIDERED.

ISSUE P0 TCE FORM 330 R1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 CONTROL CABINETS
Units Specific Requirements * Outdoor
0

SECTION : D

TCE-5259A-D266-205

SHEET 1 OF 2

Sl No. 1.0 1.1 1.2 1.3 1.4 1.5

Description General particulars Designation Location Design ambient temperature Type of mounting Cable entry a) Top / bottom b) Glands / conduits -size

Bidders Details

50 BY BIDDER AS REQUIRED GLANDS GS Flat *

1.6

Earthing conductor a) Material b) Type c) Size

1.7

Painting: a) Colour finish Exterior Interior b) Epoxy paint required yes/no yes ref.no. RAL-7032 Glossy white Yes To be furnished by the Bidder * IP 55

1.8 1.9 1.10 1.11

Control scheme & bill of material, enclosed Manufacturers name Degree of protection provided Control wiring / power wiring provided a) Material of conductor and size b) Conductor-solid/Straded Voltage Power devices, motor drives, etc. a) Supply voltage b) Duplicate feed

* *

2.0 2.1

415V, 3ph, 50hz / 240v, 1ph-n, 50hz provided

ISSUE P0 TCE FORM 330 R1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 CONTROL CABINETS
Unit Specification Requirement 110V AC Reqd./ Not Reqd. Required for deriving 110V, 1-ph AC supply 240V AC and shall be derived in respective panels by providing suitable transformer from 415V AC supply DOL AC-4

SECTION : D

TCE-5259A-D266-205

SHEET 2 OF 2

Sl. No. 2.2 2.3 2.4

Description Control voltage Control transformer Space heater/lighting supply voltage

Bidders Details

3.0 3.1 3.2

Other particulars when applicable Starters type Contactor rated duty (as per is:2459 & 8544)

DOL/REV / StarDelta

* indicated above shall be filled by the Bidder and submitted along with the Bid.

ISSUE P0 TCE FORM 330 R1

SPEC. NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A2 CONTROL CABINETS

SECTION : D

TCE-5259A-D-266205

SHEET 1 OF 1

1.0 1.1 1.2

APPLICABLE STANDARDS SWITCHGEAR GENERAL REQUIREMENTS FACTORY BUILT ASSEMBLIES OF SWITCHGEAR AND CONTROL GEAR FOR VOLTAGES UPTO AND INCLUDING 1000V. A.C. & 1200 V. D.C. AIR BREAK SWITCHES MINIATURE CIRCUIT BREAKERS H.R.C. CARTRIDGE FUSES IS-4237 IEC IS-8623 60439-1 BSEN-60947 BS-5486 IEC-

1.3 1.4 1.5

IS-13947 IEC-60405 IS-8828 (PI)

BSEN 60947-3 BS-3871 IEC-

IS-13703 BS-88 IEC60269-1 & IEC 60269-2 & IEC-602694 IS-8187 IS-13947 947-4-1 IS-13947 947-4-2 IS-13947 IS-2705 60185 IS-3156 60186 IS-3231 60255 IS-1248 60051 BSBS-775 BSEN-60947 BSBS-60044-1 BS-7625 BS-142 BS-89 IEC IECIECIECIECIECIECIECBS-159

1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14

D TYPE FUSES CONTACTORS STARTERS CONTROL SWITCHES/PUSH BUTTONS CURRENT TRANSFORMERS POTENTIAL (VOLTAGE) TRANSFORMERS RELAYS INDICATING INSTRUMENTS ARRANGEMENT FOR BUS BARS, MAIN CONNECTIONS AND ACCESSORIES A.C. ELECTRICITY METERS DEGREE OF PROTECTION

IS-5578 & IS11353 IEC IS-722 IS-13947 60947-1 BS-5685 BS-

1.15 1.16

IECIEC-

ISSUE P0

TCE FORM 330 R1

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : D SHEET 1 OF 6

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 OTHER EQUIPMENTS

TECHNICAL DATA TO BE FURNISHED BY THE BIDDER S.NO. 1.0 Description Unit Bidders Data

DISTRIBUTION BOARDS & LIGHTING PANELS (details shall be furnished separately for MDB & LP) ENCLOSURE 1 2 Type Thickness of sheet steel used a) b) c) d) 3 4 5 6 Front Back Side Bottom / top

Dimensions of the complete board / panel Total weight of the complete board / panel Feature provided to make cubicle dust proof Painting a) b) c) Colour Finish Details of painting procedure furnished

2.0 1 2

Bus bar Material Min clearance a) Between phase


ISSUE P0 TCE FORM 329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : D SHEET 2 OF 6

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 OTHER EQUIPMENTS
Phase to nearest earthed part

b) 3 4 5 3.0 1 2

Continuous current rating One sec. short time rating Temp rise over the ambient temp of 50 deg C SWITCHES Make Type a) b) Heavy duty switches combination

Heavy duty cubicle switches

3 4 5 6 7 4.0 1 2 3 4 5 6

Rated voltage Rated current Rated current currents and breaking

One sec. Short time rating Temp rise of contacts ambient temperature HRC FUSES Make Type Rated voltage Rated current Minimum fusing current at the ambient temp of 50 deg.C Fusing factor above

ISSUE P0 TCE FORM 329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : D SHEET 3 OF 6

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 OTHER EQUIPMENTS

7 8 9 10 5.0 1 2 3 4 5 6 6.0 1 2 3 4 7.0

Category of duty Rupturing capacity Temp rise at rated current Operation indication provided MINIATURE CIRCUIT BREAKER Make Type Rated voltage Rated current Breaking capacity Type of protective device RECEPTACLES (FOR EACH TYPE) Make Type quantity Ratings LIGHT CIRCUIT Conduit

1 2 3

Make & Type Sizes used Catalogue Junction Boxes

1 2

Make & Type Sizes used


ISSUE P0 TCE FORM 329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : D SHEET 4 OF 6

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 OTHER EQUIPMENTS

Catalogue no Terminals within junction

1 2 8.0 1 2 3 4

Make &Type Catalogue no CABLE Make Type Applicable standard a) b) Voltage grade Suitable for service voltage and unearthed system

Max conductor temperature above 50 deg.C ambient temperature a) b) Continuous Short time

Conductor a) b) c) Material Size mm2 No.& diameter of wires in each conductor

Insulation a) b) Material Thickness

Sheath a) b) Material Thickness mm


ISSUE P0 TCE FORM 329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : D SHEET 5 OF 6

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 OTHER EQUIPMENTS
- Inner sheath - Outer sheath

9 10 11 12

Approx overall diameter Standard drum length Net weight of cable kg / m Continuous current rating for standard IS condition cable laid in direct a) b) c) In ground In duct In air

13 14

Short circuit current for one Sec Electrical parameters at max operation temperature a) b) c) Resistance ohm/km Reactance 50 c/s ohm/km Impedance ohm/km

15 16 17 9.0

Derating factors Routine tests proposed to be carried out Type tests carried out

AVIATION OBSTRUCTION LUMINAIRE 1 2 Make & type Watt

10.0

PHOTOELECTRIC FIXTURES DETECTOR 1 Make


ISSUE P0 TCE FORM 329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : D SHEET 6 OF 6

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A1 OTHER EQUIPMENTS

2 11.0

Rating

LIGHTING FIXTURES (To be furnished for each type) 1 2 Make Type

12.0

1100 V GRADE PVC WIRING CABLE STRANDED Copper 2.5 mm2 Copper 4.0 mm2 1 Make GI CONDUIT PIPES a) b) Size Make

13.0

14.0

GI STRIPS / PIPE a) b) Size Make

15.0

EARTHING ELECTRODE a) b) Size Make

ISSUE P0 TCE FORM 329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : D SHEET 1 OF 1

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT DATA SHEET A2 OTHER EQUIPMENTS

APPLICABLE STANDARDS

1. PROTECTION LIGHTNING 2. EARTHING 3. AVIATION LIGHTNING

AGAINST

IS 2309

IS 3043 WARNING IS 4998

4. DUST PROOF ELECTRIC LIGHT FITTINGS 5. SWITCHES 1.

IS 4012

IS 13947

NOTES

THE EQUIPMENT, ASSOCIATED ACCESSORIES, COMPONENT PARTS, RAW MATERIALS AND TESTS SHALL IN GENERAL CONFORM TO : IS BS IEC

ISSUE P0 TCE FORM 329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : F1 SHEET 1 OF 2

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SCHEDULE OF PRICES

SCHEDULE OF PRICES SL NO (1) 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Details (2) Rack and pinion lift with accessories (Mast structure, Drive system, Control cabinet etc.) Main distribution board Normal Lighting panel Normal Emergency Lighting Panel Aviation double obstruction luminaire LED type corrosion resistant Medium intensity Photo electric light device with all accessories and manual bypass switch Industrial well glass dust tight 70W HPSV light fixtures with accessories 15A 3 phase 4 pin industrial type power receptacle with controlling switch mounted in weather proof box along with loose matching plug 63A welding receptacle mounted in weather proof box Conduits and pull boxes Junction boxes, earth wire fixing accessories, clamps etc. Supplying, laying and termination of incoming and outgoing cables Complete lightning system for chimney which includes horizontal air termination conductor, down conductors, test link box and other necessary fixing accessories as required including interconnection with earth grid Qty (3) 1 no. 1 no. 1 no. 1 no. 24 nos. 2 nos. 199 nos. Unit Price (4) Total Price (5)

8.0

10 nos.

9.0 10.0 11.0 12.0

10 nos. As required Lumpsum Lumpsum

13.0

Lumpsum

ISSUE P0 TCE FORM 329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : F1 SHEET 2 OF 2

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SCHEDULE OF PRICES

SL NO (1)

Details (2) Complete earthing system for chimney which includes earth electrode, GS flat, GI wire, Test earth pits, earthing of equipments included in the scope and other necessary fixing accessories as required including interconnection with purchasers earth grid Total FOB Prices/Ex-works Prices for scope of supply including design and engineering integral to the equipment, packing and forwarding for equipments included in the scope Total Prices for erection, Testing and commissioning (including transport to site) for equipments included in the scope Total FOB Prices/Ex-works Prices including packing and forwarding for special Erection & Maintenance tools and tackles as per Schedule-F7 Total FOB Prices/Ex-Works Prices including packing and forwarding for Recommended Spares as per Schedule-F6 Total FOB Prices/Ex-Works Prices including packing and forwarding for Mandatory Spares as per Schedule-F5 Essential spares item wise price as per the list furnished in Section-C SIGNATURE NAME

Qty (3)

Unit Price (4)

Total Price (5)

14.0

Lumpsum

15.0

16.0

17.0

18.0

19.0 20.0

COMPANY SEAL

DESIGNATION DATE

COMPANY---------------

ISSUE P0 TCE FORM 329 R3

SPEC.NO.

TCE-5259A-D-266205

TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT OVERALL TIME SCHEDULE

SECTION : F2 SHEET 1 OF 1

OVERALL TIME SCHEDULE Sl. No. 1.0 Work Description Design and Engineering Weeks from date of Notice To Proceed Start Finish

2.0

Manufacture

3.0

Delivery

4.0

Erection, Testing and Commissioning

Note:

The shipment schedule with details of equipment covered in each shipment shall be furnished. SIGNATURE NAME

COMPANY SEAL

DESIGNATION DATE

COMPANY---------------

ISSUE P0 TCE FORM NO.329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : F3 SHEET 1 OF 1

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SCHEDULE OF DEVIATIONS FROM TECHNICAL SPECIFICATION

SCHEDULE OF DEVIATIONS FROM TECHNICAL SPECIFICATION All deviations from the Technical Specification shall be filled in by the Bidder clause by clause in this schedule.

SECTION

SPECIFICATION

CLAUSE NO.

DEVIATION

The Bidder hereby certifies that the above mentioned are the only deviations from the Purchasers Technical Specification for this enquiry. The Bidder further confirms that in the event any other data and information presented in the Bidder's proposal and accompanying documents including drawings, catalogues, etc., are at variance with the specific requirements laid out in the Purchaser's Technical Specifications, then the latter shall govern and will be binding on the Bidder for the quoted price.

SIGNATURE NAME COMPANY SEAL DESIGNATION DATE COMPANY---------------

ISSUE P0 TCE FORM NO. 329 R3

SPEC.NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SCHEDULE OF DEVIATIONS FROM GENERAL & SPECIAL CONDITIONS OF CONTRACT

SECTION : F4

TCE-5259A-D-266205

SHEET 1

OF 1

SCHEDULE OF DEVIATIONS FROM GENERAL & SPECIAL CONDITIONS OF CONTRACT All deviations from the General & Special conditions of contract shall be filled in by the Bidder clause by clause in this schedule.

SECTION

SPECIFICATION

CLAUSE NO.

DEVIATION

The Bidder hereby certifies that the above mentioned are the only deviations from the Purchaser's General Conditions of Contract and Special Conditions of Contract. The Bidder further confirms that in the event any other data and information presented in the Bidder's proposal and accompanying documents including drawings, catalogues, etc., are at variance with the specific requirements laid out in the Purchaser's General & Special Conditions of Contract, then the latter shall govern and will be binding on the Bidder for the quoted price.

SIGNATURE NAME COMPANY SEAL DESIGNATION DATE COMPANY--------------ISSUE P0 TCE FORM NO. 329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : F5 SHEET 1 OF 1

TCE-5259A-D-266205

2x600 MW SALAYA THERMAL POWER PLANT

ESSAR POWER GUJARAT LIMITED

SCHEDULE OF MANDATORY SPARES

SCHEDULE OF MANDATORY SPARES The Bidder shall indicate the price for the mandatory spares Manufacturer and Part No. 2 Delivery Period (weeks) 3 Qty. Description Material per Unit 4 5 6 Unit Price Qty. FOB /ExIncluded works 7 8 Total Price (7x8) 9

Item No. 1

Remarks 10

SIGNATURE NAME COMPANY SEAL DESIGNATION DATE COMPANY---------------

ISSUE P0 TCE FORM NO. 329 R3

SPEC.NO. TITLE

TCE-5259A-D-266205

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SCHEDULE OF RECOMMENDED SPARES

SECTION : F6 SHEET 1 OF 1

SCHEDULE OF RECOMMENDED SPARE PARTS The Bidder shall give a list of spare parts recommended for three years for troublefree performance of the equipment offered by him in the format given below. Item No. 1 Manufacturer and Part No. 2 Delivery Period (weeks) 3 Qty. Description Material per Unit 4 5 6 Unit Price Qty. FOB /ExIncluded works 7 8 Total Price (7x8) 9 Remarks 10

SIGNATURE NAME COMPANY SEAL DESIGNATION DATE COMPANY-------------

ISSUE P0 TCE FORM NO.329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : F7 SHEET 1 OF 1

TCE-5259A-D-266205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SCHEDULE OF SPECIAL ERECTION, MAINTENANCE TOOLS AND TACKLES

SCHEDULE OF SPECIAL ERECTION, MAINTENANCE TOOLS AND TACKLES The Bidder shall give the list of special erection, maintenance tools and tackles offered by him in the format given below Unit Price / FOB / Exworks 4

Item No. 1

Particulars 2

Quantity Required 3

Total Price (3 x 4) 5

SIGNATURE NAME COMPANY SEAL DESIGNATION DATE

COMPANY-------------

ISSUE P0 TCE FORM NO.329 R3

SPEC.NO. TITLE

TCE CONSULTING ENGINEERS LIMITED ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SCHEDULE OF PLACES OF TEST AND INSPECTION
SCHEDULE OF PLACES OF TEST AND INSPECTION

SECTION : F8

TCE-5259A-D-266205

SHEET 1 OF 1

The Bidder shall indicate the item of Equipment supplied, name of the MANUFACTURER or SUBCONTRACTOR and place of test and inspection as shown below: ITEM OF EQUIPMENT MANUFACTURER / SUBCONTRACTOR PLACE OF TESTING & INSPECTION

SIGNATURE NAME COMPANY SEAL DESIGNATION DATE

COMPANY-------------

ISSUE P0 TCE FORM NO.329 R3

SPEC.NO.

TCE CONSULTING ENGINEERS LIMITED


TITLE

SECTION : F9 SHEET 1 OF 1

TCE-5259A-D-266-205

ESSAR POWER GUJARAT LIMITED 2x600 MW SALAYA THERMAL POWER PLANT SCHEDULE OF WEIGHTS AND DIMENSIONS
SCHEDULE OF WEIGHTS AND DIMENSIONS

The Bidder shall state the weights and dimensions of various packages for shipment comprising the scope.

DESCRIPTION

DIMENSIONS (IN METERS)

WEIGHT (IN TONNES)

SIGNATURE NAME COMPANY SEAL DESIGNATION DATE

COMPANY-------------

ISSUE P0 TCE FORM NO.329 R3