1 Item Description of Item Unit No 1 Earth work excavation of in site all kinds soil for foundation trenches Cum

Erection andin maintenance office of and removal the same after including. layout, providing center lines, local bench-mark pillars, leveling, ramming and preparing the base, fixing bamboo spikes and marking layout with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking, cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and accepted by the Engineer, subject to submit method statement of carrying out excavation work to the Engineer for approval. However, Engineers approval shall not relieve the contractor of his responsibilities and obligations under the contract. Layout and marking for earthwork in excavation in foundation accepted by the Engineer. [Plinth area of the structure shall be considered for measurement] Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in soft clayey soil / loose sand / silt 2 One layer of brick flat soling in foundation or in floor with first class or sqm. picked jhama bricks including preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer. Earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or any other means loading and unloading at both ends including leveling, watering and consolidating including local carriage each layer up to finished level including cost of water and test (carried from beyond 300 m) etc. all complete and accepted by the Engineer. For other than Dhaka, Ctg., Sylhet, Rajshahi, Barishal, Khulna metropolitan area and N'ganj district Exposed brick works (for exterior wall without outside plaster) with cum special quality sorted out first class bricks, very carefully laid in cement sand (F.M. 1.2) mortar (1:4)) in superstructure with uniform width and depth joints, true to vertical and horizontal lines including raking out joints scaffolding, soaking the bricks at least for 24 hours before use, washing and screening of sand. Curing at least for 7 days and high class flush pointing with cement sand (F.M. 1.2) mortar (1:1) including cost of water, electricity and other charges etc all complete and accepted by the Engineer. (Cement: CEM-II/A-M) In ground floor 125 mm brick works with first class bricks in cement sand (F.M. 1.2) sqm. mortar (1:4) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer. (Cement: CEM-II/A-M) Reinforced cement concrete works using steel shutter with minimum cement content relates to mix ratio 1:1.5:3 having minimum f'cr = 30 Mpa, and satisfying a specified compressive strength fc = 25 Mpa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1-CEM 1 (32.5 to 52.5 N) / ASTM-C 150 Type I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33, making, placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper, fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering including cost of water, electricity, testing and other charges etc. all complete approved and accepted by the Engineer. (Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing)

Quantity 2,015.00

Unit Rate 270.00

Total 544,050.00

660

375.00

247,500.00

1350

180.00

243,000.00

260

5,750.00

1,495,000.00

2030

725.00

1,471,750.00

Item No

Description of Item

Unit

Quantity

Unit Rate

Total

Individual and continuous footings of column plinth level. the same after Erection maintenance of site office at and removal i ii 7 Concrete Formwork/shuttering, prop and necessary supports etc. (steel) Reinforced cement concrete works using steel shutter with minimum cement content relates to mix ratio 1:1.5:3 having minimum f'cr = 30 Mpa, and satisfying a specified compressive strength fc = 25 Mpa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1-CEM 1 (32.5 to 52.5 N) / ASTM-C 150 Type I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33, making, placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper, fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering including cost of water, electricity, testing and other charges etc. all complete approved and accepted by the Engineer. (Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing) cum sqm. 170 480 8,250.00 575.00 1,402,500.00 276,000.00

Foundation beam i ii 8 Concrete Formwork/shuttering, prop and necessary supports etc. (Steel) Reinforced cement using steel shutter with minimum Supplying and mixing concrete specified works type chemical admixture delivered from an cement content relates to mix ratio 1:1.5:3 having minimum f'cr = 30 Mpa, and satisfying a specified compressive strength fc = 25 Mpa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1-CEM 1 (32.5 to 52.5 N) / ASTM-C 150 Type I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33, making, placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper, fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering including cost of water, electricity, testing and other charges etc. all complete approved and accepted by the Engineer. (Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing) Pedestals, column, column capitals, lift walls and walls cum sqm. 158 1730 8,950.00 575.00 1,414,100.00 994,750.00

i ii 9

Concrete, Ground floor & below plinth level Formwork/Shuttering, prop and Necessary supports etc (Steel) Supplying, fabrication and fixing to details as per design deformed bar Per 100 reinforcement in concrete in accordance with BDS 1313 : 1991 standard Kg including straightening and cleaning rust, if any, bending and binding in position including supply of G.I. wires etc. complete in all respects and accepted by the Engineer. 400-grade deformed bar with minimum fy = 400 MPa & tensile strength at least 460 MPa: up to ground floor
Supplying, and fixing of Aluminium sliding composite window with doors as the U.S. and fixing of sliding doors as per the U.S. Pre-cast driven driven fitting pile micro-pile with reinforced with reinforced cement fixed concrete cement composite works concrete window with works minimum as per with Cast in situ pile with reinforced cement concrete works with minimum fitting of Aluminium composite swing doors with Supplying fixing Aluminium swing door as per U.S. fitting and fixing of Aluminium swing door with spandrel as per

160 2080 780

9,250.00 575.00 8,100.00

1,480,000.00 1,196,000.00 6,318,000.00

3 Item Description of Item No Pre-cast Supplying, driven driven fitting pile and micro-pile with fixing reinforced of with Aluminium reinforced cement fixed sliding concrete cement composite composite works concrete window with window works minimum as per with with 10 Minimum Cast in situ 12 mm pile thick with cement reinforced sand cement (F.M. concrete 1.2) plaster works with with neat minimum cement fitting of Aluminium composite swing doors with Supplying fixing Aluminium swing door as per the U.S. fitting and fixing of Aluminium swing door with spandrel as per Erection and maintenance of site office and removal the same after finishing to plinth wall (1:4) with cement up to 150 mm below ground level with neat cement finishing including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) Ground floor. 11 Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to wall both inner-and outer surface, finishing the corner and edges including washing of sand cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) Ground floor.

Unit sqm

Quantity 2750

Unit Rate 225.00

Total 618,750.00

sqm

4880

325.00

1,586,000.00

12

Cement Paint of approved quality and colour delivered from authorized local sqm. agent of the manufacturer in a sealed container, made from water based powder mixed with water (1:1), applying first coat, curing the same after six hours for 24 hours, second coat applied and curing the same for 7 (seven) days etc, taking care and cleaning the surface fully from grease, oily substances, old paints, lime wash, fungus, algae etc., sand papering the surface before applying 1st and 2nd coat, complete including cost of electricity, water and other changes etc. complete in all floors and accepted by the Engineer. Supplying, fitting and fixing 12 BWG barbed wire (2 ply, 4 points) in fencing work @ 150 mm c/c in both horizontally and vertically, supported by 38 x 38 x 6 mm M.S. angle post (300 mm embedded in R.C.C. or in brick work with a cement concrete base of 75 x 75 x 300 mm) 600 mm vertical and 450 mm inclined or as per requirement @ 2.4 m c/c including straightening, binding the joints with 18 BWG wire making holes in the angle etc. in /c supplying of all necessary materials complete in all respect and accepted by the Engineer. (Rate is excluding the cost of R.C.C or brick work or C.C. which is to be paid as per corresponding items in the schedule)
Supplying, fitting, fixing, and installation of Ordinary type M.S. gate (double leaf) of any design and shape with 38 x 38 x 6 mm M.S. Angle outer frame having 16 mm dia M.S. rod placed vertically @ 75 mm c/c. at bottom part and top part (arrows) and also placed horizontally at bottom for interconnection of 16 mm dia M.S. rod placed vertically as per design, the top part covered with 18 BWG M.S. sheet and fixed with 4 Nos. 38 x 6 mm F.I. bars placed diagonally and 4 Nos. 38 x 6 mm F.I. bars placed horizontally and vertically all passing through the center, providing locking arrangements on 3 mm thick M.S. plate one for main gate and one for minimum 300 x 1025 mm pocket gate with 38 x 38 x 6 mm M.S. angle and 16 mm dia M.S. rod placed vertically @ 75 mm c/c, providing 38 x 38 x 6 mm M.S. angle clamps fitted and fixed with the outer frame of the main gate, the clamp being embedded in R.C.C. or R.C.C. core pillar with cement concrete (1:2:4) in masonry including cutting holes and mending good the damages, finishing, curing etc. including riveting, welding as and where necessary, painting two coats with approved quality of synthetic enamel paint over a coat of priming of anti-corrosive paint etc. all complete as per drawing, design and accepted by the Engineer. (Rate is excluding the cost of paint).

4880

125.00

610,000.00

13

sqm

1070

850.00

909,500.00

14

sqm.

13.5

7,950.00

107,325.00

4 Item Description of Item Unit No 15 Painting to door and window frames shutters two coats approved sqm. Erection and maintenance of site and office and in removal thewith same after best quality and colour of synthetic enamel paint delivered from authorized local agent of the manufacturer in a sealed container, having highly water resistant, high bondibilty, flexible, using specific brand thinner applied by brass/roller/spray over a coat of priming elapsing time for drying including surface cleaning from dust, oil or dirt, smoothening, finishing and polishing with sand paper and necessary tools, scaffolding, testing charges etc. all complete in all floors approved and accepted by the Engineer.
Manufacturing, supplying, fitting and fixing collapsible gate of any design

Quantity 30

Unit Rate 170.00

Total 5,100.00

Total

20,919,325.00

Inword: BDT. Two crore nine lakh ninteen thousand three hundred & twenty five only. fitting, fixing and installation ordinary gate (double Supplying, fitting and fixing of and rolling shutter oftype any design and shape " Furnishing design of a production well by testing water and soil Manufacturing, supplying, fitting fixing G.I. pipe gateM.S. ofof any design and