Sei sulla pagina 1di 7

Service Documentation Braun OptiGlide - Jet

Market Release 4/98

PV 2250

4692

4692

BINC Rev: 3/98 BAG Rev: 2/98

Service Documentation
Exploded Drawing 4692

4692 - 2

BINC Rev: 9/99 BAG Rev: 2/98

Service Documentation
Spare Parts List 4692 Part Description
Sole plate Spacer tube Seal Valve nozzle Lower housing Screw Tube Screw Reflector Thermostat lever Slider Container cpl. Seal for container Screw Jet pump cpl. Spray/supershot pump cpl. Temperature control knob Upper housing Screw Pilot-light window Steam regulating knob Mains lead with PCB Cable clamp Screw Cover plate Screw PCB Cable clip Swivel bearing Measuring beaker

Pos. No.
1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31

Part Number
not for exchange 4316656 4316626 4316627 4693623 4316631 4316628 4316632 4316630 4316633 4316641 4692634 4316647 4318625 4316636 4314622 4691631 4692635 4318626 4693626 4318630 NLA 4318627 4318629 4692636 4318628 see position 23 4316651 4316653 4316649

4692 - 3

BINC Rev: 3/98 BAG Rev: 2/98

Service Documentation
Service Information 4692

Technical data: Nominal voltage: Nominal frequency: Nominal power: Sole plate temperature: 120 V 50 - 60 Hz 1200 W Maximum: Normal: 230 - 240 C < 110 C < 150 C < 200 C 12-16 g/min Only works in horizontal position. 0.1-0.4 g/operation 0.1-0.8 g/operation 0.1-0.8 g/operation 1 - 2.2 g/operation Only works in horizontal position

Flow quantities:

Jet: Super shot: Spray: Extra steam:

Automatic shut-off:

Mercury free. Yellow pilot light will flash when automatic shut-off is activated within approx.30 seconds if the iron is standing in horizontal position without being moved. 15 minutes if the iron is standing in vertical position without being moved. approx. 215 ml Die-cast metal, ceramic-coated (71 steam vents) Glow lamp approx. 1.95 Meters Measuring beaker The fuse and the thermostat may not be altered. The contacts may neither be bent, re-bent or re-soldered nor may they be bridged in any way. The special screws used in the device can only be untightened by means of a special screwdriver blade. For reasons of approbation and security, only these special screws are to be used.

Capacity, container: Sole plate: Temperature display: Length of mains lead: Accessory: Important:

Special screws:

4692 - 4

BINC Rev: 3/98 BAG Rev: 2/98

Service Documentation
Service Information 4692

Disassembly: Unscrew the screws (25) and remove the cover plate (26) to the backside. Unscrew the screws (27) and remove the swivel bearing (30) from the upper housing (18). Pull the glow lamp (28) out of the handle by the connecting leads. Disconnect all electrical plug-in connections. The mains lead (23) is provided with self-securing plug-in connectors; the securing pins must be pressed slightly backwards during the disassembling process. Due to UL regulations, the glow lamp (28) and the mains lead (23) cannot be separated from each other and must be replaced as one part only. Turn the steam regulation knob (22) clockwise until the double arrow mark is reached; then remove straight upwards. Unscrew the screws (14) and the screw (20) and remove the upper housing (18). Slide the slider (12) out of the lead in a downward movement. Press the water spray nozzle out of the lead in an upward movement. Remove the hoses of the pumps cpl. (15,16) from the tubes. Remove the pumps cpl. (15,16) by inserting a small screwdriver close to the leading pins. Pry the temperature control knob (17) upwards and remove the thermostat lever (11). Unscrew the screw (14) and remove tank cpl. (13). Snap out the reflector (10) by means of a screwdriver. Unscrew the screws (8,6) and separate the lower housing (5) from the contact position by slightly lifting the front part; then remove the lower housing upwards. Valve nozzle (4), seal (3) and both tubes (7) are contained in the lower housing (5) and can, now, be easily removed. Thermostat fuse and thermostat are fixed at the sole plate cpl. (1); these parts may not be repaired. Assembly: In general, the re-assembly is made in reverse order. However, the following points must be taken in consideration:

4692 - 5

BINC Rev: 3/98 BAG Rev: 2/98

Service Documentation
Service Information 4692

Before reassembling the lower housing (5), the valve nozzle (4), seal (3) and tubes (7) must be assembled orderly. Absolute care must be taken that the tank cpl. (13), the pumps cpl. (15, 16), the tube connections and all seals are watertight. Temperature Check: After each repair, the temperature must be checked at the center of the sole plate (marked X in the drawing) (see sketch 1). Measuring procedure: 1 . The device may not show any defect. 2. The steam regulating knob must be positioned at "0". 3. Fasten the measuring sensor at the center of the iron by positioning the slider of the temperature measuring device at 3 4. Operate the iron in the "Maximum" mode (max.). 5. Wait until the control display extinguishes for the first time. 6. Leave the iron in this mode for another approx. 3-5 minutes so that the temperature can stabilize. 7. Observe the temperature for a period of at least one on/off-cycle of the thermostat (see control display). During this period, the temperature must not exceed 230 C and not be considerably lower than 180 C. In case that the measuring device indicates a considerable variation, the sole plate must be exchanged, because an adjustment of the thermostat is not possible.

Special tools:

Torx Bit T-20 for screw (25): Item no.: 4000138

4692 - 6

BINC Rev: 3/98 BAG Rev: 2/98

Service Documentation
Reference Drawing 4692

4692 - 7

Potrebbero piacerti anche