Sei sulla pagina 1di 5

Chevron Bangladesh Drilling Morning Report

Date: 10/29/2013

Well Name: Bibiyana-18 Slot: 8 Rig: WDI 801 End Date:

Total Time: 36.10 Time from Spud: 36.10 Days Since Last DAFW / RI Case :
TVD End (mOTH): 3,670.26
Country Water Depth (m) Target Depth (MD) (mOTH)

Rpt No: 38 Hours: 12.00 1,085 / 129

SBU Drilling Well Category : Drlg Well Category 1


Depth End (MD) (mOTH): 4,031
Field Name Original Spud Date Actual End Date

Original KB to Mud Line (m) Target Depth (TVD) (mOTH)

Bibiyana
Actual Start Date

Bangladesh 7/16/2013 18:00 4,080


Total AFE Amount (Cost)

3,721.52 24,305,837

AFE/WBS Number

100632 Safety/Inspections
Date Safety Check Tour Des

10/29/2013 00:00 10/29/2013 00:00 10/29/2013 00:00 10/29/2013 00:00 10/29/2013 00:00 10/29/2013 00:00 10/29/2013 06:00 10/29/2013 06:00 10/29/2013 06:00 10/29/2013 06:00 10/29/2013 06:00 10/29/2013 06:30 10/29/2013 06:30 10/29/2013 06:30 10/29/2013 07:00 10/29/2013 10:00 10/29/2013 10:00 10/29/2013 10:00 10/29/2013 10:00 10/29/2013 10:00 10/29/2013 11:00 10/29/2013 11:30
Incident Cat.

Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit Safety Procedures Pre-Tour Safety Meeting

Night Night Night Night Night Night Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day

Gen. Crane Lifting @BYWP Replace lamp clean light @BYWP (PTW) Changing liner of mud pump @BYWP (PTW) RADAR, Ops, Tnt#09 & GEMS#02 @BYWP Cellar entry @BYWP (PTW) Gen. Forklift Ops @BYWP Gen. Crane Lifting @BYWP General Hotwork at workshop @BYWP(PTW) Drill pipe inspection by Smith @BYWP(PTW) Work on TDS/ Drawworks @BYWP(PTW) Diesel Transfer @BYWP(PTW) w/Kamal Ent., RADAR Cards, Tnt#09 @BYWP Gen. Housekeeping (K/E) @BYWP Gen. Forklift Ops @BYWP Service engine 3016 @BYWP (PTW) Service engine at NOV @BYWP (PTW) Rig skidding from well 18 to well 19 @BYWP Pressure test BOP @BYWP (PTW) Nipple down BOP @BYWP (PTW) Transfer diesel to rig equipment@BYWP T-Card Audit RADAR, Ops, Tnt#09 & GEMS#02 @BYWP
Incident Desc

Safety / Environmental Incidents No safety or environmental incident Daily Operations


Report Start Date Report End Date

10/29/2013 00:00
Daily Field Est Total (Cost) Cum Field Est To Date (Cost) Daily Mud Field Est (Cost) Cum Mud Cost to Date (Cost)

10/29/2013 12:00
Drilling Hours (hr) Cum Rotating Hrs on Casing

371,877
Operations Summary

13,165,918

911,390

Cont. TOH 5" DP & RTTS running tool. Pull wear bushing, R/U TRS 5.5" handling equipment. RIH 16 jnt 5.5" tubing t/152.45m. P/U & M/U tubing hanger assembly & landing jnt. RIH & land tubing hanger. Set tubing hanger pack-off at 5000 psi. Test tubing hanger pack-off seal w/5000 psi. N/D 13 5/8" BOP stack. Install tubing bonnet and temporary wellhead. Pressure test bonnet seal carrier and wellhead @5000 psi. Rig move from BY-18 to BY-19. Operations temporary suspended on BY-18.
Comments Max Drill Gas Required Matls next day Avg Background Gas Head Count

148.0 Halliburton batch mixer in customs. CCTV: driller has camera for derrick,stabbing board, mud pump. STP recorder non-operational. Safety Observation Cards
Observation Typ # Rpts Com

60 Observed personnel was going to use an extension pipe with chain tong. Stopped him and reminded him to operate within design then we used two chain tong to do that job. Tenet #1 Harun Mia WDI Derrickman Daily Contacts
Contact

Dewayne Cole Raymond Teale Page 1/5 Report Printed : 10/30/2013

Chevron Bangladesh Drilling Morning Report

Date: 10/29/2013

Well Name: Bibiyana-18 Slot: 8 Rig: WDI 801 End Date:

Total Time: 36.10 Time from Spud: 36.10 Days Since Last DAFW / RI Case :

Rpt No: 38 Hours: 12.00 1,085 / 129

SBU Drilling Well Category : Drlg Well Category 1


Daily Contacts
Contact

Passagon Heamtanon Randy Roberts Palash Saha Miah Mohammed Fahad Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event? UE Time (hr) UE Ref No. Com

00:00

01:30

PRODTBG, TBG

TOH

1.50 Yes

1.50 13

Cont to TOH w/ 5'' DP & RTTS running tool F/94m T/surface. Inspect & L/D running tool. Shift 15 stds 5'' DP fr. drillers side to off driller side for wt distribution to skid. Pull wear bushing and M/U wash tool & wash hanger seating profile. R/U TRS 5.5'' handling equipment. RIH 16 joints 5.5'' tubing to 152.45m. P/U & M/U tubing hanger assembly & landing joint.RIH & land tubing hanger visually check if tubing hanger landed (ok). Line up to pump down choke line. Fill stack & close VBR's. Pressure up to 5000 psi & set tubing hanger pack -off (pack off start setting at 3,000 psi). TestTubing hanger pack off seal with 5000 psi (ok).

01:30 02:30 03:30 04:30

02:30 03:30 04:30 07:00

PRODTBG, TBG PRODTBG, TBG PRODTBG, TBG PRODTBG, TBG

WHDWB TBGRUN TIH TBGLNDHGR

1.00 Yes 1.00 Yes 1.00 Yes 2.50 Yes

1.00 13 1.00 13 1.00 13 2.50 13

07:00

12:00

PRODTBG, TBG

BOPN/D

5.00

Nipple down 13 5/8" BOP stack and nipple up on BY-19. Skid rig forward. Rig move from BY-18 to BY-19 at 12:00 hrs. ****Operations Temporarily suspended on BY-18**** Offline activities: Install Tubing bonnet and temporary wellhead. Pressure test bonnet seal carrier and wellhead to 5000 psi. Install BPV.

Personnel
Company Total Headcount SSE

Chevron Weatherford Weatherford Weatherford Aker-Kvaerner Weatherford Halliburton Weatherford MI Swaco Weatherford Weatherford Brandt - NOV HAL - Wireline Weatherford Weatherford Chevron Smith International Schlumberger Weatherford Weatherford Chevron

16 17 45 22 1 3 6 2 2 0 6 0 8 5 0 1 3

Rig Expat Rig National Shamolima Catering Wellhead Eng LWD/MWD Cementing DD Mud Engineers Gyrodata TRS Solids Control

Wireline SLS Ayun ent PetroBangla Inspection Slickline 0 Completion/Liner hands 0 Shafiq Brothers 0 WWT Report Printed : 10/30/2013

Page 2/5

Chevron Bangladesh Drilling Morning Report

Date: 10/29/2013

Well Name: Bibiyana-18 Slot: 8 Rig: WDI 801 End Date:

Total Time: 36.10 Time from Spud: 36.10 Days Since Last DAFW / RI Case :

Rpt No: 38 Hours: 12.00 1,085 / 129

SBU Drilling Well Category : Drlg Well Category 1


Personnel
Company Total Headcount

SSE

Weatherford Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Weatherford Mud Checks
Date Depth (MD) (mOTH) Depth (TVD) (mOTH)

0 0 0 11 0 0 0 0 0

BanglaCat Bangla Industrial Hunting Casing NOV Tech Cenelec HES SPM MD Totco Tech LAMPRELL
Sample Source Checked By YP Calc (lbf/100ft)

Mud/Brine Type

10/29/2013 12:00
Flow Line Temperature (C) Vis 3rpm Fluid Density (lb/gal)

4,031.0
Gel 10 sec (lbf/100ft)

3,670.26 NAF
Gel 10 min (lbf/100ft)

Active Pit
Gel 30 min (lbf/100ft)

13.20
Vis 6rpm Vis 300rpm

22.0
Vis 600rpm

30.0
Funnel Viscosity (s/qt)

33.0
PV Calc (Pas)

17 0
ROC (Wet) (% by wt) (lb/lb) Retort NAF by Volume (%)

8
pH Filtration Sz (m) NAF/Water Ratio Chlorides (mg/L)

9
CaCl2 (mg/L)

55
Electric Stability (V)

93
Water Phase Salinity (mg/L)

71 348,900
Retort Water by Volume (%)

49,500
High Gravity Solids (lb/bbl) Corrected Solids (%)

294,674.00 24.87
API Filtrate (cc/30min) API Filter Cake (1/32")

725.0
Retort Solids (% by Volume) (%)

301.15
NaCl (mg/L)

27.00
HTHP Filtrate (cc/30min)

14.50
HTHP Filter Cake (1/32")

58.50 1
Visibility (km)

80.1/19.9 Weather Conditions


Wave Ht (m) Swell Ht (m) Wave Dir () Wind Spd (knots) Wind Dir P Bar (mmHg) T High (C)

2.4
T Low (C)

Support Vessels
Vessel Name Vessel Type Arrival Date Depart Date Note

Unscheduled Events
Referen ce No. Start Date End Date Event Type Unsch Maj Cat Unsch Detail Description Accountable Party Contractor

13

10/25/2013

10/29/2013

NPT

EQP

CSG LN

Trouble with liner hanger set. Problem with establish the circulation, restricted on flow path.

Rig Contractor Weatherford Casing & Tubing Running, Liner Hngrs/Whipst ocks
Consumed On Loc

Mud Additive Amounts


Des Date Rec

Barite Base Oil Df1 Ca Carb Fine Cacl2 / Nacl Caustic Soda Duo-Vis HRP Kwik Seal M Lime M-I Gel Mix 11F Nova Plus Novatec F Novatec S Pipelax-W Poly Plus Pot. Sulphate

10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 Page 3/5

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Report Printed : 10/30/2013

Chevron Bangladesh Drilling Morning Report

Date: 10/29/2013

Well Name: Bibiyana-18 Slot: 8 Rig: WDI 801 End Date:

Total Time: 36.10 Time from Spud: 36.10 Days Since Last DAFW / RI Case :

Rpt No: 38 Hours: 12.00 1,085 / 129

SBU Drilling Well Category : Drlg Well Category 1


Mud Additive Amounts
Des Date

Rec

Consumed

On Loc

Safe Surf W Safecide Saraline Versamod Versatrol M VG Plus VG-69 Job Supply Amounts
Supply Item Des

10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013 10/29/2013


Date Received Consumed Cum On Loc

0.0 0.0 0.0 0.0 0.0 0.0 0.0

Diesel Drill String/BHA BHA #<stringno>, <des>


Bit Run Nozzles (1/32") String Components Comment Drill Bit Length (m) String Length (m)

10/29/2013

4,391.0

0.0

IADC Bit Dull

Bit Total Fluid Area (nozzles) (in) Max Nominal OD (in)

BHA ROP (m/hr)

String/BHA Components
Item Des Len (m) Mass/Len (lb/ft)

Drilling Parameters
Wellbore Cum Depth Drilled (mOTH) Pick-Up String Weight (1000lbf) Depth Start (MD) (mOTH) TVD Start (mOTH) Cum Drilling Time (hr) Flow Rate (gpm) Drilling Torque Depth End (MD) (mOTH) TVD End (mOTH) RPM (rpm) Drill Time (hr) On Bottom Drill Time (hr) Stand Pipe Pressure (psi) Interval ROP (m/hr)

Weight on Bit (1000lbf)

Drill Str Wt (1000lbf)

Weight of String in Air (1000lbf)

Slack-Off String Weight (1000lbf)

Casing Strings
Casing Description Comment Set Depth (MD) (mOTH) Set Depth (TVD) (mOTH) Run Date

Casing Components
Top Depth (MD) (mOTH) Btm Depth (MD) (mOTH) Len (m) Jts Item Des OD (in) ID (in)

Tubing Strings
Tubing Description Set Depth (MD) (mOTH) Run Date

Tubing
Comment

199.21

10/29/2013

Run 16 Jnts of 5 1/2" tubing Tubing Components


Item Des Jts Len (m) OD (in) ID (in) Top (mOTH) Btm (mOTH)

Tubing Hanger Pup Joint 5 1/2" Tubing BOP Test


Date

1 1 16

0.49 2.89 183.31

9 5/8 5 1/2 5 1/2


Com

4.778 4.778 4.778

12.52 13.01 15.90

13.01 15.90 199.21

10/22/2013 Wellbores
Wellbore Name

Perform full BOP test. Annular 250/3500 psi other test 250/5000 psi
Parent Wellbore

Original Hole Directional Surveys


Description

Original Hole
Date

Actual Survey

7/18/2013

Page 4/5

Report Printed : 10/30/2013

Chevron Bangladesh Drilling Morning Report

Date: 10/29/2013

Well Name: Bibiyana-18 Slot: 8 Rig: WDI 801 End Date:

Total Time: 36.10 Time from Spud: 36.10 Days Since Last DAFW / RI Case :

Rpt No: 38 Hours: 12.00 1,085 / 129

SBU Drilling Well Category : Drlg Well Category 1


Survey Data
Date MD (mOTH) Incl () Azm () TVD (mOTH)

VS (m)

NS (m)

EW (m)

DLS (/30m)

Page 5/5