MATERIALS fcu 35 fy 500 h agg 20 Cover 25 DIMENSIONS

N/mm N/mm mm mm

gm 1.5 concrete gm 1.15 steel steel class A Density 23.6 kN/m (Normal weight concrete)

Min bar = 10 Max bar = 16 Nominal top steel ? Y Sectional Elevation

a= b= c= d= e= Going = Rise = Rise =


LOADING

600 2500 1200 -600 -100 250 1900 172.7

mm landing A h = 175 mm flight waist = 200 mm landing B h = 200 mm mm mm L = 4300 mm total 10 treads mm each step Rake = 34.64

Imposed Flight finishes Landing finishes


DESIGN

4.00 kN/m 1.60 kN/m 1.30 kN/m

47.08 kN/m ult (20.87 + 11.16)

37.81 kN/m ult (16.91 + 8.84)

LANDING A, gk = 4.13 + 1.30 = 5.43 kN/m FLIGHT, gk = 7.78 + 1.60 = 9.38 kN/m LANDING C, gk = 4.72 + 1.30 = 6.02 kN/m

n = 1.4 x 5.43 + 1.6 x 4.0 = 14.00 kN/m n = 1.4 x 9.38 + 1.6 x 4.0 = 19.53 kN/m n = 1.4 x 6.02 + 1.6 x 4.0 = 14.83 kN/m

Zero shear is at 0.6 + (47.08 - 16.80) /19.53 = 2.151 m from left M = 47.08 x 2.151 - 16.80 x 2.151 - 19.53 x 1.551/2 = 41.64 kNm/m d = 200 - 25 - 8 = 167 mm K = 0.0427 As = 604 mm/m PROVIDE H16 @ 280 B = 718 mm/m Enhanced by 17.9 % for deflection H10 @ 300 T in span L/d = 4,300 /167 = 25.749 < 20.0 x 1.235 x 1.050 = 25.930 allowed OK

Project Client Location

Spreadsheets to BS 8110
Advisory Group South Staircase
Originated from RCC71.xls' v4.0 on CD

The Concrete Centre


Made by Date Page

LANDING
2006 TCC

rmw
Checked

18-Nov-13
Revision

141
Job No

STAIR FLIGHTS AND LANDINGS to BS 8110:2005

chg

R68

MATERIALS fcu 35 fy 500 h agg 20 Cover 25 DIMENSIONS

N/mm N/mm mm mm

gm 1.5 concrete gm 1.15 steel Density 23.6 kN/m (Normal weight concrete)

Min bar = 10 Max bar = 16 Nominal top steel ? Y

a = 1200 mm b = 1200 mm c = 250 mm d = 175 mm


LOADING

depth, h = 175 mm width, w = 1200 mm L = 3000 mm

LANDING

Imposed Finishes Slab


gk

4.00 1.50 4.13


qk

kN/m kN/m kN/m kN/m kN/m

79.3 kN ult 74.0 kN ult 66.1 kN/m ult 61.6 kN/m ult n = 1.4 x 5.63 + 1.6 x 4.0 = 14.28 kN/m n1 = (1.4 x 20.87 + 1.6 x 11.16)/1.20 = 39.23 kN/m n2 = (1.4 x 16.91 + 1.6 x 8.84)/1.20 = 31.51 kN/m

Flight a reaction 20.87 Flight b reaction 16.91


DESIGN

11.16 8.84

Zero shear is at (66.11 - 2.50) /(14.28 + 39.23) + 0.175 = 1.364 m from left M = 66.11 x 1.364 - 14.28 x 1.364/2 - 39.23 x 1.189/2 = 49.15 kNm/m d = 175 - 25 - 8 = 142 mm K = 0.0696 As = 870 mm/m PROVIDE H16 @ 200 B = 1005 mm/m Enhanced by 12.7 % for deflection H10 @ 325 T in span L/d = 3,000 /142 = 21.127 < 20.0 x 1.021 = 21.516 allowed OK

Project Location

Spreadsheets to BS 8110 South Staircase


STAIR FLIGHTS AND LANDINGS to BS 8110:2005
Originated from RCC71.xls' v4.0 on CD 2006 TCC

Made by rmw

Job No R68

Date 18-Nov-13

CHOOSE BAR DIAMETERS


FLIGHT
M h assume d = K z As/m =% Clause b? Smax Dia As nom Dia S As' prov =%

LANDING
49.15 175 144 0.0677 132.20 855.20 0.5939 N 360.00 16 228 10 325 242 0.1702

41.64 200 169 0.0417 160.55 596.56 0.3530 N 422.50 16 260 10 300 262 0.1568

Lookup Tables
8 10 12 16 20 25 32 10 10 10 12 16 16 16 16 10 10 10 12 16 20 25 32 10 10 10 12 16 16 16 16 10 10 10 12 16 20 25 32

8 10 12 16 20 25 32

Disclaimer All advice or information from MPA-The Concrete Centre is intended for those who will evaluate the significance and limitations of its contents and take responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such advice or information is accepted by MPA-The Concrete Centre or its subcontractors, suppliers or advisors. Users should note that all MPA-The Concrete Centre software and publications are subject to revision from time to time and they should therefore ensure that they are in possession of the latest version. This spreadsheet should be used in compliance with the accompanying publication 'User Guide RC Spreadsheets: v4' available from The Concrete Centre www.concretecentre.com/rcdesign Tel +44 (0)1276 606800

Status of spreadsheet Public release version.

This spreadsheet is shareware but may not be used for commercial purposes until the user has registered with The Concrete Centre using the licence validation form available on The Concrete Centre website www.concretecentre.com/rcdesign

Revision history RCC71 Stair Flight & Landing - Single

Date
1-Apr-10 28-Jun-06 12-Nov-05 26-Aug-05 22-Jan-03 11-Oct-02 6-Aug-99

Version
RCC71 v4.0 RCC71 v3.1 RCC71 v3.0 RCC71 v2.2 RCC71 v2.1 RCC71 v2.0 RCC71v1.0

Action
Re-badged as TCC/Mineral Products Association. v3 release. Page nos, User Guide and registration details amended. Updated to 2005 versions of BS8110 & BS8666 15% base ratio increase now separtated out when flight 0.6L. Conditional formating added to top steel display. DETR logo replaced by DTI. Version 2 enhancements First public release. Includes b version comments