FOOTING DESIGN
FOOTINGDATA
Footing Length, L =
1.500 m
Footing Width, B =
5.250 m
Footing Thickness, T =
0.300 m
24.000 kN/m
Soil Depth, D =
0.600 m
18.000 kN/m
0.000
0.400
Uniform Surcharge, Q =
0.000 kPa
Allow. SB Pressure, qa =
250 kPa
PIERDATA
Number of Pier(s) =
2
Nomenclature
Pier #1
Pier #2
Xp (m) =
0.000
0.000
Zp (m) =
2.500
-1.750
Lpx (m) =
0.250
0.250
Lpz (m) =
0.250
0.250
h (m) =
0.600
0.600
PLAN
ELEVATIONXDIRECTION
ELEVATIONZDIRECTION
MATERIALPROPERTIES
CONCRETE
CompressiveStrength,c=
ModulusofElasticity,Ec=
Concretestrain,s=
Concreteprotection,cov=
30.00
25743
Mpa
Mpa
=4700cMpa
0.003
75
mm
REBARSS
YieldStrength,y=
ModulusofElasticity,Es=
422.00
200000.0
Mpa
Mpa
LOADDATA
CriticalL/C=
NodeNo.=
104
4
69
Pier #1
Pier #2
Py (kN) =
-335.30
Fx (kN) =
5.26
3.50
Fz (kN) =
2.93
-2.31
Mx (kNm) =
3.71
-3.25
Mz (kNm) =
11.59
8.93
768.27
8.76
0.63
0.47
20.52
-432.97
WEIGHTSANDLOADS
FoundationCentriod
Xc=
Yc=
Foundation,SoilandSurcharge
BaseWt=
SoilWt=
SurchargeWt=
Wtotal=
Excess
PierWts=
Py=
Pty=
Pier #1
0.23
335.30
335.53
0.00 m
0.00 m
56.70 kN
85.05 kN
0.00 kN
141.75
=LBTc
=LBDs
=LBQ
=BaseWt+SoilWt+SurchargeWt
Pier #2
0.45
768.27
768.72
0.23
432.97
433.19
TotalVerticalLoad
Pty=
y
Ptotal=
CHECKSTABILITY
SLIDINGCHECK
PASSIVESOILPRESSURE
Passivex=
Passivez=
FRICTIONFORCE
Ff=
SLIDINGALONGXDIRECTION
SumFx=
FSSliding.x=
768.72 kN
910.47 kN
0.00 kN
0.00 kN
364.19 kN
=(Appliedload+ExcessPierWt)
( pp
)
=Wtotal+Pty
=TB(Kps(D+T)+KpsD)
=TL(Kps(D+T)+KpsD)
(
g
)
=(PtotalSurchargeWt)
8.76 kN
41.57 >1.5,Pass =(Passivex+Ff)/SumFx
SLIDINGALONGZDIRECTION
SumFz=
FSSliding.z=
0.63 kN
581.77 >1.5,Pass =(Passivez+Ff)/SumFz
UPLIFTCHECK
Pyuplift=
Pydown=
FactorofSafety
FS.uplift=
0.00 kN
910.47 kN
=Ptotal+PyupliftSurchargeWt
OverturningaboutXaxis
Pier #1
PtyZp=
Fz(h+T)+Mx=
838.82
6.35
Mex=
Mox=
Eccentricity,ez=
Pier #2
80.74
1.03
758.08
5.32
80.74 kNm
1.03 kNm
0.088 m
=(PtyZp)
=(Fz(h+T)+Mx)
=(Mex+Mox)/Ptotal
OverturningMomentduetoPy
Pier #1
Mot.x=
0.00
Pier #2
0.00
0.00
TotalOverturningMomentaboutXaxis
MOT.x=
1.03 kNm
=(Mot.x)+Mox
ResistingMomentaboutXaxisduetoPy
Pier #1
Mrm.x=
1719.58
Pier #2
TotalResistingMomentaboutXaxis
MRM.x=
2470.72 kNm
FactorofSafety
FS.OTx=
2098.62
379.04
=Mrm.x+(BaseWt+SoilWt)B/2
OverturningaboutZaxis
Pier #1
PtyXp=
Fx(h+T)+Mz=
Pier #2
0.00
16.32
0.00
12.08
Mez=
Moz=
0.00 kNm
28.41 kNm
=(Pty*Xp)
=(Fx*(h+T)+Mz)
0.031 m
=(Mez+Moz)/Ptotal
Eccentricity,ex=
0.00
28.41
OverturningMomentduetoPy
Pier #1
Mot.z=
0.00
Pier #2
0.00
0.00
TotalOverturningMomentaboutZaxis
MOT.z=
28.41 kNm
=(Mot.z)+Moz
ResistingMomentaboutZaxisduetoPy
Pier#1
Pier#2
Mrm.z=
251.65
324.89
TotalResistingMomentaboutZaxis
MRM.z=
682.85 kNm
FactorofSafety
fS f
FS.OTz=
576.54
=Mrm.z+(BaseWt+SoilWt)L/2
SOILBEARINGPRESSURE
TotalResultantLoadandEccentricities
Ptotal=
910.47 kN
Eccentricity,ex=
0.031 m
Eccentricity,ez=
0.088 m
SolvefortheKCoefficient
ex/L=
ez/B=
FromFigure
0.021
0.017
K=
Hence,
1.22
qmax=
141.61 kPa
qmax <qa=250kPa,Pass
=K(Ptotal/(LB))
FACTOREDSOILBEARINGPRESSURE
CriticalL/C=
205
Pier #1
Pier #2
Puy (kN) =
-380.38
Vux (kN) =
9.50
7.37
Vuz (kN) =
3.16
-2.65
Mux (kNm) =
3.94
-3.78
Muz (kNm) =
20.43
17.09
Foundation,SoilandSurcharge
L.F.=
Wutotal=
Pier #1
Excess
L.F.PierWts=
Puy=
Puty=
0.32
380.38
380.69
862.22
16.86
0.52
0.15
37.52
-481.84
1.40
198.45
=LoadfactorforDeadLoads
=BaseWt+SoilWt+SurchargeWt
Pier #2
0.63
862.22
862.85
0.32
481.84
482.16
TotalVerticalLoad
Puty=
Putotal=
862.85 kN
1061.30 kN
=(Appliedload+ExcessPierWt)
=Wutotal+Puty
EccentricityalongZaxis
Pier #1
PutyZp=
Vuz(h+T)+Mux=
951.74
6.78
Pier #2
843.78
6.16
107.96
0.62
Muex=
Muox=
Eccentricity,euz=
107.96 kNm
0.62 kNm
=(PutyZp)
=(Vuz(h+T)+Mux)
0.101 m
=(Muex+Muox)/Putotal
EccentricityalongXaxis
Pier #1
PutyXp=
Vux(h+T)+Muz=
0.00
0
00
28.98
Muez=
Muoz=
Eccentricity,eux=
Pier #2
0 00
0.00
52.70
0.00
23.72
0.00 kNm
52.70 kNm
=(PutyXp)
=(Vux(h+T)+Muz)
0.050 m
=(Muez+Muoz)/Putotal
TotalResultantLoadandEccentricities
Putotal=
1061.30 kN
Eccentricity,eux=
0.050 m
Eccentricity,euz=
0.101 m
SolvefortheKCoefficient
eux/L=
euz/B=
FromFigure
K=
FactoredSoilBearingPressure
Hence,
qumax=
0.033
0.019
1.31
177.11 kPa
=K(Ptotal/(LB))
FOOTINGANALYSIS
FOOTINGANALYSISALONGXDIRECTION
eux/L=
0.033
qmin=
qmax=
108.00 kPa
161.53 kPa
quL=
quR=
108.00 kPa
161.53 kPa
Case1 ,e/L<1/6
=(16e/L)[Putotal/(LB)]
=(1+6e/L)[Putotal/(LB)]
BearingPressures
EffectiveLengthofBearing
Brg.X=
Brg.Z=
1.50 m
5.25 m
qatcriticalsection
q=
35.69 kPa/m
de=
0.215 m
effectivedepth
S il B i P
SoilBearingPressure
ShearDiagram
L=
quL=
MomentDiagram
1.5m
108.00kPa
distancetocriticalsection
Pier #1
d6=
d5=
d4=
d3=
d2=
d1=
qatcriticalsection
q6=
q5=
q
q4=
q3=
q2=
q1=
Pier #2
0.41
0.52
0.63
0.88
0.98
1.09
0.41
0.52
0.63
0.88
0.98
1.09
122.63
126.47
130.31
139.23
143.07
146.90
122.63
126.47
130.31
139.23
143.07
146.90
MaxBeamShearandBendingmoment
BeamShearalongZaxisat'd'distancefromfaceofcolumn
Pier #1
Pier #2
d6=
V(d6)=
0.41
193.98
0.41
193.98
d1=
V(d1)=
1.09
277.71
1.09
277.71
quR=
161.53kPa
BendingMomentaboutZaxisatfaceofcolumns
Pier #1
Pier #2
d4=
M(d4)=
0.63
92.54
0.63
92.54
d3=
M(d3)=
0.88
132.19
0.88
132.19
FOOTINGANALYSISALONGZDIRECTION
euz/B=
0.019
qumin=
qumax=
119.19 kPa
150.35 kPa
quL=
quR=
119.19 kPa
150.35 kPa
Case1 ,e/L<1/6
=(16e/L)[Putotal/(LB)]
=(1+6e/L)[Putotal/(LB)]
BearingPressures
EffectiveLengthofBearing
Brg.Z=
Brg.X=
5.25 m
1.50 m
Calculateqateachcriticalsection
q=
5.93 kPa/m
de=
0.20 m
ShearDiagram
B=
quL=
SoilBearingPressure
MomentDiagram
5.3m
119.19kPa
quR=
150.35kPa
distancetocriticalsection
Pier #1
d6=
d5=
d4=
d3=
d2=
d
d1=
qatcriticalsection
q6=
q5=
q4=
q3=
q2=
q1=
Pier #2
4.80
4.90
5.00
5.25
5.25
5.25
2
0.55
0.65
0.75
1.00
1.10
1.20
147.67
148.27
148.86
150.35
150.35
150.35
122.45
123.05
123.64
125.13
125.72
126.32
MaxBeamShearandBendingmoment
BeamShearalongXaxisat'd'distancefromfaceofcolumn
Pier #1
Pier #2
d6=
V(d6)=
4.80
296.94
0.55
78.75
d1=
V(d1)=
5.25
0.00
1.20
306.41
BendingMomentaboutXaxisatfaceofcolumns
Pier #1
Pier #2
d4=
M(d4)=
5.00
34.91
0.75
40.32
d3=
M(d3)=
5.25
0.00
1.00
17.88
CHECKFORFLEXURALSTRENGTH
XDirection:Bottom
Rebarsize
Rebarsnos
Rebarpitch
D16
8
mm
729 mm
BarArea=
ProvidedAs=
b=
d=
h=
201
1608
5250
201
300
mm
mm
mm
mm
mm
MaximumNegativeMoment
MaxMu=
132.19 kNm
StrengthReductionFactor
=
0.9
Rn=Mu/bd
Rn=
0.6925 N/mm2
r=
0.0017
r=0.85c/y[1(12Rn/0.85c)]
Minimum1=0.0018
min=
0.0018
[ACI318M08Para10.5.4
/
=
0.0022
andPara7.12.2.1]]
Minimum21=4/3*r
Minimum22=0.25*f'c^0.5/fy
=
0.0032
Hence,use
2=max(r,min/2)=
0.0017
Asreq.=2bd
Asreq.=
1756 mm2
<ProvideAs=
1608 mm2
Ratio=
1.09
FAIL
XDirection:Top
Rebarsize
Rebarsnos
D16
8
Rebarpitch
mm
729 mm
BarArea=
ProvidedAs=
b=
d=
h=
201
1608
5250
201
300
mm
mm
mm
mm
mm
MaximumNegativeMoment
MaxMu=
0.00 kNm
StrengthReductionFactor
=
0.9
Rn=Mu/bd
Rn=
0.0000 N/mm2
r=
0.0000
r=0.85c/y[1(12Rn/0.85c)]
Minimum1=0.0018
min=
0.0018
[ACI318M08Para10.5.4
Minimum21=4/3*r
=
0.0000
andPara7.12.2.1]
Minimum22=0.25*f'c^0.5/fy
=
0.0032
Hence,use
2=max(r,min/2)=
0.0009
Asreq.=2bh
Asreq.=
1418 mm2
<ProvideAs=
1608 mm2
Ratio=
0.88
PASS
ZDirection:Bottom
Rebarsize
Rebarsnos
D20
24
Rebarpitch
mm
59 mm
BarArea=
ProvidedAs=
b=
d=
h=
314
7540
1500
175
300
mm
mm
mm
mm
mm
MaximumNegativeMoment
MaxMu=
40.32 kNm
StrengthReductionFactor
=
0.9
Rn=Mu/bd
Rn=
0.9752 N/mm2
r=
0.0024
r=0.85c/y[1(12Rn/0.85c)]
Minimum1=0.0018
min=
0.0018
[ACI318M08Para10.5.4
Minimum21=4/3*r
=
0.0031
andPara7.12.2.1]
Minimum22=0.25*f'c^0.5/fy
=
0.0032
Hence,use
2=max(r,min/2)=
0.0024
Asreq.=2bd
Asreq.=
619 mm2
<ProvideAs=
7540 mm2
Ratio=
0.08
PASS
ZDirection:Top
Rebarsize
Rebarsnos
Rebarpitch
D20
24
mm
59 mm
BarArea=
ProvidedAs=
b=
d=
h=
314
7540
1500
175
300
mm
mm
mm
mm
mm
MaximumNegativeMoment
MaxMu=
344.99 kNm
StrengthReductionFactor
f=
0.9
Rn=Mu/fbd
Rn=
8.3445 N/mm2
r=
0.0249
r=0.85c/y[1(12Rn/0.85c)]
Minimum1=0.0018
min=
0.0018
[ACI318M08Para10.5.4
/
=
0.0332
andPara7.12.2.1]]
Minimum21=4/3*r
Minimum22=0.25*f'c^0.5/fy
=
0.0032
Hence,use
2=max(r,min/2)=
0.0249
Asreq.=2bd
Asreq.=
6538 mm2
<ProvideAs=
7540 mm2
Ratio=
0.87
PASS
REBARARRANGEMENTFORFOOTINGSLAB
XDirection
Bottom
Top
ZDirection
Bottom
Top
CHECKFORPUNCHINGSHEAR
Shearstrengthprovidedbyconcrete
Sh
h
id d b
Vc=v0.33cMpa2(box+boz)de
where
StrengthReductionFactor
EffectiveDepth
Perimeteraroundpier/column:
Pier #1
8D16@728mmO.C.
8D16@728mmO.C.
24D20@58mmO.C.
24D20@58mmO.C.
[ACI318M08Para11.3.1.1]
v=
de=
0.85
175 mm
Pier #2
box,m=
boz,m=
2(b
(box+b
boz)=
)
0.47
0.47
0.35
0.45
1.63
1.83
Shearstrengthprovidedbyconcrete:
Vc,kN=
438.52
492.56
Punchingshear
Areaofpunchingshear,m
Totalforcefromcolumn/pier
Pier #1
Ap=
Puy=
q2x=
q5x=
q2z=
q5z=
Rqn=
Vup=
Vc>Vup=
0.16
658.52
Ap = boxboz
Puy = Puty +LF[Ap(Tc+Ds+Q)]
Pier #2
0.21
759.99
qatd/2distancefromfaceofsupport/column
AlongXdirection
143.07
143.07
126.47
126.47
AlongZdirection
150.35
125.72
148.27
123.05
Totalforceactingonpunchedarea
Rqn = max(q5x+q2x,q5z+q2z)Apn
24.33
28.26
Netpunchingshear
Vup = Puy Rqn
634.19
731.73
Checkiftheshearstrengthprovidedbyconcretegreaterthanpunchingshear
FAIL
FAIL
CHECKFORWIDEBEAMSHEAR
WidebeamalongZdirection
MaximumShear,leftside
MaximumShear,rightside
MaxVuL=
MaxVuR=
193.98 kN
277.71 kN
Shearstrengthprovidedbyconcrete
Vc,kN=
835.19 kN
Vc=v0.17cMpaBde
where
StrengthReductionFactor
v=
0.85
p
de=
201 mm
EffectiveDepth
Checkiftheshearstrengthprovidedbyconcretegreaterthanbeamshear
PASS
Vc>Vup =
[ACI318M08Para11.3.1.1]
WidebeamalongXdirection
MaximumShear,leftside
MaximumShear,rightside
MaxVuL=
MaxVuR=
78.75 kN
306.41 kN
Shearstrengthprovidedbyconcrete
Vc,kN=
207.76 kN
Vc=v0.17cMpaLde
where
S
StrengthReductionFactor
h d i
v=
0 8 mm
0.85
EffectiveDepth
de=
175
Checkiftheshearstrengthprovidedbyconcretegreaterthanbeamshear
FAIL
Vc>Vup =
[ACI318M08Para11.3.1.1]
REINFORCEMENTDETAILS
ALONGZDIRECTION,L=1.5m
Bottombars24D20@58mmO.C.
Topbars24D20@58mmO.C.
ALONGXDIRECTION,B=5.25m
Bottombars8D16@728mmO.C.
Topbars8D16@728mmO.C.
REBARPLAN
FOOTING
Embedment,Df=900mm
Thickness,T=300mm
PEDESTAL
250mmx250mm
ELEVATION