Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Customer SEC-SOA
Extension of Muhayil
Project
S/S 132/33 KV
Location MUHAYEL
Contract #
40631024/00
Job #
Equipment Tag
6T1
RELAY DETAILS
RELAY ANSI NO.
87T
RELAY FUNCTION
TRANS. DIFF
RELAY MAKE
SIEMENS
NOMINAL CURRENT
1A
TYPE / STYLE
7UT612
60-125VDC
S. NO.
O.K
O.K
2-ELECTRICAL CHECKS:
O.K
O.K
O.K
OK
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Witnessed
By
Contract #
40631024/00
Job #
Equipment Tag
6T1
3- TRANSFORMER DATA:
RATIO: 132/13.8KV
MVA: 67 MVA
H.V SIDE VOLTAGE: 132KV
L.V SIDE VOLTAGE: 13.8KV
GROUP NO: DYN1
FREQUNCEY: 60 HZ
H.V SIDE C.T RATIO: 500/1
H.V SIDE C.T RATIO: 3000/1
IMPEDENCE VOLTAGE: 14%
H.V CALCULATED FULL LOAD CURRENT: 293.0 A = 0.586 A (sec value)
LV CALCULATED FULL LOAD CURRENT: 2803.0 A = 0.934 (sec value)
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Witnessed
By
Contract #
40631024/00
Job #
Equipment Tag
6T1
TEST METHOD
(Energize only one at a time by soft ware)
RESULT
Display 0
to 1
REMARKS
ENERGIZE BI 1 (High)
OK
Spare
OPTO 2
ENERGIZE BI 2 (High)
OK
Spare
OPTO 3
ENERGIZE BI 3 (High)
OK
Spare
OUTPUT
RELAY
No.
TEST METHOD
(Energize only one at a time by soft ware)
RL1
RL2
RL3
RL4
RESULT
Contact
Checked
REMARKS
OK
Relay trip
OK
Spare
OK
Spare
OK
Spare
Witnessed
By
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Page 3 of 11
Contract #
40631024/00
Job #
Equipment Tag
6T1
CT INPUT
1
(HV Side)
CT INPUT
2
(LV Side)
KVG
TRIP
P.U
PH A
D.O
TRIP
PH B
P.U
D.O
TRIP
P.U
PH C
D.O
TRIP
P.U
D.O
0.102
0.25
1.0
0.147
0.125
0.103
0.147
0.126
0.104
0.146
0.123
0.102
0.147
0.1
25
0.5
1.0
0.293
0.249
0.205
0.293
0.250
0.207
0.292
0.248
0.205
0.293
0.25
0
0.207
1.0
1.0
0.586
0.498
0.410
0.586
0.502
0.413
0.586
0.497
0.410
0.586
0.49
8
0.411
0.25
1.73
0.41
0.35
0.287
0.403
0.342
0.285
0.403
0.344
0.286
0.401
0.34
5
0.285
0.5
1.73
0.810
0.688
0.567
0.810
0.689
0.567
0.806
0.684
0.567
0.807
1.0
1.73
1.620
1.377
1.134
1.621
1.374
1.138
1.619
1.381
0.139
1.613
0.68
5
1.37
7
0.570
1.134
Select any Phase in HVS and inject current until pickup led then go up until trip contact operate then go
down again tell the pickup led disappear for delta winding program the O/P contact for each phase you
test every time
TRIP = IDIFF>* Kvg*In Trans /In CT
TRIP h.v = IDIFF>*1.0* 293/(500/1)= 0.586*IDFF> A
TRIP l.v = IDIFF>*1.73* 2803/(3000/1)= 1.62*IDFF> A
P.U =85% TRIP VALUE
D.O =70% TRIP VALUE
7- TIMING TEST (adress1625):
SETTING TIME
(S)
0.0
MEASURED TIME @ 2 Is
A
H.V
L.V
H.V
L.V
H.V
L.V
37.8ms
37.9ms
39.9ms
37.2ms
38.3ms
34.3ms
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Witnessed
By
Contract #
40631024/00
Job #
Equipment Tag
6T1
CT INPUT 2
(LV WINDING)
Kvg
CAL. Trip
(A)
Ph B
Ph C
1.5 In
1.0
0.879
0.87
9
0.876
0.878
27
27.4
28.4
1.5 In
1.73
2.43
2.41
8
2.418
2.425
27
27.4
27.6
Change the setting for I DIFF> to be 2 In then make pick up for I DIFF>> or make another contact for
I DIFF>> only
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Witnessed
By
Contract #
40631024/00
Job #
Equipment Tag
6T1
0.25
0.5
1
1.5
I1 (source1) I2 (source2)
0.293
0.586
0.879
0.81
1.62
2.43
Operating angle
(Either one source)
27.9
27
27.7
Measured slope
0.24
0.24
0.23
Slope calculation:
Slope
A = [M - M x cos ]
B = M x sin
Inject same phase (L1) to High side & low side by stable current in table with phase shift 180 and
increase the angle of HS till Trip then calculate the slop by this angle
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Witnessed
By
Contract #
40631024/00
Job #
Equipment Tag
6T1
II: slope 2 :
Slope2
0.50
1
1.5
2
I1 (source1) I2 (source2)
0.586
0.879
1.172
1.62
2.43
3.24
Operating angle
(Either one source)
59
58
51.1
Measured slope
0.49
0.48
0.34
Slope calculation:
Slope
A = [M - M x cos ]
B = M x sin
Inject same phase(L1) to High side & low side by stable current in table with phase shift 180 and
increase the angle of HS till Trip then calculate the slop by this angle
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Witnessed
By
Contract #
40631024/00
Job #
Equipment Tag
6T1
INJECTED
CURRENT
(A)
1
HV
LV
TRIP
BLOCK
TRIP
BLOCK
<16%
>16%
<16%
>16%
REMARKS
-
SETTING
%
30
INJECTED
CURRENT
(A)
0.4
HV
LV
TRIP
BLOCK
TRIP
BLOCK
<30%
>30%
<30%
>30%
REMARKS
-
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Witnessed
By
Contract #
40631024/00
Job #
Equipment Tag
6T1
Time set in
(s)
2.075
4.15
8.3
16.6
Time measured
(s)
126.3
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Witnessed
By
Contract #
40631024/00
Job #
Equipment Tag
6T1
Notes:
1. For this table, 0 is considered even.
2. Use this row if the I0Process setting for the tested winding is I0 Elimination. The settings
are Address 1106 for Winding 1, Address 1126 for Winding 2, and Address 1146 for Winding 3.
3. Use this row if the I0Process setting for the tested winding is either without or I0 CORRECTION. The settings
are Address 1106 for Winding 1, Address 1126 for Winding 2, and Address 1146 for Winding 3.In tests 1-3 current
is injected in one phase at any time; therefore, use the rows for 1-phase faults. The
other fault types are given if the user wishes to expand the tests.
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Witnessed
By
Contract #
40631024/00
Job #
Equipment Tag
6T1
Remarks
Test Inst. Used
FREJA300
Name: Eng.
Tested By
Mohamed
Shokry
Date:
20/07/09
Signature:
Witnessed
By