Report No.07
Date: 26/01/2013
Fixed Data
Block
Field
Well No.
Spud date
12
Bibiyana
BY-17
19/01/2013
Co-ordinate
Latitude
(deg. min. sec)
Longitude
(deg. min. sec)
RKB-GL
243546.232
913546.947
19.00 m
Well Data
Date
Report
No.
25/01/2013
Depth MD
1,715
07
Well
Drilling Company /
Configuration
Drilling Rig
/ type
Deviated
Weatherford/ WDI 801
Depth TVD
1,607.28
TVDSS
Offset / Horizontal
Displacement
-
Progress
638
Survey Report
MD, TVD, Incl , Azmth
Lithology
Depth
Percentage
Remarks
Time
Hours
From
To
00:00
04.30
4.50
04.50
05.00
00:50
05.00
20:00
15.00
20:00
20:30
00.50
20:300
00:00
03.50
17:00
17:30
0.50
17:30
19:30
2.00
19:30
21.30
2.00
21:30
23:00
1:50
23:00
00:00
1:00
Operations
Directionally drill 17-1/2" hole f/ 1493m to 1574m (AROP
w/conns - 18 m/hr). Back ream every connection and
pump high vis sweep as required.
Service rig & TDS.
Directionally drill 17-1/2" hole f/ 1574m to 1690m (AROP
w/conns - 7.73 m/hr). Back ream every connection and
pump high vis sweep as required.
Service rig & TDS.
Directionally drill 17-1/2" hole f/ 1690m to 1715m. (AROP
- 7.14 m/hr). Back ream each stand, pump high vis
sweeps as required. Tight spot observed after 6m slide at
1700m, straight pull off btm max pull 90k lbs over strg wt,
ok.
Note; AROP while sliding today was 6.8mph
Today drilled: 222m in 22hrs, AROP 10.09mph.
Total drilled: 1395m in 67.5hrs, AROP 20.67mph.
Drilling mode overall: 32.88% slide, 67.12% rotate
Lithology Depth Interval: Depth Interval: 1460.0-1700.0m
Sand/Sandstone (20-100%): Claystone (Tr-80%)
Recovered 21 grams metal filings off ditch magnet. Total
recovered 306 grams.
Cont to pump down setting ball & pressure up to 1900 psi and held pressure ,slack off
to 140k set liner hanger.TOL @2802.6m, BOL/FS@4372m, 3m pup jt@3515.5 m
Circulate liner vol (gas 3.48%). Cont to circulate btms up until gas less than 2%.
Flow check (static)
Line up and test cement lines to 5000psi. Ok. Pump 50 bbls of 8.4 ppg & 100 bbls of
12ppg MCS-O spacers with rig pump flush lines & drop dart.
Displace cmt w/10 bbl of drill water,10 bbl of 8.4 ppg inhibited potassium acetate
brine, 20 bbl of drill water, followed with 145 bbl of 11.5 ppg SBM.
RD cmt lines. P/U 4m on drill pipe to open actuator dogs, slack off and top of PBR,
continue slack off and lower drill pipe & energized element (30K0 & hold down
slips(50k) P/U to neutral weight.press test liner packer to 3000 psi (ok) PU a total of
12 m to get tail pipe above PBR.
Weight
ppg
Viscosity
sec/qt
11.00
Sand
(%)
-
60/61/62
Cake
Plastic
Viscosity
cp
25
Chlorides
mg/L
51,500
Yield
Gel
Point
lb/100 ft
lb/100 ft2
15
17/33/36
Water (%)
16.00
Filtrate
cc/30min
pH
3.4
temperature in
C
-
Temperature out
C
-
Pumps Data
Pump
No.
1
2
Made
Model
Liner
EMSCO
EMSCO
FB-1600
FB-1600
Bbl/Stk
(bbls)
Stk/Min
(SPM)
Gal/Min
(GPM)
Pressure
(psi)
AV-DC
(ft/min)
AV-DP
(Ft/min)
Bit Data
Bit No.
Size (in)
Manufacturer
Model
Nozzles
Serial No.
IADC code
In at (m)
Out at (m)
Drilled (m)
total Hours
WOB
RPM
Drilling Parameters
WOB
(klbs)
RPM
Pressure (Psi)
ROP
Torque
Shoe
depth
Casing
(Grade/Size)
Pump 1
....... spm, ...... psi
Pump 2
..... spm, .....psi
Pump 3 ......
spm, .... psi
Safety Checks
Meetings
Inspect
----
Remarks