CONSULTANT about Statutory Equipment (High pressure vessel, loading arm, boiler, piping, etc).

The following descriptions shall be the scope of work for CONSULTANT about Statutory Equipment (High pressure ves No 1 2 3 Contents Update, translate, explain/interpret the local rules and/or standards applicable to the project (Refer to JGCSs current list for possible government applications as Attachment-5) Identify the appropriate governmental organization from which JGCS needs to obtain the permits. Review the deliverables/designs and keep communication with government authority and get all necessary acceptance/approval for the equipment installation. Prepare and get acceptance from government authority complete procedure, time frame, list of equipment. And arrange the inspection before and during and after equipment installation, which require to get the final approval for operation. Including but not limited to: - Identify the equipment which needs to be inspected and registered. Clarify the necessity for Field/Shop inspection related to authority permitting and Vietnamese. (Refer to the equipment list as Attachment-7) - Standards/Statutory Regulations. Identify the extent of the requirement and the required deliverables from each inspection. - Support for preparation of the application documents.

- Review JGCSs deliverables and products against the applicable Vietnamese Standard/Statutory Regulation before inspection. - Arrange the inspection for the equipment when/where required. - Communicate and coordinate with the applicable governmental organization/s to obtain the permit/s on behalf of JGCS if required, or issue the certificate after the inspection completed if possible. - Coordinate between the governmental authorities and JGCS to facilitate answers to any comments regarding JGCSs application/s for permit/s, until the permit/s will be issued, if required. Consult and support for preparation of application to each authority for clarification in order to obtain the Authorities clarification/approval. Translate applications or answers to comments, etc., to local language to communicate to Authority, if required. All other work associated with government application & obtaining final acceptance of government for the statutory equipment design, manufacturing, installation, commissioning and operation.

5 6 7

Note: The interpretation of the Vietnamese Standards/Statutory Regulations shall be from the point of view of a that can be agreed with the relevant authorities.

about Statutory l, loading arm, boiler, piping, etc). TANT about Statutory Equipment (High pressure vessel, loading arm, boiler, piping, etc). Done by SGS SGS SGS Sub-Consultant Sub-Consultant has resposible for reviewing dliverables/designs by JGCS Co-ordination by Sub-Consultant Note Hire a law consultancy to update and interprete

Sub-Consultant

SGS

Sub-Consultant

SGS

SGS

SGS

Sub-Consultant

SGS support for clearifying equipment , related process conditions SGS support for clearifying equipment , related process conditions JGCS prepare all application document following SGS instructions Sub-Consultant has resposible for reviewing dliverables/designs by JGCS in accordance with Vietnamese statutory regulations

SGS Sub-Consultant

Sub-Consultant SGS Sub-Consultant to consult JGCS to revise application for permit/s

SGS Sub-Consultant SGS SGS

Sub-Consultant SGS

Hire a law consultancy to translates document if required Sub-Consultant

utory Regulations shall be from the point of view of a refinery and petrochemical industry application t can be agreed with the relevant authorities.

CONSULTANT about Fire Fighting The following descriptions shall be the scope of work for CONSULTANT about Fire Fighting. No 1 2 Contents Update, translate, explain/interpret the local rules and/or standards applicable to the project (Refer to JGCSs current list for possible government applications as Attachment-5) Identify the appropriate governmental organization from which JGCS needs to obtain the permit/s Review the deliverables/designs and keep communication with the governmental authorities and getting all necessary acceptance/approval for Fire Fighting design. (Refer to the list for fire fighting documents as Attachment-7) Prepare and get acceptance from the governmental authorities complete procedure, time frame, list of Fire Fighting equipment. And arrange the inspection before and during Fire Fighting equipment installation as well as Fire Fighting systems, which require handover tests.So that to get the final approval for operation. Including but not limited to: - Identify the equipment which needs to be inspected and registered. Clarify the necessity for Field/Shop inspection related to authority permitting and Vietnamese - Standards/Statutory Regulations. Identify the extent of the requirement and the required deliverables from each inspection. - Support for preparation of the application documents.

- Review JGCSs deliverables and products against the applicable Vietnamese Standard/Statutory Regulation before inspection. - Arrange inspection for the equipment when/where required. - Communicate and coordinate with the applicable governmental organization/s to obtain the permit/s on behalf of JGCS, if required. - Coordinate between the governmental authorities and JGCS to facilitate answers to any comments regarding JGCSs application/s for permit/s, until the permit/s will be issued, if required. Consult and support for preparation of application to each authority for clarification in order to obtain the Authorities clarification/approval. Translate applications or answers to comments, etc., to local language to communicate to Authority, if required. All other work associated with government application & obtaining final acceptance of government for Fire Fighting design, equipment manufacturing, installation, commissioning, and operation.

5 6 7

Note: The interpretation of the Vietnamese Standards/Statutory Regulations shall be from the point of view of a that can be agreed with the relevant authorities.

bout Fire Fighting

TANT about Fire Fighting. Done by SGS SGS Sub-Consultant has resposible for reviewing dliverables/designs by JGCS Co-ordination by Sub-Consultant Note Hire a law consultancy to update and interprete

SGS

Sub-Consultant

Sub-Consultant

SGS

Sub-Consultant

SGS

SGS

SGS

Sub-Consultant

SGS support for clearifying equipment , related process conditions SGS support for clearifying equipment , related process conditions JGCS prepare all application document following SGS instructions Sub-Consultant has resposible for reviewing dliverables/designs by JGCS in accordance with Vietnamese statutory regulations

SGS Sub-Consultant SGS Sub-Consultant SGS SGS

Sub-Consultant SGS Sub-Consultant SGS Hire a law consultancy to translate documentsif required Sub-Consultant Sub-Consultant to consult JGCS to revise application for permit/s

utory Regulations shall be from the point of view of a refinery and petrochemical industry application t can be agreed with the relevant authorities.

coordinator

suppervisor 1 engineer + 1 suppervisor

suppervisor

consultant engineer

1 engineer + 1 suppervisor

coordinator coordinator

coordinator consultant coordinator

coordinator