Project Title Location Owner

: : :

Proposed Two-Storey Building Bonfal Proper, Bayombong, Nueva Vizcaya Mr Benjamin Laguar!ia

SPECIFICATIONS

Prepare! by:

"onforme:

L#ON$%O & "O'T&L#' () "ivil #ngineer )eg No : ,,,,,,,,,,,,,,,,, T$N: ,,,,,,,,,,,,,,,,,,,, PT) No : ,,,,,,,,,,,,,,,,, %ate: ,,,,,,,,,,,,,,,,,,,, Place: ,,,,,,,,,,,,,,,,,,,

Mr * Mr+ Benjamin M Laguar!ia Owner

SITE WORK & -O). $N"L/%#% 0 'ta1ing of buil!ing, e+tabli+2ment of line+, gra!e+ an! benc2mar1+ 3 &ll e4cavation wor1+ inclu!ing all nece++ary +2oring, bracing an! !rainage of +torm water from +ite 5 &ll bac1filling, filling an! gra!ing, removal of e4ce++ material from +ite 6 Protection of property, wor1 an! +tructure+, wor1men an! ot2er people from !amage an! injury B L$N#', 7)&%#' &N% B#N"8M&).' 0 'ta1e out accurately t2e line+ of t2e buil!ing an! of t2e ot2er +tructure+ inclu!e! in t2e contract, an! e+tabli+2e! gra!e+ t2erefore, after w2ic2 +ecure approval by #ngineer before any e4cavation wor1 i+ commence! 3 #rect ba+ic batter boar!+ an! ba+ic reference mar1+, at +uc2 place+ w2ere t2ey will not be !i+turbe! !uring t2e con+truction of t2e foun!ation " #9"&V&T$ON 0 'tructural #4cavation #4cavation+ +2all be to t2e !ept2+ in!icate! bearing value+ #4cavation for footing+ an! foun!ation carrie! below re:uire! !ept2 +2all be fille! wit2 concrete, an! bottom of +uc2 +2all be level 3 &ll +tructural e4cavation +2all e4ten! a +ufficient !i+tance from t2e wall an! footing to allow for proper erection an! !i+mantling of form+, in+tallation of +ervice an! for in+pection &ll e4cavation +2all be in+pecte! an! approve! before pouring any concrete laying un!ergroun! +ervice+ or placing +elect fill material+ T2e contractor +2all control t2e gra!ing in t2e vicinity of e4cavate! area+ to prevent +urface !rainage running into e4cavation+ -ater w2ic2 accumulate+ in e4cavate! area+ +2all be remove! by pumping before fill or concrete i+ place! t2erein % ;$LL$N7 &N% B&".;$LL$N7 0 &fter form+ 2ave been remove! from footing+, pier+, foun!ation+, wall+, etc , an! w2en concrete i+ 2ar! enoug2 to re+i+t pre++ure re+ulting from fill, bac1filling may be !one Material+ e4cavate! may be u+e! for bac1filling &ll filling +2all be place! in layer+ not e4cee!ing +i4 <=> inc2e+ in t2ic1ne++, eac2 layer being t2oroug2ly compacte! an! ramme! by wetting, tamping, rolling # PL&"$N7 &N% "OMP&"T$N7 ;$LL 0 "ommon fill?+2all be approve! +ite e4cavate! material+ free from root +tump+ an! ot2er peri+2able or objectionable matter 3 'elect fill?+2all be place! w2ere in!icate! an! +2all con+i+t of cru+2e! gravel, cru+2e! roc1, or a combination t2ereof T2e material +2all be free from above vegetable matter+ an! +2all be t2oroug2ly tampe! after placing 5 Before placing fill material, t2e +urface upon w2ic2 it will be place! +2all be cleare! of all bru+2?root, vegetable matter an! !ebri+, an! t2oroug2ly wette! to in+ure goo! bon!ing between t2e groun!

; %$'PO'&L O; '/)PL/' M&T#)$&L' 0 &ny e4ce++ material remaining after completion of t2e eart2wor1 +2all be !i+po+e! of any 2auling an! +prea!ing in nearby +poil area+ !e+ignate! by t2e Owner #4cavate! material+ !epo+ite! in +poil area+ +2all be gra!e! to a uniform +urface II. CONCRETE AN REINFORCE CONCRETE & 7#N#)&L 0 /nle++ ot2erwi+e +pecifie! in 2ere, concrete wor1 +2all conform to t2e re:uirement+ of t2e &"$ Buil!ing "o!e ;ull cooperation +2all be given, ot2er tra!e+ to in+tall embe!!e! item+ Provi+ion+ +2all be ma!e for +etting item+ not place! in t2e form Before concrete i+ place!, embe!!e! item+ +2all 2ave been in+pecte! an! te+te! for concrete aggregate+ an! ot2er material+ +2all 2ave been !one B M&T#)$&L' 0 "ement for t2e concrete +2all conform to t2e re:uirement+ of +pecification+ for Portlan! cement <&'TM "?0@A> 3 -ater u+e! in mi4ing concrete +2all be clean an! free from ot2er injuriou+ amount of oil+, aci!+, al1aline, organic material+ or ot2er +ub+tance+ t2at may be !eleteriou+ to concrete or +teel 5 ;ine aggregate+B +2all con+i+t of 2ar!, toug2, curable, uncoate! particle+ T2e +2ape of t2e particle+ +2all be generally roun!e! or cubicle! an! rea+onably free from flat or elongate! particle+ T2e +tipulate! percentage+ of line in t2e +an! +2all be obtaine! eit2er by proce++ing of natural +an! or by t2e pro!uction of t2e +uitable gra!e! manufacture! +an! 6 "oar+e aggregate +2all con+i+t of gravel or roc1, or a combination of gravel an! roc1, coar+e aggregate+ +2all con+i+t of 2ar!, toug2, !urable, clean an! uncoate! particle+ T2e +ize+ of coar+e aggregate+ to be u+e! in t2e variou+ part+ of t2e wor1 +2all be in accor!ance wit2 t2e following: 'ize : CD an! 0E for all concreting wor1 @ )einforcing bar+ +2all conform to t2e re:uirement+ of &'TM +tan!ar! 'pecification+ for t2e Billet 'teel Bar+ for concrete reinforcement <& 0@?=3@> an! to +pecification for minimum re:uirement+ for t2e !eforme! +teel bar+ for concrete reinforcement <&5A@?@=> = &ll +econ!ary tie+ +uc2 a+ +tirrup+, +piral+ an! in+ert+ +2all be Billet 'teel Bar+ or !eforme! T2e main reinforcing bar +2all be a+ follow+: F mm !ia 0= mm !ia )'B fy?55,AAA p+i 0A mm !ia 3A mm !ia fy?6A,AAA p+i 03 mm !ia " P)OPO)T$ON$N7 &N% M$9$N7 0 Proportion of all material+ entering into t2e concrete +2all be cla++ & level ;or column+, beam+, gir!er, roof beam+ an! gutter

3 5

"la++ of concrete?concrete +2all 2ave 3G !ay+ cylin!er +trengt2 of 5,AAA p+i for concrete wor1, unle++ ot2erwi+e in!icate! in t2e plan+ Mi4ing?concrete +2all be mac2ine mi4e! Mi4ing +2all begin wit2in 5A minute+ after t2e cement 2a+ been a!!e! to t2e aggregate+ $n t2e ab+ence of t2e concrete mi4er, manual mi4ing i+ allowe!

% ;O)M' 0 7eneral ;orm+ +2all be u+e! w2erever nece++ary to combine t2e concrete an! +2ape it to t2e re:uire! line+, or to in+ure t2e concrete of contamination wit2B material+ caving from a!jacent, e4cavate! +urface+ ;orm+ +2all 2ave +ufficient +trengt2 to wit2+tan! t2e pre++ure re+ulting from placement an! vibration of t2e concrete, an! +2all be maintaine! rigi!ly in correct po+ition ;orm+ +2all be +ufficiently tig2t to prevent lo++ of mortar from t2e concrete ;orm+ for e4po+e! +urface again+t w2ic2 bac1fill i+ not to be place! +2all be in line wit2 a form gra!e plywoo! 3 "leaning an! oiling of form+ ?Before placing t2e concrete, t2e contact +urface of t2e form+ +2all be coate! wit2 a commercial form oil t2at will effectively prevent +tic1ing an! will not +tain t2e concrete +urface+ 5 )emoval of form+ ?;orm+ +2all be remove! in t2e manner w2ic2 will prevent !amage to t2e concrete ;orm+ +2all not be remove! wit2out approval &ny repair+ of +urface imperfection+ +2all be performe! at once an! airing +2all be +tarte! a+ +oon a+ +urface i+ +ufficiently 2ar! to permit it wit2out furt2er !amage # PL&"$N7 )#$N;O)"#M#NT 0 7eneral ?'teel reinforcement +2all be provi!e! a+ in!icate! toget2er wit2 all nece++ary tie wire+, +pacer+, +upporter an! ot2er !evice+ nece++ary to in+tall an! +ecure t2e reinforcement properly &ll reinforcement, w2en place! +2all be from loo+e, fla1y ru+t +cale, oil grea+e, clay an! ot2er coating an! forcing +ub+tance+ t2at woul! re!uce or !e+troy it+ bon! wit2 concrete 3 )einforcement +2all be place! accurately in place by t2e u+e of metal or concrete +upport+, +pacer+ an! tie+ 'uc2 +upport+ +2all be of +ufficient +trengt2 to maintain in t2e operation T2e +upport +2all be u+e! in t2e manner t2at t2ey will not be e4po+e! or contribute in any way, to t2e !i+coloration or !eterioration of concrete ; "ONV#H$N7 &N% PL&"$N7 "ON")#T# 0 "onveying concrete +2all be conveye! from mi4er to form a+ rapi!ly a+ practicable, by met2o!+ w2ic2 will prevent +egregation or lo++ of ingre!ient+ T2ere will be no vertical !rop greater t2an 3 @ meter+ e4cept t2ere i+ +uitable e:uipment i+ provi!e! to prevent +egregation an! w2ere +pecifically aut2orize! 3 Placing concrete +2all be wor1e! rea!ily into t2e corner+ an! angle+ of t2e form+ an! aroun! all reinforcement an! embe!!e! item+ wit2out permitting t2e material+ to +egregate "oncrete +2all be !epo+ite! a+ clo+e a+ po++ible to it+ final po+ition in t2e form +o t2at flow wit2in t2e ma++ !oe+ not e4cee! t2e <3> meter+ an! con+e:uent +egregation i+ re!uce! to minimum near form+ of embe!!e! item+, may be effectively compacte! into 2orizontal layer not e4cee!ing 5A centimeter+ in !ept2 wit2in t2e ma4imum lateral movement +pecifie!

5 6

Time interval between mi4ing an! placing concrete +2all be place! before initial +et 2a+ occurre! an! before it 2a+ containe! it+ water content for more t2an 6@ minute+ "on+oli!ation of concrete?concrete +2all be con+oli!ate! wit2 t2e ai! of t2e mec2anical vibrating e:uipment an! +upplemente! by 2an! +pa!ing an! tamping Vibrator+ +2all not be in+erte! into lower coar+e t2at 2ave con!en+e! initial +et an! reinforcement embo!ie! in concrete beginning to +et or alrea!y +et +2all not be !i+turbe! by vibration "on+oli!ation aroun! major embo!ie! part+ +2all be by 2an! +pa!ing an! tamping an! vibration+ +2all not be u+e! Placing concrete t2roug2 reinforcement $n placing concrete t2ru reinforcement, care +2all be ta1en t2at no +egregation of t2e coar+e aggregate+ occur on t2e bottom of t2e beam+ an! +lab+, w2ere t2e conge+tion of +teel near t2e form ma1e+ placing !ifficult, a layer of mortar of t2e +ame cement?+an! ratio+ an! u+e in concrete +2all be fir+t !epo+ite! to cover t2e +urface

7 "/)$N7 0 7eneral?&ll concrete +2all be moi+t cure! for a perio! of not le++ t2an +even <I> con+ecutive !ay+ by an approve! met2o! or combination applicable to local con!ition+ 3 Moi+t "uring ?'urface of t2e concrete +2all be 1ept continuou+ly wet by covering wit2 burlap pla+tic of ot2er approve! material t2oroug2ly +aturate! wit2 water an! 1eeping t2e cover wit2 +praying intermittent 2o+ing 8 ;$N$'8$N7 0 "oncrete +urface +2all not be pla+tere! unle++ ot2erwi+e in!icate! e4po+e! concrete +urface +2all be forme! wit2 plywoo! an! after removal of form t2e +urface +2all be +moot2, true to t2e line an! +2all pre+ent a fini+2e! appearance e4cept for minor !efect+ w2ic2 can be ea+ily repaire! by patc2ing wit2 cement mortar, or can be groun!e! to a +moot2 +urface to remove joint mar1+ of t2e form wor1 III. !ASONR" WORKS & M&T#)$&L 0 "oncrete 2ollow bloc1+ minimum face +2all 2ave a t2ic1ne++ of A3 in Nominal +ize +2all be 6D4GD40=D, @E4GE4l=E an! =E4GE4l=E 3 -all reinforcement +2all be 0A mm !ia an! 03 mm !ia +teel bar+ 5 'an! +2all be river +an!, well creepe! clean an! +ilicou+ free from loam an! ot2er impuritie+ 6 "ement +2all be +tan!ar! Portlan! cement &'TM, "?0@A?=G @ Mortar?Mi4 mortar from 5 to @ minute+ in +uc2 :uantitie+ a+ nee!e! for imme!iate u+e )etampering will not be permitte! if mortar +tiffen+ becau+e of pre?mature +etting %i+c2arge or !i+car! +uc2 material+ a+ well a+ t2o+e w2ic2 2ave not been wit2in 0 2our of mi4ing = Proportioning: "ement mortar +2all be one <0> Portlan! "ement an! two <3> part +an! by volume but not more t2an one <0> part Portlan! cement an! t2ree <5> part

+an! by volume B #)#"T$ON 0 &ll ma+onry +2all be lai! plumb, true to t2e line, wit2 level an! accurately +pace! coar+e+ an! wit2 eac2 coar+e brea1ing joint wit2 t2e +ource below Bon! +2all be 1ept plumb t2roug2outJ concrete an! rebar+ +2all be plumb an! true /nit+ wit2 greater t2an 03K ab+orption +2all be wet before laying -or1 re:uire! to be buil! in t2e ma+onry, inclu!ing anc2or+ well plug+ an! acce++orie+, +2all be built a+ t2e erection progre++e+ 3 Ma+onry unit+ eac2 coar+e +2all be +oli!ly be!!e! in Portlan! cement mortar &ll unit+ +2all be !amp w2en lai! unit+ +2all be +2ore! into place not lai! in a full be! of unfurrowe! mortar &ll 2orizontal an! vertical point+ +2all be completely fille! wit2 mortar w2en a+ lai! #ac2 coar+e +2all be bon!e! at corner+ an! inter+ection+ No cell+ +2all be left open in face +urface+ &ll cell+ +2oul! be fille! up wit2 mortar for e4terior wall+ /nit+ terminating again+t beam or +lab +offit+ +2all be +et tig2t wit2 mortar %o not lay crac1e! bro1en !eface! bloc1 5 Lintel+ +2all be of concrete an! +2all be reinforce! a+ +2own in t2e !rawing+ Lintel+ +2all 2ave a minimum !ept2 of A 3A an! +2all e4ten! at lea+t A 3A on eac2 +i!e of opening -O).M&N'8$P &N% $N'T&LL&T$ON 0 Pla+tering: "lean an! evenly wet +urface+ &pply +cratc2 coat wit2 +ufficient force to form goo! 1ey+ "ro++ +cratc2 upon attaining it+ initial +et 1eep !amp &pply brown coat after +cratc2 coat 2a+ +et after 36 2our+ after +cratc2 coat application Lig2tly +cratc2 brown coat 1eep moi+t for 3 !ay+ allow !rying out %o not apply fini+2 until brown coat again +ea+one! for +even !ay+ (u+t !ry before applying coat, wet brown coat again ;loat fini+2 coat to true evenly +urface, trowel in manner t2at will force +ai! particle+ !own into pla+ter+ wit2 final trowelling, le++er +urface varni+2ing, +moot2, free from roug2 area+ T2oroug2ly c2ec1 ot2er blemi+2e+ .eep fini+2 coat moi+t for at lea+t 3 !ay+ t2ereafter to protect rapi! again+t !rying until properly t2oroug2ly cure! '"&;;OL%$N7 0 Provi!e all +caffol!ing re:uire! for ma+onry wor1, inclu!ing !own on completion removal

"

I#.

CARPENTR" AN $OINER" WORKS & M&T#)$&L' 0 Luality of lumber? Lumber +2all be approve! :uality of t2e re+pective ai! of t2e variou+ part+ of t2e wor1, well +ea+one!, t2oroug2ly !ry, an! free from large, loo+e, or un+oun! 1not+, cup +2a1e+ an! ot2er imperfection+ impairing it+ +trengt2 !urability or appearance &ll fini+2ing lumber to be u+e! +2all be completely !rie! 3 Treatment of t2e lumber: a &ll conceale! lumber +2all be +praye! or bru+2e! wit2 anti?anay or anti?bo1bo1

5 6

li:ui!, woo! pre+ervation+ b 'urface to contact wit2 ma+onry an! concrete coate! wit2 concrete or e:uivalent %oor 'a+2e+: &ll !oor +a+2 +2all well be +ea+one!, 8u+2 type +emi?2allow core an! +oli! core, tanguile or apitong marine plywoo! concern+ on bat2 +i!e+ .in! of lumber: &ll une4pecte! lumber for framing +2all be apitong or any e:uivalent, all !oor an! win!ow jamb+ +2all be tanguile or &pitong any e:uivalent +2all be MD t2ic1 marine plywoo! wit2 lE 4 lE air vent +late Tool joint+ +lig2tly concave, cut off e4ce++ mortar an! wipe from face tile )oug2en interior+ of !epre++ion+ $n mortar joint+ after grout 2a+ been cleane! from +urface ;ull to line of cu+2ion tile ba+e+ or cover wit2 mortar Ma1e joint+ between vain tile, plumbing an! ot2er built in fi4ture+ wit2 colore! caul1ing

#.

ARC%ITECT&RA' FINIS%IN( SC%E &'E & ;LOO)$N7 0 $nterior flooring +2all be 03E4l3E ceramic+ tile+ fini+2e! 3 Toilet flooring +2all be vitrifie! tile fini+2e! wit2 GE4GE in +ize B -&LL$N7 0 &ll wall+ +2all be cement pla+ter wit2 +moot2 cement fini+2e! " "#$L$N7 0 &ll interior ceiling +2all be MD t2ic1 2ar!ifle4 boar! on 343 ceiling joi+t an! nailer+ % %OO)' 0 $nterior !oor+ +2all be panel !oor an! 2ollow core flu+2e! !oor u+ing marine plywoo! ven!or 3 &ll e4terior !oor+ +2all be panel !oor 5 7routing 7rout joint+ in wall tile wit2 neat tile cement imme!iately after +uitable area of tile 2a+ been +et ;oot joint+ +lig2tly concave, cut off e4ce++ mortar an! wipe from face tile )oug2en interior+ of !epre++ion+ in mortar joint+ after grout 2a+ been cleane! from +urface ;ill to line of cu+2ion tile ba+e+ or cover+ wit2 mortar Ma1e joint+ between wall tile, plumbing any ot2er built?in fi4ture wit2 colore! caul1ing $mme!iately after grout 2a+ been initial +et, give wall +urface protective coat of non corro+ive +oap # -$N%O-' 0 &ll win!ow+ a+ in!icate! in t2e plan +2all be +teel win!ow+ ca+ement an! awning type wit2 +imple 5NGE +:uare wroug2t iron grill+ 3 7la++ an! glazing: &ll win!ow+ +2all be glaze! out+i!e wit2 +teel ca+ement putty 7la++ +2all be putte! an! face putte! in neat trim line manner, wit2 +teel glazing c2ip+ /+e 0NGE t2ic1 fro+te! or clear gla++

; ;$N$'8$N7 0 Butt 2inge+: /nle++ ot2erwi+e approve! by t2e &rc2itect an! +2all be poli+2e! an! finally fini+2e! morti+e ;or all interior or any e:uivalent an! e4terior woo! !oor /+e one an! one?2alf pair+ <5 pe+ > per leaf of !oor more t2an 0 GA m 2ig2 loo+e pin butt for room !oor+ fi4e! pin butt for clo+et+ 7 LO".'#T 0 "ylin!rical loc1+?&ll interior !oor +2all be e:uippe! wit2 2ig2 gra!e 2eavy +tan!ar! !uty <a+ re:uire!> cylin!rical loc1+et+ T2e mec2ani+m +2all be 2eavy gauge, color rolle! +teel containe! in +tur!y cylin!rical 2ou+ing wit2 all part+ zinc plate! an! !i+c2romate! for ma4imum re+i+tance again+t ru+t an! corro+ion #4po+e! part+ +2all be bra++ 2eavily place! a+ manufacture! by 'c2lage, Hale or ot2er approve!Ne:uivalent 3 .eying an! .ey+? Loc1+ +2all be conveye! in +et+ +ubject to provi!e ma4imum e4pan+ion &ll +et+ +2all be gran!ma+ter 1eye! an! all entrance+ loc1+ +2all be great 1eye! per unit 8 %OO) B/MP#)' 0 -2ere woo!en !oor+ +2all +tri1e an object !uring opening, provi!e !oor bumper+ $ "&B$N#T 8$N7#' 0 "abinet 2inge+ +2all be E-a+2ingtonE type at piano 2inge+ 2eavily nic1el plate! 3 Provi!e Hale or .wi1+et !oor loc1+et of all +wing !oor+

#I.

ROOF FRA!IN( ROOFIN( AN TINS!IT%R" 0 3 5 )oof +2eat2ing +2all be "orrugate! 7 $ roofing %own+pout +2all be PV" pipe, +animol! or any e:uivalent )oof framing +2all be fabricate! +teel frame painte! wit2 two coating of re! o4i!e paint 'ize+ of +teel u+e in +teel tru++e+ a+ +2own in t2e plan

#II.

P'&!BIN( WORKS & "&B$N#T 8$N7#' 0 &ll wor1+ +2all be !one un!er t2e !irect +upervi+ion of a licen+e! plumber an! in +trict accor!ance wit2 t2i+ +pecification an! of t2e met2o!+ a+ pre+cribe! by t2e National Plumbing "o!e of t2e P2ilippine+ B $N'T&LL&T$ON 0 $n+tall plumbing fi4ture+ free an! open to affor! acce++ for cleaning 3 $n+tall plumbing fi4ture+ a+ in!icate! on !rawing furni+2ing all brac1et+, cleat+, plate+ an! anc2or+ re:uire! to +upport fi4ture+ rigi!ly in place 5 $n+tall all fi4ture+ an! acce++orie+ in location+ !irecte! in accor!ance wit2 manufacturerB+ in+truction+, minimizing pipe fitting+ 6 Protect item+ wit2 approve! mean+ to maintain perfect con!ition+ @ &ll +oil an! !rainage pipe+ +2all 2ave a minimum +lope of 3K

I G

Vertical pipe+ +2all be +ecure! +trongly by 2oo1+ to buil!ing framing Provi!e +uitable brac1et at t2e floor+ from w2ic2 t2ey +tart -2ere a vent or circuit vent pipe from any fi4ture+ or line of fi4ture+ i+ connecte! to vent line +erving ot2er fi4ture+, connection +2all be at lea+t <6> four feet, 0GA m above t2e floor in w2ic2 fi4ture+ are locate! to prevent u+e of any vent line a+ wa+te 8orizontal pipe+ +2all be +upporte! by well +ecure! +trap 2anger+ "onnection of water clo+et to wa+te pipe +2all be ma!e by mean+ of 2inge! plate+ an! a+be+to+ pac1ing wit2out u+e of rubber putty or cement Ma1e all joint+ air an! water tig2t, for jointing pipe+, t2e following +2all be u+e!: a "oncrete pipe+: Bell an! +pigot or tongue an! groove u+e yarning material an! cement mortar b 7 $ pipe+?/+e Teflon tape or w2ite lea! w2en tig2tening t2rea!e! joint+ c PV"?/+e PV" cement

" )O/78?$N 0 Provi!e correctly locate! opening of proper +ize+ w2ere re:uire! in wall+ an! floor+ for pa++ing of pipe+ 3 &ll pipe+ to be embe!!e! in concrete +2all be t2oroug2ly cleane! an! free from all ru+t, +cale an! paint 5 &ll c2ange+ in pipe +ize+ on +oil, wa+2 an! !rain line+ +2all be provi!e! wit2 re!ucing fitting+ or rece++e! re!ucer+ ;or c2ange+ in pipe +ize+ provi!e re!ucing fitting+ 6 8ig2 corro+ive nature groun! wit2in +ite +2all be ta1en into account Protective fi4ture+ +2all be in+talle! to prevent corro+ion or water pipe+ in+talle! un!ergroun! @ #4ten! piping to all fi4ture+, outlet+ an! e:uipment from gate valve in+talle! in t2e branc2 near t2e ri+er = &ll pipe+ +2all be cut accurately to mea+urement+ * wor1 into place wit2out forcing I "are +2all be ta1en a+ not to wea1en +tructural portion of t2e buil!ing #III. E'ECTRICA' WORKS 0 3 &ll wor1+ 2ereun!er +2all conform wit2 t2e rule+ an! regulation+ of t2e P2ilippine #lectrical "o!e, National Buil!ing "o!e, Local Power "ompany an! t2e MunicipalN"ity or!inance+ &ll electrical material+ to be u+e! +2all be bran! new an! +2all conform wit2 t2e P2ilippine +tan!ar! a &ll lig2ting fi4ture+ inclu!ing 2ou+ing balla+t+ lamp 2ol!er an! fluore+cent lamp+ +2all be E7 # E<7eneral #lectric> or any approve! type b &ll wire +2all be EP2elp+ %o!geE bran! or any approve! e:uivalent wit2 ma4imum +ize of 5 @ mm3 for branc2 circuit * 3 A mm3 for +witc2 leg+ c &ll bo4e+, pull bo4e+, utility bo4e+ an! junction bo4e+ +2all be PV" E&tlantaE orange bran! pla+tic type or any approve! e:uivalent ! &ll +witc2e+ an! convenience outlet+ +2all be of ENationalE bran! or any approve! e:uivalent

5 6 @ = I G

Panel boar!+N circuit brea1er+ +2all be of E-e+ting2ou+eE or any approve! e:uivalent f &ll con!uit+ +2all be of PV" of 2ig2 gra!e an! :uality +uc2 a+ &tlanta #meral! bran! &ll wiring running un!er floor, un!ergroun!, t2ru concrete +lab &ll con!uit+ +2all 2ave all nece++ary con!uit fitting coupling an! t2e li1e, to ma1e it mec2anically +trong "on!uit+ +2all not be le++ t2an 0@ !ia nominal !iameter an! w2ere +o in!icate! +ize +2own will be minimum &ll +witc2e+, convenience outlet+, panel boar!+, !i+connecting +witc2 an! ot2er +2all be flu+2 mounte! w2en locate! in area+ t2at are vi+ible to t2e general public &ir?con!ition unit+ +2all not e4cee! 5,AAA - * of any approve! type 'ervice entrance +2all be it+ corre+pon!ing value an! +ize of wire an! con!uit protection rating upon in+tallation &ll electrical wor1+ +2all be +upervi+e! by a regi+tere! profe++ional #lectrical #ngineer