prepared for:
prepared by:
TABLE OF CONTENTS
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
II.
V.
A.
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
B.
C.
D.
E.
APPENDIX A
Supporting Documentation
APPENDIX B
APPENDIX C
APPENDIX D
I. Introduction
Quadrex Associates, Inc., was retained by the Hernando County (FL), to provide professional
planning services for the development of the Benefit/Cost (B/C) documentation necessary for
establishing the feasibility of a proposed new Air Traffic Control Tower (ATCT) at the Hernando
County Airport (BKV). This information is intended for determining the potential range for federal
participation in costs associated with the annual operation of the Control Tower by the Federal
Aviation Administration (FAA) under the Contract Tower Program (CTP).
The following tasks were incorporated into the study:
1. Review FAAs current (2007) Terminal Area Forecast (TAF)
2. Develop pro-forma Benefit/Cost Analysis using FAA data
3. Review other site specific data relevant to the B/C analysis (master plan forecasts, based
aircraft, etc.)
4. Develop pro-forma alternative B/C reflecting site-specific data and other sources
The following report narrative presents the findings and recommendations of the study. The
comments and opinions expressed in this report are those exclusively of Quadrex Associates and do
not reflect the position of the Federal Aviation Administration or that of any other federal, state, or
local agency.
II. Aircraft Activity Summary
Hernando County Airport (BKV) is a general aviation airport located six miles southwest of
Brooksville, Florida. The Airport has two runways, Runway 9/27 which is 7,001 feet long and is
enhanced by a precision instrument landing system (ILS) for approaches to Runway 9 and Runway
03/21 which is 5,015 feet long . Figure A illustrates the layout of the Airport. According to a
recent aircraft census conducted by airport management, there are currently 168 aircraft based at the
Airport. Table 1 provides a breakdown of based aircraft by category. It is noted that the total
aircraft count is somewhat higher than the information on record with the FAA. The census was
conducted to provide the FAA with more current data to update the national airport database. This
new information will be used to develop an alternate scenario for the B/C calculations.
As an airport currently without an operational air traffic control tower, aircraft activity
characteristics (i.e., number of operations1, aircraft mix, etc.) at the airport are not officially counted
on a regular basis. Since this information is a fundamental component used for determining the need
and justification (benefit) for air traffic control services, a review of other data sources was
conducted. Normally, without an ATC Tower to keep contemporaneous records of aircraft activity,
the airport activity at BKV would be estimated through the preparation of a master plan or airport
layout plan update or from the FAA data developed from periodic inspections of the airport.
Page 1
Hernando County Airport
1/21/08
Figure A
EXISTING FACILITIES
Hernando County Airport
Page 2
1/21/08
Table 1
Based Aircraft Census
Hernando County Airport
Aircraft
Type
FAA TAF
A/C Data
139
77.6%
130
Multi-engine Piston
12
9.5%
12
Multi-engine Turbine
17
11.5%
Helicopter
14
1.3%
Other
0.0%
Total
185
100.0%
156
Source: FAA 2007 Terminal Area Forecast and BKV Airport Management Records
This information is also generally used as input data in the preparation of the FAAs Terminal Area Forecast
(TAF). Tthe FAAs TAF for BVK used a 2006 baseline figure of 77,483 total operations 2. Table
2 presents the breakdown of operations by type of activity as estimated by the FAA.
Table 2
Estimated Aircraft Operations (CY 2006)
Hernando County Airport
Operations
Type
Annual
Operations
Percent of Total
Operations
Itinerant
Air Carrier
Air Taxi/Charter
General Aviation
Military
0
468
34,264
779
0.0%
0.6%
44.2%
1.0%
Subtotal Itinerant
35,511
45.8%
Local
General Aviation
Military
40,804
1,168
52.7%
1.5%
Subtotal Local
41,972
54.2%
Total
77,483
100.0%
Source: FAA 2007 Terminal Area Forecast (CY 2006 for BKV)
Page 3
Hernando County Airport
1/22/08
IV.
A. General
The FAAs Air Traffic Division administers the funding for the operation of Level 1 VFR air traffic
control towers through contract agreements with qualified ATC contractors on a regional basis. This
Contract Tower program has proven to be very effective in significantly reducing the cost of
providing air traffic control services so that many locations, which would have otherwise seen their
ATC services eliminated due to FAA budget constraints, can continue to benefit from the services
of an Air Traffic Control Tower facility.
The decision process for the funding of the operation of contract tower locations is primarily
determined by a Benefit/Cost analysis. FAA Report APO 90-7, Establishment and Discontinuance
Criteria for Air Traffic Control Towers outlines the procedures for calculating Benefit/Cost (B/C)
ratios.
Costs are those direct costs associated with the operation of the Control Tower including labor and
other expenses. Benefits are measured in terms of lives and property saved by the prevention of
Page 4
Hernando County Airport
1/21/08
midair collisions and other accidents and the savings in flight time by providing controlled airspace
around the Airport. The benefit of the Control Tower must be greater than the cost (benefit/cost
ratio of greater than 1.0) order to qualify for full funding under the FAAs Contract Tower program.
The FAA also manages a separately funded Cost-Sharing program which allows airports currently
in the Contract Tower Program with B/C ratios under 1.0 to continue to participate in air traffic
control services. This cost-sharing program uses the B/C ratio to determine the pro-rated share of
FAA costs with the balance contributed by the airport sponsor.
B. Critical Values and Other FAA Assumptions
The FAA in the B/C analysis process uses various critical values that represent the generic cost
of specific items and are set by the General Accounting Office (GAO). The critical values for items
used in the B/C Analysis include:
Table 3
FAA Critical Values & Assumptions
Statistical Life................................................. $ 3,000,000
Serious Injury..................................................
580,700
Minor Medical Injury......................................
42,900
GA Travelers Time (per hour).......................
32.50
Other Travelers Time (per hour)....................
28.00
Discount Rate (for net present value)..............
7%
Source: FAA Office of Policy and Plans (Base Year 2002)
Generally, FAA policy considers new entrants into the Contract Tower Program initially using the
establishment criteria of APO 90-7 which applies the statistical means for accident risk as a
primary factor in the B/C calculations. Also, for new entrants, projected operations are discounted
by 7.5 percent to account for the number of operations that would not be handled by an ATCT
facility open for at least 12 hours daily. The establishment period for new ATC Tower facilities
entering the Contract Tower Program generally applies to the first one to two years of operation,
depending on the point the control tower enters the program since the FAA calculates the B/C
biennially. All subsequent calculations of the B/C ratio by the FAA after the initial establishment
period are conducted using the discontinuance criteria.3
For existing Contract ATC Towers in subsequent years (Years 3-15), the B/C calculation is
conducted using the discontinuance criteria which considers the upper bounds of the statistical risk
of accidents. Projected operations are not discounted in the discontinuance scenario since it is
assumed that all operations handled by ATC are counted.
It is the FAAs current policy to consider candidate new entrants into the Contract Tower Progam only if their
establishment B/C ratio equals or exceeds 1.0.
Page 5
1/21/08
While aircraft activity is associated with the benefit side of the equation, costs are represented by
the FAAs annual cost to operate the ATC as charged by the regional FAA contractor. Generally,
under the federal program, the estimated annual cost for an entry level contract control tower is
expected to range from $350,000 to $400,000 while the FAA generally uses a figure of $450,000
to estimate the annual ATC costs for new CTP applicants. For B/C calculations, the $450,000 cost
will be used to represent a conservative estimate for ATC costs for both the Base Case and Alternate
Case scenarios at BKV. Also, in both the base and alternative cases, the annual ATC cost is held
constant (as is FAA policy) throughout the 15-year period and is only adjusted for net present value.
C. Base Case Scenario Benefit/Cost Analysis
The Base Case scenario represents the projected Benefit/Cost ratio that would result from using the
FAAs current data for BKV, the current Terminal Area Forecast (Table B-1) and other standard
assumptions. In other words, this B/C would be the likely result if the FAA were asked to provide
a B/C for the Airport right now without receiving additional information. Appendix B, Table B-2
presents the summary benefit/cost calculation for the Base Case (Years 1-2 Establishment)
scenario assuming a CY 2010 startup and illustrates the cumulative and discounted life cycle costs
and benefits of the control tower over the 15-year period. The discounted cumulative cost for the
tower operation at $450,000 per year over the 15-year period is $4,385,461 while the value of the
ATC tower benefits at BKV is only $3,060,624. Dividing benefits by cost yields a ratio of 0.70.
Under this scenario, the Airport would not be eligible to participate in the Contract Tower Program
as a new entrant.
The FAA generally does not provide a discontinuance B/C for proposed new entrant locations.
However, the B/C for discontinuance for the Base Case scenario can be determined by applying the
same basic data (with no discounting of operations unlike the 92.5 percent factor discount for
establishment calculations). The discounted cumulative cost for the tower operation over the 15year period remains at $4,385,461 while the value of the ATC tower benefits increases marginally
to $5,238,439 with a resultant B/C ratio of 1.19. Table B-3 presents the summary benefit/cost
calculation for the Base Case (Years 3-15 Discontinuance) scenario. Assuming the Airport
somehow managed to enter the Contract Tower Program, costs for operating the Control Tower
would be eligible for full funding under the discontinuance criteria. In this case, the County would
not be responsible for paying a pro-rata share of the cost of operating the ATC Tower facility under
the FAAs separate cost-sharing program which is available for assisting existing ATCT facilities
to remain open with B/Cs less than 1.0. Appendix B contains the detailed calculations of the
benefits from the Alternate Case scenario.
1/22/08
the FAA covering the entire operational costs of the new ATC Tower location. For the Alternate
Case (Years 3-15 Discontinuance), Table C-3 shows the value of the ATC Tower benefits
increasing to $8,287,258 with a resultant B/C ratio of 1.89 and thus, the costs for operating the
Control Tower would be eligible for continued full funding by a comfortable margin. Appendix C
contains the detailed calculations of the benefits from the Alternate Case scenario.
E. Break-Even Scenario Benefit/Cost Analysis
While outside the scope of this analysis, another forecast of aviation activity was developed to
illustrate the approximate levels of aircraft activity that would result in a Benefit/Cost ratio equaling
1.0 under the establishment criteria and thus allow the Airport to enter into the Contract Tower
Program. Generally, a total of 90,500 annual operations extended over the 15-year period with no
growth would result in a break-even 1.0 B/C ratio. Table D-1 presents the Break-Even forecast data
showing the level operations that would have to occur in order to reach the 1.0 B/C threshold. Table
D-2 presents the detailed B/C calculations.
Page 7
Hernando County Airport
1/22/08
APPENDIX A
SUPPORTING DOCUMENTATION
BROOKSVILLE
HERNANDO COUNTY
3 CBD TO AIRPORT (NM): 06 SW
GENERAL
10 OWNERSHIP:
PU
> 11 OWNER:
HERNANDO COUNTY
> 12 ADDRESS:
16110 AVIATION LOOP DR
BROOKSVILLE, FL 34609
> 13 PHONE NR:
352-754-4061
> 14 MANAGER:
DON SILVERNELL
> 15 ADDRESS:
16110 AVIATION LOOP DR
BROOKSVILLE, FL 34609
> 16 PHONE NR:
352-754-4061
> 17 ATTENDANCE SCHEDULE:
ALL
ALL
0700-1800
4 STATE: FL
6 REGION/ADO: ASO/ORL
SERVICES
> 70 FUEL:
100LL A
> 71
> 72
> 73
> 74
RUNWAY DATA
RUNWAY IDENT:
LENGTH:
WIDTH:
SURF TYPE-COND:
SURF TREATMENT:
35 GROSS WT:
SW
36 (IN THSDS)
DW
37
DTW
38
DDTW
> 39 PCN:
LIGHTING/APCH AIDS
> 40 EDGE INTENSITY:
> 42 RWY MARK TYPE-COND:
> 43 VGSI:
44 THR CROSSING HGT:
45 VISUAL GLIDE ANGLE:
> 46 CNTRLN-TDZ:
> 47 RVR-RVV:
> 48 REIL:
> 49 APCH LIGHTS:
OBSTRUCTION DATA
50 FAR 77 CATEGORY:
> 51 DISPLACED THR:
> 52 CTLG OBSTN:
> 53 OBSTN MARKED/LGTD:
> 54 HGT ABOVE RWY END:
> 55 DIST FROM RWY END:
> 56 CNTRLN OFFSET:
57 OBSTN CLNC SLOPE:
58 CLOSE-IN OBSTN:
DECLARED DISTANCES
> 60 TAKE OFF RUN AVBL (TORA):
> 61 TAKE OFF DIST AVBL (TODA):
> 62 ACLT STOP DIST AVBL (ASDA):
> 63 LNDG DIST AVBL (LDA):
03/21
5,015
150
CONC-G
09/27
7,002
150
CONC-G
50.0
75.0
135.0
90.0
130.0
230.0
MED
NPI - G / NPI - G
/
/
/
- / - / /
/
MED
PIR - G / NPI - G
P4L / P4L
/
/
- / - / /
MALSR /
A(V) /
/
TREES /
/
44 /
2,150 /
0B /
44:1 /
N /
FACILITIES
> 80 ARPT BCN:
CG
> 81 ARPT LGT SKED:
DUSK-DAWN
> 82 UNICOM:
123.000
> 83 WIND INDICATOR:
YES-L
84 SEGMENTED CIRCLE: YES
85 CONTROL TWR:
NONE
86 FSS:
SAINT PETERSBURG
87 FSS ON ARPT:
NO
88 FSS PHONE NR:
89 TOLL FREE NR:
1-800-WX-BRIEF
18 AIRPORT USE:
PUBLIC
19 ARPT LAT:
28-28-24.9000N ESTIMATED
20 ARPT LONG:
082-27-19.5000W
21 ARPT ELEV:
76 SURVEYED
22 ACREAGE:
2498
> 23 RIGHT TRAFFIC:
NO
> 24 NON-COMM LANDING:
NO
25 NPIAS/FED AGREEMENTS:NGPRY
> 26 FAR 139 INDEX:
> 30
> 31
> 32
> 33
> 34
PRINT DATE:
01/21/2008
AFD EFF
12/20/2007
Form Approved OMB 2120-0015
A(NP)
TREES
50
1,900
0B
34:1
N
/
/
/
/
PIR /
/
/
/
/
/
/
50:1 /
N /
C
TREES
55
2,400
0B
40:1
N
/
/
/
/
100
93 HELICOPTERS:
94 GLIDERS:
95 MILITARY:
96 ULTRA-LIGHT:
5
0
0
3
OPERATIONS
100 AIR CARRIER:
102 AIR TAXI:
103 G A LOCAL:
104 G A ITNRNT:
105 MILITARY:
TOTAL:
0
300
26,200
22,000
500
49,000
OPERATIONS FOR 12
MONTHS ENDING
- / /
/
/
- / - / /
/
- / /
/
/
- / - / /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
(>) ARPT MGR PLEASE ADVISE FSS IN ITEM 86 WHEN CHANGES OCCUR TO ITEMS PRECEDED BY >
> 110 REMARKS:
A 014
A 081
ARPT ADMINISTRATOR.
MIRL RYS 03/21 & 09/27 PRESET LOW INTST DUSK-2200, TO INCR INTST AND ACTVT AFTER 2200 - CTAF. ACTVT PAPI RYS 09 & 27 - CTAF.
111 INSPECTOR:
FAA
11/07/2001
90
8
2
11/07/2001
FAA Terminal Area Forecast: National Forecast 2007 (1) Airport Operations
LOCID: BKV HERNANDO COUNTY
Year
Itn GA
Itn Mil
Local GA
Local Mil
2002
300
22,000
500
26,200
49,000
2003
300
21,500
500
25,500
47,800
2004
450
32,770
740
38,269
740
72,969
2005
461
33,843
769
40,304
1,154
76,531
2006
468
34,264
779
40,804
1,168
77,483
2007
474
34,689
500
41,310
750
77,723
2008
480
35,119
500
41,822
750
78,671
2009
486
35,554
500
42,341
750
79,631
2010
492
35,995
500
42,866
750
80,603
2011
498
36,442
500
43,397
750
81,587
2012
504
36,894
500
43,935
750
82,583
2013
510
37,351
500
44,480
750
83,591
2014
516
37,814
500
45,032
750
84,612
2015
523
38,283
500
45,590
750
85,646
2016
529
38,758
500
46,156
750
86,693
2017
536
39,238
500
46,728
750
87,752
2018
543
39,725
500
47,307
750
88,825
2019
549
40,218
500
47,894
750
89,911
2020
556
40,716
500
48,488
750
91,010
2021
563
41,221
500
49,089
750
92,123
2022
570
41,732
500
49,698
750
93,250
2023
577
42,250
500
50,314
750
94,391
2024
584
42,774
500
50,938
750
95,546
2025
591
43,304
500
51,570
750
96,715
FAA Terminal Area Forecast: National Forecast 2007 (1) Based Aircraft
LOCID: BKV HERNANDO COUNTY
Year
Single
Jet
Multi
Helicopter
Other
Total
2002
90
108
2003
90
108
2004
134
12
156
2005
90
108
2006
130
12
156
2007
130
12
156
2008
131
12
157
2009
131
12
159
2010
132
12
160
2011
132
12
161
2012
132
12
161
2013
133
12
163
2014
133
12
164
2015
134
12
165
2016
134
12
10
166
2017
134
12
10
166
2018
135
12
10
169
2019
135
12
10
169
2020
136
12
11
171
2021
136
12
11
172
2022
136
12
11
172
2023
137
12
12
174
2024
137
12
12
176
2025
138
12
13
178
APPENDIX B
BASE CASE SCENARIO
Source:
Notes:
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Forecast
Year
468
474
480
486
492
498
504
510
516
523
529
536
543
549
556
563
570
577
584
591
34,264
34,689
35,119
35,554
35,995
36,442
36,894
37,351
37,814
38,283
38,758
39,238
39,725
40,218
40,716
41,221
41,732
42,250
42,774
43,304
GA
Itinerant
Air
Carrier
779
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
Military
Itinerant
35,511
35,663
36,099
36,540
36,987
37,440
37,898
38,361
38,830
39,306
39,787
40,274
40,768
41,267
41,772
42,284
42,802
43,327
43,858
44,395
Total
Itinerant
40,804
41,310
41,822
42,341
42,866
43,397
43,935
44,480
45,032
45,590
46,156
46,728
47,307
47,894
48,488
49,089
49,698
50,314
50,938
51,570
GA
Local
TABLE B-1
CY 2007 FAA TERMINAL AREA FORECAST
Air Traffic Control Tower Benefit/Cost Analysis
Hernando County Airport
1,168
750
750
750
750
750
750
750
750
750
750
750
750
750
750
750
750
750
750
750
Military
Local
41,972
42,060
42,572
43,091
43,616
44,147
44,685
45,230
45,782
46,340
46,906
47,478
48,057
48,644
49,238
49,839
50,448
51,064
51,688
52,320
Total
Local
01/21/08
77,483
77,723
78,671
79,631
80,603
81,587
82,583
83,591
84,612
85,646
86,693
87,752
88,825
89,911
91,010
92,123
93,250
94,391
95,546
96,715
Total
Operations
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
2,422,119
136,326
139,553
142,857
146,240
149,707
153,261
156,900
160,626
164,445
168,355
172,360
176,463
180,667
184,974
189,385
540,927
33,393
33,754
34,120
34,490
34,864
35,244
35,628
36,017
36,411
36,809
37,212
37,621
38,034
38,453
38,877
2,235,010
138,726
140,207
141,543
142,926
144,453
145,837
147,269
148,845
150,325
151,900
153,379
155,002
156,576
158,200
159,822
Accident
Efficiency
Benefit (B2) Benefit (B3)
5,198,056
308,445
313,514
318,520
323,656
329,024
334,342
339,797
345,488
351,181
357,064
362,951
369,086
375,277
381,627
388,084
Total
Benefit
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
1.000
0.935
0.873
0.816
0.763
0.713
0.666
0.623
0.582
0.544
0.508
0.475
0.444
0.415
0.388
Benefit
Discount
Adjustment [1] Factor (@7%)
3,060,624
285,312
271,028
257,342
244,385
232,185
220,503
209,440
199,016
189,061
179,653
170,668
162,199
154,130
146,485
139,218
Present
Value
(NPV)
6,750,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
ATC
Cost
4,385,461
450,000
420,561
393,047
367,334
343,303
320,844
299,854
280,237
261,904
244,770
228,757
213,792
199,805
186,734
174,518
Present
Value
(NPV)
Notes
A/C Value
3,563,177
1,870,218
1,114,305
432,120
29,138,649
A/C Type
AC
AT
GA Itinerant
GA Local
Military
Occupants
0.00
4.11
2.77
2.26
4.01
Calculation Factors
Tower Count 92.5%
Calculation Basis
Establishment Criteria
11,329
01/21/08
135,944
450,000
Annual Cost Share:
ATC Cost:
3,060,624
B/C = 0.70
4,385,461
___________________________________________________________________________________________________________________________________
Benefit/Cost Ratio =
Total
Year
Period
Collision
Benefit (B1)
TABLE B-2
BASE CASE SCENARIO
ATCT Benefit Cost Analysis (Establishment)
Hernando County Airport
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
5,313,295
299,040
306,120
313,370
320,793
328,400
336,197
344,182
352,357
360,738
369,317
378,103
387,107
396,331
405,781
415,459
705,717
43,566
44,037
44,514
44,997
45,485
45,981
46,482
46,989
47,503
48,023
48,549
49,082
49,621
50,168
50,720
2,235,010
138,726
140,207
141,543
142,926
144,453
145,837
147,269
148,845
150,325
151,900
153,379
155,002
156,576
158,200
159,822
Accident
Efficiency
Benefit (B2) Benefit (B3)
8,254,022
481,332
490,364
499,427
508,716
518,338
528,015
537,933
548,191
558,566
569,240
580,031
591,191
602,528
614,149
626,001
Total
Benefit
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
1.000
0.935
0.873
0.816
0.763
0.713
0.666
0.623
0.582
0.544
0.508
0.475
0.444
0.415
0.388
Benefit
Discount
Adjustment [1] Factor (@7%)
5,238,439
481,332
458,284
436,219
415,264
395,438
376,467
358,447
341,386
325,090
309,629
294,858
280,871
267,530
254,850
242,774
Present
Value
(NPV)
6,750,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
ATC
Cost
4,385,461
450,000
420,561
393,047
367,334
343,303
320,844
299,854
280,237
261,904
244,770
228,757
213,792
199,805
186,734
174,518
Present
Value
(NPV)
Notes
A/C Value
3,563,177
1,870,218
1,114,305
432,120
29,138,649
A/C Type
AC
AT
GA Itinerant
GA Local
Military
Occupants
0.00
4.11
2.77
2.26
4.01
Calculation Factors
Tower Count 100.0%
Calculation Basis
Discontinuance Criteria
ATC Cost:
01/21/08
450,000
5,238,439
B/C = 1.19
4,385,461
___________________________________________________________________________________________________________________________________
Benefit/Cost Ratio =
Total
Year
Period
Collision
Benefit (B1)
TABLE B-3
BASE CASE SCENARIO
ATCT Benefit Cost Analysis (Discontinuance)
Hernando County Airport
APPENDIX C
ALTERNATE CASE SCENARIO
1,625
1,625
1,625
1,625
1,625
1,625
1,625
1,625
1,625
1,625
1,625
1,625
1,625
1,625
1,625
1,625
1,625
Military
Itinerant [1]
37,040
37,789
38,539
39,289
39,780
40,270
40,761
41,251
41,742
42,265
42,787
43,310
43,832
44,355
44,912
45,469
46,025
Total
Itinerant
34,937
35,679
36,422
37,164
37,647
38,130
38,614
39,097
39,580
40,095
40,610
41,126
41,641
42,156
42,705
43,254
43,804
GA
Itinerant
Source:
478
485
493
500
507
515
522
530
537
544
552
559
567
574
582
589
597
[1] Assumes 6,500 annual miltary operations (split 25% itinerant/75% local)
Air
Carrier
Notes:
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
Forecast
Year
40,496
41,353
42,211
43,068
43,629
44,190
44,751
45,312
45,873
46,471
47,068
47,666
48,263
48,861
49,498
50,135
50,771
GA
Local
TABLE C-1
MASTER PLAN FORECAST UPDATE
Air Traffic Control Tower Benefit/Cost Analysis
Hernando County Airport
4,875
4,875
4,875
4,875
4,875
4,875
4,875
4,875
4,875
4,875
4,875
4,875
4,875
4,875
4,875
4,875
4,875
Military
Local [1]
45,371
46,228
47,086
47,943
48,504
49,065
49,626
50,187
50,748
51,346
51,943
52,541
53,138
53,736
54,373
55,010
55,646
Total
Local
01/21/08
82,410
84,018
85,625
87,232
88,284
89,335
90,387
91,438
92,490
93,610
94,730
95,851
96,971
98,091
99,285
100,478
101,672
Total
Operations
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
3,899,666
224,137
228,822
233,554
238,333
243,160
248,354
253,601
258,902
264,257
269,666
275,488
281,371
287,315
293,320
299,386
932,912
58,822
59,284
59,745
60,206
60,668
61,159
61,650
62,142
62,633
63,125
63,648
64,172
64,696
65,219
65,743
3,257,164
206,138
207,715
209,146
210,723
212,155
213,729
215,400
216,927
218,599
220,126
221,892
223,563
225,330
227,001
228,720
Accident
Efficiency
Benefit (B2) Benefit (B3)
8,089,742
489,097
495,821
502,445
509,262
515,983
523,242
530,651
537,971
545,489
552,917
561,028
569,106
577,341
585,540
593,849
Total
Benefit
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
1.000
0.935
0.873
0.816
0.763
0.713
0.666
0.623
0.582
0.544
0.508
0.475
0.444
0.415
0.388
Benefit
Discount
Adjustment [1] Factor (@7%)
4,778,368
452,415
428,630
405,941
384,531
364,118
345,084
327,076
309,895
293,669
278,194
263,808
250,100
237,120
224,755
213,032
Present
Value
(NPV)
6,750,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
ATC
Cost
4,385,461
450,000
420,561
393,047
367,334
343,303
320,844
299,854
280,237
261,904
244,770
228,757
213,792
199,805
186,734
174,518
Present
Value
(NPV)
Notes
A/C Value
3,691,316
1,937,475
1,154,378
864,305
30,186,532
A/C Type
AC
AT
GA Itinerant
GA Local
Military
Occupants
0.00
4.11
2.77
2.53
4.01
Calculation Factors
Tower Count 92.5%
Calculation Basis
Establishment Criteria
ATC Cost:
01/22/08
450,000
4,778,368
B/C = 1.09
4,385,461
___________________________________________________________________________________________________________________________________
Benefit/Cost Ratio =
Total
Year
Period
Collision
Benefit (B1)
TABLE C-2
ALTERNATE CASE SCENARIO (Master Plan Forecast)
ATCT Benefit Cost Analysis (Establishment)
Hernando County Airport
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
8,541,371
490,872
501,139
511,510
521,985
532,564
543,947
555,448
567,066
578,803
590,658
603,418
616,313
629,342
642,505
655,801
1,217,116
76,742
77,344
77,946
78,548
79,149
79,791
80,432
81,073
81,714
82,355
83,038
83,721
84,404
85,088
85,771
3,257,164
206,138
207,715
209,146
210,723
212,155
213,729
215,400
216,927
218,599
220,126
221,892
223,563
225,330
227,001
228,720
Accident
Efficiency
Benefit (B2) Benefit (B3)
13,015,651
773,752
786,198
798,602
811,256
823,868
837,467
851,280
865,066
879,116
893,139
908,348
923,597
939,076
954,594
970,292
Total
Benefit
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
1.000
0.935
0.873
0.816
0.763
0.713
0.666
0.623
0.582
0.544
0.508
0.475
0.444
0.415
0.388
Benefit
Discount
Adjustment [1] Factor (@7%)
8,287,258
773,752
734,764
697,530
662,227
628,525
597,102
567,244
538,720
511,654
485,808
461,758
438,794
416,961
396,123
376,296
Present
Value
(NPV)
6,750,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
ATC
Cost
4,385,461
450,000
420,561
393,047
367,334
343,303
320,844
299,854
280,237
261,904
244,770
228,757
213,792
199,805
186,734
174,518
Present
Value
(NPV)
Notes
A/C Value
3,691,316
1,937,475
1,154,378
864,305
30,186,532
A/C Type
AC
AT
GA Itinerant
GA Local
Military
Occupants
0.00
4.11
2.77
2.53
4.01
Calculation Factors
Tower Count 100.0%
Calculation Basis
Discontinuance Criteria
ATC Cost:
01/22/08
450,000
8,287,258
B/C = 1.89
4,385,461
___________________________________________________________________________________________________________________________________
Benefit/Cost Ratio =
Total
Year
Period
Collision
Benefit (B1)
TABLE C-3
ALTERNATE CASE SCENARIO (Master Plan Forecast)
ATCT Benefit Cost Analysis (Discontinuance)
Hernando County Airport
APPENDIX D
BREAK EVEN SCENARIO
1,000
1,000
1,000
1,100
1,200
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
Military
Itinerant [1]
40,212
45,930
45,930
46,030
46,130
46,430
46,430
46,430
46,430
46,430
46,430
46,430
46,430
46,430
46,430
46,430
46,430
Total
Itinerant
Pro-forma Break Even Activity Estimate using 2006 Master Plan Baseline Data
38,800
44,500
44,500
44,500
44,500
44,500
44,500
44,500
44,500
44,500
44,500
44,500
44,500
44,500
44,500
44,500
44,500
GA
Itinerant
Source:
412
430
430
430
430
430
430
430
430
430
430
430
430
430
430
430
430
[1] Assumes 4,000 annual miltary operations (split 25% itinerant/75% local)
Air
Carrier
Notes:
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
Forecast
Year
35,520
40,050
40,050
40,050
40,050
40,050
40,050
40,050
40,050
40,050
40,050
40,050
40,050
40,050
40,050
40,050
40,050
GA
Local
TABLE D-1
BREAK EVEN ACTIVITY LEVELS
Air Traffic Control Tower Benefit/Cost Analysis
Hernando County Airport
3,000
3,000
3,000
3,200
3,400
4,000
4,000
4,000
4,000
4,000
4,000
4,000
4,000
4,000
4,000
4,000
4,000
Military
Local [1]
38,520
43,050
43,050
43,250
43,450
44,050
44,050
44,050
44,050
44,050
44,050
44,050
44,050
44,050
44,050
44,050
44,050
Total
Local
01/21/08
78,732
88,980
88,980
89,280
89,580
90,480
90,480
90,480
90,480
90,480
90,480
90,480
90,480
90,480
90,480
90,480
90,480
Total
Operations
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
3,262,860
217,524
217,524
217,524
217,524
217,524
217,524
217,524
217,524
217,524
217,524
217,524
217,524
217,524
217,524
217,524
801,510
53,434
53,434
53,434
53,434
53,434
53,434
53,434
53,434
53,434
53,434
53,434
53,434
53,434
53,434
53,434
3,219,360
214,624
214,624
214,624
214,624
214,624
214,624
214,624
214,624
214,624
214,624
214,624
214,624
214,624
214,624
214,624
Accident
Efficiency
Benefit (B2) Benefit (B3)
7,283,730
485,582
485,582
485,582
485,582
485,582
485,582
485,582
485,582
485,582
485,582
485,582
485,582
485,582
485,582
485,582
Total
Benefit
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
92.5%
1.000
0.935
0.873
0.816
0.763
0.713
0.666
0.623
0.582
0.544
0.508
0.475
0.444
0.415
0.388
Benefit
Discount
Adjustment [1] Factor (@7%)
4,377,307
449,163
419,779
392,317
366,651
342,665
320,247
299,297
279,716
261,417
244,315
228,332
213,394
199,434
186,387
174,193
Present
Value
(NPV)
6,750,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
450,000
ATC
Cost
4,385,461
450,000
420,561
393,047
367,334
343,303
320,844
299,854
280,237
261,904
244,770
228,757
213,792
199,805
186,734
174,518
Present
Value
(NPV)
Notes
A/C Value
3,450,202
1,810,921
1,078,975
709,416
28,214,769
A/C Type
AC
AT
GA Itinerant
GA Local
Military
Occupants
0.00
4.11
2.77
2.44
4.01
Calculation Factors
Tower Count 92.5%
Calculation Basis
Establishment Criteria
70
01/21/08
837
450,000
Annual Cost Share:
ATC Cost:
4,377,307
B/C = 1.00
4,385,461
___________________________________________________________________________________________________________________________________
Benefit/Cost Ratio =
Total
Year
Period
Collision
Benefit (B1)
TABLE D-2
BREAK EVEN SCENARIO
ATCT Benefit Cost Analysis (Establishment)
Hernando County Airport