Summary of Experience: Having more than two years experiences as Mechanical Engineer. The main responsibilities are doing engineering activities for Material (Solid and Liquid) Handling and Package Equipment. During my career I have involved in several overseas and local project, starting from remarkable Donggi Senoro LNG Project. I am familiar with Oil&Gas industry. Combination between my curiosity and willingness to learn helped me to grow according to the demands of my job. Languages : Indonesia (native) English

Farid Nur Sany


farid.sany@ymail.com 081-332-79-75-90

Employment History (Summary) : May 2011 Present Assignment : Overseas : August 9th 10th, 2012 August 14th, 2012 Domestic : July 29th, 2012 November 22th, 2012 December 20th, 2012 April 25th, 2013 Emergency Release System (ESR) Test of LNG Marine Loading Arm for DSLNG Project, Schwelm - Germany Factory Acceptance Test (FAT) of LNG Marine Loading Arm for DSLNG Project, Schwelm Germany Pre-Inspection Meeting of Overhead and Jib Crane for DSLNG Project, Bogor Indonesia Factory Acceptance Test of 2 Unit Jib Crane for DSLNG Project, Bogor Indonesia Factory Acceptance Test of Overhead Crane for DSLNG Project, Bogor Indonesia HAZID meeting for INPEX Masela FLNG FEED Project, JTM Consortium Office, Jakarta - Indonesia PT. JGC Indonesia, Jakarta Indonesia Mechanical Engineer

Career Highlight : 2011 ~ Present : Mechanical Engineer PT. JGC Indonesia 1. Project Status Home office Position Responsibility : Donggi Senoro LNG Project (May 2011 March 2013) : EPC Project : PT. JGC Indonesia : Engineer : Preparation of deliverables document including design specification, data sheet and technical evaluation of vendors proposal for LNG Marine Loading Arm, Overhead Crane, Maintenance Shop Equipment, and Warehouse Fit-Out. : Gassi-Touil Algeria Project (June 2011 May 2012) : EPC Project : PT. JGC Indonesia (remote basis) : Engineer : Preparation of deliverables document including design specification, data sheet and technical evaluation of vendors proposal for Maintenance Shop Equipment : FCCU RU-III Revamping Project (June 2011 December 2011) : FEED Project : PT. JGC Indonesia : Engineer : Design engineering study and preparation of deliverables documents including design specification, data sheet and technical evaluation of vendors proposal for Overhead Crane, TSS Package, and Manual Loading Arm. : Arun LNG Regasification Terminal Project (June 2011 December 2011) : EPC Estimation Project : PT. JGC Indonesia : Engineer : Preparation of budgetary price and deliverables document including design specification, data sheet and technical evaluation of vendors proposal for Loading Arm, Nitrogen Generator Package, and LNG Re-Gasification Unit.

2. Project Status Home office Position Responsibility

3. Project Status Home office Position Responsibility

4. Project Status Home office Position Responsibility

5. Project Status Home office Position Responsibility

: Pertamina Pulau Sambu Fuel Terminal (August 2012 December 2012) : EPC Estimation Project : PT. JGC Indonesia : Engineer : Preparation of budgetary price and deliverables document including design specification, data sheet and technical evaluation of vendors proposal for Reverse Osmosis Package, Loading Arm, Overhead Crane, Oily Water Separator, Mixer, and Gangway Tower. : PLN CNG Gresik Lombok (December 2012 February 2013) : EPC Estimation Project : PT. JGC Indonesia : Engineer : Preparation of budgetary price and deliverables document including design specification, data sheet and technical evaluation of vendors proposal for High Pressure Loading Arm, Nitrogen Generator Package, and Chiller Unit. : INPEX Masela FLNG Project (January 2013 Present) : FEED Project : PT. JGC Indonesia : Engineer : Design engineering study and preparation of deliverables document including design specification, data sheet and technical evaluation of vendors proposal for Loading Arm and Offshore Pedestal Crane. : Jalur Pipa Gas Arun Belawan Project (February 2013 March 2013) : EPC Estimation Project : PT. JGC Indonesia : Engineer : Design engineering study and preparation of deliverables document including design specification, data sheet and technical evaluation of vendors proposal for Hydrocarbon Pump (API 610) and Instrument Air Package.

6. Project Status Home office Position Responsibility

7. Project Status Home office Position Responsibility

8. Project Status Home office Position Responsibility

9. Project Status Home office Position Responsibility

: CPP Matindok (February 2013 March 2013) : EPC Estimation Project : PT. JGC Indonesia : Engineer : Design engineering study and preparation of deliverables document including design specification, data sheet and technical evaluation of vendors proposal for Air Compressor, Centrifugal Pump, and Blower.

Training / Course : May 2011 June 2011 December 2011 March 2012 April 2012 December 2012 Basic Mechanical Seal PT. Eagle Burgmann Indonesia Marine Loading Arm Mr. Shigeo Niizawa Basic Coating PT. Carboline Indonesia Familiarization of Basic Floating LNG (FLNG) Mr. Shigeo Niizawa How to Read Logic Diagram Mr. Heru Cahyono Shaft Alignment Training Mr. Sutrisno