Activity daily
ROADS Clearing and grass cutting Cutting and excavation to formation level Backfilling of sand layer by layer Watering and compaction of backfill layer Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Road base preparation and laying Watering and compaction of road base layer Compaction test Bituminuous Prime coat application Asphaltic base course preparation and laying Bituminuous Tact coat application Asphaltic wearing course preparation and laying EXTERNAL WORK Clearing and grass cutting Cutting and excavation to formation level Backfilling of sand layer by layer Watering and compaction of backfill layer Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Crushed black sand laying Leveling and compaction Interlock tiles laying Plain concrete bed laying for kerbstone Installation of kerbstone Concrete hunching and benching FACILITY 20A & 20B Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation
Page 1 of 44
Description
Location
Start Date
Finish Date
Activity daily
Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam
Page 2 of 44
Description
Location
Start Date
Finish Date
Activity daily
Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 11 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level
Page 3 of 44
Description
Location
Start Date
Finish Date
Activity daily
Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam
Page 4 of 44
Description
Location
Start Date
Finish Date
Activity daily
Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 6 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction
Page 5 of 44
Description
Location
Start Date
Finish Date
Activity daily
Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 2 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 13 Site Preparation
Page 6 of 44
Description
Location
Start Date
Finish Date
Activity daily
Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade
OTHERS:
Page 7 of 44
Description
Location
Start Date
Finish Date
Activity daily
Page 8 of 44
Remarks
Page 9 of 44
Remarks
Page 10 of 44
Remarks
Page 11 of 44
Remarks
Page 12 of 44
Remarks
Page 13 of 44
Remarks
Page 14 of 44
Remarks
Page 15 of 44
Remarks
Page 16 of 44
Description
Location
Start Date
Finish Date
Activity daily
ROADS Clearing and grass cutting Cutting and excavation to formation level Backfilling of sand layer by layer Watering and compaction of backfill layer Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Road base preparation and laying Watering and compaction of road base layer Compaction test Bituminuous Prime coat application Asphaltic base course preparation and laying Bituminuous Tact coat application Asphaltic wearing course preparation and laying EXTERNAL WORK Clearing and grass cutting Cutting and excavation to formation level Backfilling of sand layer by layer Watering and compaction of backfill layer Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Crushed black sand laying Leveling and compaction Interlock tiles laying Plain concrete bed laying for kerbstone Installation of kerbstone Concrete hunching and benching FACILITY 20A & 20B Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation
13-Apr-10 18-Apr-10
Page 17 of 44
Description
Location
Start Date
Finish Date
Activity daily
Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam
Page 18 of 44
Description
Location
Start Date
Finish Date
Activity daily
Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 11 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level
Page 19 of 44
Description
Location
Start Date
Finish Date
Activity daily
Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam
Page 20 of 44
Description
Location
Start Date
Finish Date
Activity daily
Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 6 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction
Page 21 of 44
Description
Location
Start Date
Finish Date
Activity daily
Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 2 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 13 Site Preparation
Page 22 of 44
Description
Location
Start Date
Finish Date
Activity daily
Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade
OTHERS:
Page 23 of 44
Description
Location
Start Date
Finish Date
Activity daily
Page 24 of 44
Remarks
Page 25 of 44
Remarks
Page 26 of 44
Remarks
Page 27 of 44
Remarks
Page 28 of 44
Remarks
Page 29 of 44
Remarks
Page 30 of 44
Remarks
Page 31 of 44
Remarks
Page 32 of 44
100.00% 23-May-10 23-May-10 100.00% 24-May-10 25-May-10 100.00% 25-May-10 28-May-10 25-May-10 25-May-10
100.00% 25-May-10 30-May-10 100.00% in progress 6-Jul-10 100.00% 25-May-10 30-May-10 100.00% 6-Jul-10 100.00% 2-Jun-10 100.00% 3-Jun-10 100.00% 3-Jun-10 100.00% 2-Jun-10 3-Jun-10 12-Jun-10 100.00% 11-Jul-10 100.00% 12-Jul-10 100.00% 12-Jul-10
25-Jul-10
25-Jul-10
3-Jul-10
100.00%
Page 33 of 44
15-Sep-10 15-Sep-10
100.00% 5-Aug-10 10-Aug-10 100.00% in progress 12-Aug-10 14-Aug-10 in progress 18-Aug-10 25-Aug-10 in progress
100.00% 100.00%
Page 34 of 44
100.00% 16-Aug-10 23-Aug-10 in progress 4-Aug-10 7-Aug-10 18-Aug-10 100.00% 100.00% 100.00% 22-Aug-10
100.00% 24-Aug-10 24-Aug-10 100.00% 100.00% 25-Aug-10 26-Aug-10 in progress 25-Aug-10 26-Aug-10 in progress
100.00%
Page 35 of 44
100.00% 31-May-10 5-Jun-10 100.00% 31-May-10 5-Jun-10 100.00% 6-Jun-10 100.00% 7-Jun-10 100.00% 8-Jun-10 100.00% 12-Jun-10 6-Jun-10 8-Jun-10 10-Jun-10 15-Jun-10 8-Jul-10
100.00% 25-Aug-10 25-Aug-10 100.00% 100.00% 8-Aug-10 in progress 26-Aug-10 in progress 100.00% 100.00% 100.00% 1-Sep-10
4-Sep-10
in progress
Page 36 of 44
31-Jul-10
5-Aug-10
19-Aug-10 100.00% 22-Aug-10 22-Aug-10 16-Aug-10 16-Aug-10 100.00% 100.00% 23-Aug-10 25-Aug-10 in progress 23-Aug-10
Page 37 of 44
Page 38 of 44
Page 39 of 44
Page 40 of 44
Page 41 of 44
100.00%
Page 42 of 44
Three coats bitumen application for column neck 3-Jun-10 Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Steel work for tie beam Shuttering for tie beam Casting concrete for tie beam Removal of shuttering for tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Anti- termite under slab on grade Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade Curing for slab on grade Super- structure Steelwork for column Formwork for column Casting concrete for column Curing of column Steel work for Roof slab & beam Shuttering for Roof slab & beam Casting concrete for Roof slab & beam Curing of roof slab & beam Steel work for Parapet Shuttering for Parapet Casting concrete for Parapet Curing of Parapet 5-Aug-10 1-Sep-10 2-Sep-10 13-Jul-10 13-Jul-10 28-Jul-10 19-Jul-10 26-Jul-10 2-Aug-10 19-Jul-10 19-Jul-10 15-Jun-10 1-Jul-10 3-Jul-10 3-Jul-10 6-Jul-10 8-Jul-10
19-Jul-10
100.00%
19-Jul-10
100.00%
13-Sep-10 13-Sep-10
Page 43 of 44
Page 44 of 44