MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

ROADS Clearing and grass cutting Cutting and excavation to formation level Backfilling of sand layer by layer Watering and compaction of backfill layer Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Road base preparation and laying Watering and compaction of road base layer Compaction test Bituminuous Prime coat application Asphaltic base course preparation and laying Bituminuous Tact coat application Asphaltic wearing course preparation and laying EXTERNAL WORK Clearing and grass cutting Cutting and excavation to formation level Backfilling of sand layer by layer Watering and compaction of backfill layer Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Crushed black sand laying Leveling and compaction Interlock tiles laying Plain concrete bed laying for kerbstone Installation of kerbstone Concrete hunching and benching FACILITY 20A & 20B Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation

Page 1 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam

Page 2 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 11 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level

Page 3 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam

Page 4 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 6 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction

Page 5 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 2 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 13 Site Preparation

Page 6 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade

OTHERS:

Page 7 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Page 8 of 44

Remarks

Page 9 of 44

Remarks

Page 10 of 44

Remarks

Page 11 of 44

Remarks

Page 12 of 44

Remarks

Page 13 of 44

Remarks

Page 14 of 44

Remarks

Page 15 of 44

Remarks

Page 16 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

ROADS Clearing and grass cutting Cutting and excavation to formation level Backfilling of sand layer by layer Watering and compaction of backfill layer Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Road base preparation and laying Watering and compaction of road base layer Compaction test Bituminuous Prime coat application Asphaltic base course preparation and laying Bituminuous Tact coat application Asphaltic wearing course preparation and laying EXTERNAL WORK Clearing and grass cutting Cutting and excavation to formation level Backfilling of sand layer by layer Watering and compaction of backfill layer Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Crushed black sand laying Leveling and compaction Interlock tiles laying Plain concrete bed laying for kerbstone Installation of kerbstone Concrete hunching and benching FACILITY 20A & 20B Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation

13-Apr-10 18-Apr-10

Page 17 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam

Page 18 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 11 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level

Page 19 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam

Page 20 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 6 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction

Page 21 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 2 Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade FACILITY 13 Site Preparation

Page 22 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Shuttering for foundation Casting concrete for foundation Removal of shuttering of foundation Three coats bitumen application for foundation Solid blockworks below tie beam Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Shuttering for tie beam Steel work for tie beam Casting concrete for tie beam Removal of shuttering of tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade

OTHERS:

Page 23 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

DAILY SITE PROGRESS


Date: Total % Accomplishment as of to date

Description

Location

Start Date

Finish Date

Activity daily

Page 24 of 44

Remarks

Page 25 of 44

Remarks

Page 26 of 44

Remarks

Page 27 of 44

Remarks

Page 28 of 44

Remarks

Page 29 of 44

Remarks

Page 30 of 44

Remarks

Page 31 of 44

Remarks

Page 32 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 1 Description Site Preparation Clearing and grass cutting Cutting and filling to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Steelworks for foundation Shuttering for foundation Concrete casting for foundation Removal of shuttering of foundation Curing of foundation Three coats bitumen application for foundation Casting of blinding concrete below solid block Solid blockworks below tie beam 28-Jul-10 7-Jul-10 7-Jul-10 13-Jul-10 14-Jul-10 14-Jul-10 29-Jul-10 12-Jul-10 12-Jul-10 13-Jul-10 14-Jul-10 18-Jul-10 1-Aug-10 24-Jun-10 30-Jun-10 1-Jul-10 1-Jul-10 28-Jun-10 30-Jun-10 1-Jul-10 30-Jun-10 30-Jun-10 100.00% 23-May-10 23-May-10 23-May-10 23-May-10 100.00% 19-May-10 100.00% 23-Jun-10 100.00% 100.00% 22-Jul-10 100.00% 23-Jun-10 100.00% 24-Jun-10 100.00% 11-Jul-10 11-Jul-10 11-Jul-10 12-Jul-10 19-Jul-10 29-Jul-10 23-May-10 23-May-10 100.00% 23-Jun-10 100.00% 100.00% 21-Jul-10 22-Jul-10 100.00% 3-Aug-10 8-Aug-10 100.00% 29-Jul-10 1-Aug-10 100.00% 1-Jul-10 5-Jul-10 100.00% 19-Jul-10 19-Jul-10 20-Jul-10 18-Jul-10 18-Jul-10 18-Jul-10 23-Jun-10 23-Jun-10 100.00% 100.00% 14-Jul-10 100.00% 14-Jul-10 23-Jun-10 100.00% 14-Jul-10 14-Jul-10 100.00% 7-Jul-10 100.00% 7-Jul-10 100.00% 7-Jul-10 100.00% 7-Jul-10 8-Jul-10 7-Jul-10 7-Jul-10 7-Jul-10 7-Jul-10 8-Jul-10 100.00% 3-Jun-10 100.00% 1-Jun-10 100.00% 1-Jun-10 100.00% 6-Jun-10 100.00% 7-Jun-10 7-Jun-10 6-Jun-10 3-Jun-10 5-Jun-10 6-Jun-10 7-Jun-10 8-Jun-10 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 20-Jun-10 21-Jun-10 9-May-10 6-Jun-10 11-May-10 20-Jun-10 100.00% 25-Apr-10 100.00% 27-Apr-10 5-May-10 27-Apr-10 5-May-10 6-May-10 100.00% 9-May-10 100.00% 14-Jun-10 100.00% 100.00% 21-Jun-10 23-Jun-10 100.00% 28-Jun-10 7-Jul-10 100.00% 22-Jun-10 sub-base ready to be check 8/7/10 23-Jun-10 100.00% 1-Jun-10 1-Jun-10 2-Jun-10 11-May-10 22-Jun-10 100.00% 100.00% 22-Jun-10 28-Jun-10 in progress 8-Jun-10 21-Jun-10 100.00% 1-May-10 11-May-10 100.00% 12-May-10 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Start Date Finish Date Total % Accom Start Date Facility 2 Finish Date Total % Accom Start Date Facility 3 Finish Date Total % Accom Start Date Facility 4A Finish Date Total % Accom Start Date Facility 4B Finish Date Total % Accom Start Date Facility 5A Finish Date Total % Accom

10-May-10 10-May-10 100.00% 11-May-10

100.00% 23-May-10 23-May-10 100.00% 24-May-10 25-May-10 100.00% 25-May-10 28-May-10 25-May-10 25-May-10

100.00% 25-May-10 30-May-10 100.00% in progress 6-Jul-10 100.00% 25-May-10 30-May-10 100.00% 6-Jul-10 100.00% 2-Jun-10 100.00% 3-Jun-10 100.00% 3-Jun-10 100.00% 2-Jun-10 3-Jun-10 12-Jun-10 100.00% 11-Jul-10 100.00% 12-Jul-10 100.00% 12-Jul-10

100.00% 100.00% 100.00% 20-Jul-10 100.00% 21-Jul-10 100.00% 21-Jul-10 100.00%

50.00% 50.00% 14-Jul-10 100.00% 18-Jul-10 in progress 21-Jul-10

100.00% 3-Jun-10 100.00% 1-Jun-10 100.00% 13-Jun-10 14-Jun-10 in progress 15-Jun-10

13-Jun-10 13-Jun-10 13-Jun-10

100.00% 100.00% 100.00% 100.00%

25-Jul-10

25-Jul-10

3-Jul-10

100.00%

Page 33 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 1 Description Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Steel work for tie beam Shuttering for tie beam Casting concrete for tie beam Removal of shuttering for tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Anti- termite under slab on grade Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade Super- structure Steel work for column Shuttering for column Casting concrete for column Curing of column Steel work for Roof slab & Beam Shuttering for Roof slab & Beam Casting concrete for Roof slab & Beam Curing of roof slab & Beam Steel work for Parapet Shuttering for Parapet Casting concrete for Parapet Curing of Parapet 2-Nov-10 02-112010 & 100.00% 3-Nov-10 3-Nov-10 100.00% 1-Sep-10 1-Sep-10 7-Sep-10 5-Sep-10 5-Sep-10 13&19/09/ 2010 100.00% 100.00% 100.00% 25-Oct-10 25-Oct-10 100.00% 10-Nov-10 10-Nov-10 100.00% 5-Oct-10 20-Oct-10 100.00% 13-Nov-10 13-Nov-10 100.00% 18-Sep-10 16-Oct-10 100.00% 2-Nov-10 2-Nov-10 100.00% 31-Aug-10 16-Oct-10 100.00% 20-Oct-10 23-Oct-10 25-Oct-10 20-Oct-10 25-Oct-10 26-Oct-11 4-Aug-10 20-Jul-10 21-Jul-10 21-Jul-10 Start Date 28-Jul-10 19-Jul-10 17-Jul-10 20-Jul-10 21-Jul-10 25-Jul-10 1-Aug-10 26-Aug-10 Finish Date Total % Accom in progress 100.00% 30-May-10 13-Jun-10 100.00% 30-May-10 13-Jun-10 100.00% 13-Jun-10 100.00% 14-Jun-10 in progress 100.00% 100.00% 29-Jun-10 100.00% 18-Jul-10 18-Jul-10 100.00% 4-Aug-10 100.00% 5-Aug-10 22-Jul-10 25-Jul-10 4-Aug-10 7-Aug-10 in progress 100.00% 100.00% 12-Oct-10 12-Oct-10 100.00% 3-Nov-10 3-Nov-10 100.00% 11-Nov-10 11-Nov-10 2-Aug-10 10-Aug-10 in progress 7-Aug-10 in progress 100.00% 17-Jul-10 100.00% 2-Aug-10 26-Aug-10 100.00% 12-Aug-10 4-Sep-10 in progress 12-Aug-10 4-Sep-10 in progress 11-Jul-10 31-Jul-10 100.00% 13-Jun-10 Start Date Facility 2 Finish Date Total % Accom 100.00% Start Date 26-Jul-10 Facility 3 Finish Date 29-Jul-10 18-Jul-10 18-Jul-10 18-Jul-10 Total % Accom 100.00% 100.00% 100.00% 100.00% 1-Aug-10 1-Aug-10 100.00% 100.00% 100.00% 27-Jul-10 25-Jul-10 27-Jul-10 Start Date Facility 4A Finish Date Total % Accom Start Date 3-Aug-10 Facility 4B Finish Date 8-Aug-10 Total % Accom 100.00% 14-Jun-10 100.00% 14-Jun-10 100.00% 23-Jun-10 Start Date Facility 5A Finish Date 5-Jul-10 23-Jun-10 23-Jun-10 23-Jun-10 Total % Accom 100.00% 100.00% 100.00% 100.00%

100.00% 13-Jul-10 100.00% 13-Jul-10 100.00% 18-Jul-10 100.00%

15-Sep-10 15-Sep-10

100.00% 5-Aug-10 10-Aug-10 100.00% in progress 12-Aug-10 14-Aug-10 in progress 18-Aug-10 25-Aug-10 in progress

100.00% 10-Aug-10 10-Aug-10 12-Aug-10 14-Aug-10

100.00% 15-Aug-10 23-Aug-10 in progress 30-Aug-10 30-Aug-10 31-Aug-10

100.00% 100.00%

Page 34 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 5B Description Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Steelworks for foundation Shuttering for foundation Concrete casting for foundation Removal of shuttering of foundation Curing of foundation Three coats bitumen application for foundation Casting of blinding concrete below solid block Solid blockworks below tie beam 7-Jul-10 17-Jul-10 14-Jun-10 14-Jun-10 27-Jun-10 27-Jun-10 27-Jun-10 27-Jun-10 8-Jun-10 7-Jun-10 6-Jun-10 8-Jun-10 9-Jun-10 10-Jun-10 8-Jun-10 7-Jun-10 8-Jun-10 8-Jun-10 10-Jun-10 16-Jun-10 100.00% 17-May-10 17-May-10 100.00% 16-May-10 17-May-10 100.00% 16-May-10 17-May-10 100.00% 17-May-10 17-May-10 100.00% 18-May-10 18-May-10 100.00% 18-May-10 22-May-10 23-May-10 23-May-10 100.00% 23-May-10 24-May-10 100.00% 23-May-10 24-May-10 100.00% 25-May-10 25-May-10 26-May-10 26-May-10 26-May-10 1-Jun-10 12-Jun-10 15-Jun-10 100.00% 8-Aug-10 100.00% 100.00% 100.00% 8-Aug-10 100.00% 9-Aug-10 100.00% 100.00% 100.00% 9-Aug-10 100.00% 9-Aug-10 14-Aug-10 14-Aug-10 100.00% 1-Aug-10 100.00% 1-Aug-10 100.00% 3-Aug-10 100.00% 4-Aug-10 3-Aug-10 5-Aug-10 100.00% 100.00% 100.00% 22-Sep-10 22-Sep-10 100.00% in progress in progress 3-Aug-10 24-Aug-10 24-Aug-10 100.00% 8-Aug-10 8-Aug-10 100.00% 28-Jul-10 100.00% 28-Jul-10 100.00% 100.00% 28-Jul-10 28-Jul-10 100.00% 5-Sep-10 5-Sep-10 10-Aug-10 in progress 28-Jul-10 28-Jul-10 100.00% 5-Sep-10 100.00% 5-Sep-10 100.00% 1-Aug-10 1-Aug-10 1-Aug-10 100.00% 1-Aug-10 3-Aug-10 5-Aug-10 2-Aug-10 1-Aug-10 1-Aug-10 2-Aug-10 5-Aug-10 7-Aug-10 100.00% 100.00% 100.00% 100.00% 100.00% in progress 5-Jun-10 1-May-10 100.00% 25-Apr-10 12-May-10 31-May-10 in progress 26-Apr-10 1-May-10 5-May-10 100.00% 11-May-10 11-May-10 27-Apr-10 30-Apr-10 2-May-10 5-May-10 100.00% 1-May-10 100.00% 22-Jun-10 100.00% 100.00% 5-Aug-10 8-Aug-10 100.00% 26-Jul-10 27-Jul-10 100.00% 29-Aug-10 1-Sep-10 in progress 28-Jul-10 31-Jul-10 100.00% 11-May-10 01/07/2010 & 26/7/10 100.00% 1-May-10 100.00% 22-Jun-10 11-May-10 100.00% 26-Apr-10 01/07/2010 12-May-10 & 20/7/10 22/07/2010- finished 19-Aug-10 100.00% 1-May-10 11-May-10 12/05/2010 26-Jul-10 & 1/7/10 100.00% 100.00% Start Date Finish Date Total % Accom Start Date Facility 6 Finish Date Total % Accom Start Date Facility 7A Finish Date Total % Accom Start Date Facility 7B Finish Date Total % Accom Start Date Facility 8 Finish Date Total % Accom Start Date Facility 9A Finish Date Total % Accom

100.00% 15-Aug-10 15-Aug-10 100.00% 16-Aug-10 16-Aug-10

100.00% 16-Aug-10 23-Aug-10 in progress 4-Aug-10 7-Aug-10 18-Aug-10 100.00% 100.00% 100.00% 22-Aug-10

100.00% 24-Aug-10 24-Aug-10 100.00% 100.00% 25-Aug-10 26-Aug-10 in progress 25-Aug-10 26-Aug-10 in progress

17-May-10 17-May-10 90.00% 14-Jun-10 23-Jun-10

100.00%

Page 35 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 5B Description Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Steel work for tie beam Shuttering for tie beam Casting concrete for tie beam Removal of shuttering for tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Anti- termite under slab on grade Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade Curing for slab on grade Super- structure Steel work for column Shuttering for column Casting concrete for column Curing of column Steel work for Roof slab & Beam Shuttering for Roof slab & Beam Casting concrete for Roof slab & Beam Curing of roof slab & Beam Steel work for Parapet Shuttering for Parapet Casting concrete for Parapet Curing of Parapet 6-Oct-10 6-Oct-10 100.0% 31-Aug-10 4-Sep-10 20-Sep-10 20-Sep-10 in progress 100.0% 14-Oct-10 25-Oct-10 25-Oct-10 25 & 30-102010 100.00% 100.00% 28-Aug-10 100.00% 16-Aug-10 16-Aug-10 100.00% 17-Aug-10 23-Aug-10 in progress 2-Oct-10 9-Oct-10 100.00% 28-Jul-10 11-Aug-10 2-Oct-10 31-Jul-10 50.00% 11-Aug-10 11-Aug-10 100.00% 100.00% 100.00% 100.00% 18-Nov-10 18-Nov-10 100.00% 2-Aug-10 7-Aug-10 100.00% 8-Jul-10 100.00% 8-Jul-10 100.00% 13-Jul-10 100.00% 14-Jul-10 15-Jul-10 12-Jul-10 12-Jul-10 13-Jul-10 15-Jul-10 19-Jul-10 100.00% 100.00% 100.00% 4-Nov-10 100.00% in progress 4-Nov-10 100.00% 1-Nov-10 1-Nov-10 100.00% 18-Jul-10 29-Jun-10 29-Jun-10 4-Jul-10 5-Jul-10 5-Jul-10 3-Jul-10 3-Jul-10 4-Jul-10 5-Jul-10 8-Jul-10 20-Jul-10 Start Date Finish Date Total % Accom Start Date 17-Jun-10 Facility 6 Finish Date 22-Jun-10 Total % Accom 100.00% 100.00% 24-Aug-10 25-Aug-10 100.00% 24-Aug-10 25-Aug-10 Start Date Facility 7A Finish Date Total % Accom Start Date 23-Aug-10 100.00% 5-Aug-10 7-Aug-10 Facility 7B Finish Date Total % Accom in progress 100.00% 100.00% 8-Aug-10 100.00% 29-Sep-10 29-Sep-10 1-Sep-10 4-Sep-10 31-Aug-10 4-Sep-10 100.00% 5-Sep-10 7-Sep-10 100.00% Start Date Facility 8 Finish Date Total % Accom Start Date Facility 9A Finish Date Total % Accom

100.00% 31-May-10 5-Jun-10 100.00% 31-May-10 5-Jun-10 100.00% 6-Jun-10 100.00% 7-Jun-10 100.00% 8-Jun-10 100.00% 12-Jun-10 6-Jun-10 8-Jun-10 10-Jun-10 15-Jun-10 8-Jul-10

100.00% 25-Aug-10 25-Aug-10 100.00% 100.00% 8-Aug-10 in progress 26-Aug-10 in progress 100.00% 100.00% 100.00% 1-Sep-10

26-Aug-10 in progress 28-Jun-10

4-Sep-10

in progress

12-Aug-10 17-Aug-10 18-Aug-10 9-Oct-10 19-Aug-10 24-Aug-10

28-Aug-10 100.00% 29-Aug-10 29-Aug-10 100.00% 100.00% 31-Aug-10 4-Sep-10 in progress

Page 36 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 9B Description Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test of formation level Sub-base preparation and laying Watering and compaction of sub-base Compaction test of sub-base Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Steelworks for foundation Shuttering for foundation Concrete casting for foundation Removal of shuttering of foundation Curing of foundation Three coats bitumen application for foundation Casting of blinding concrete below solid block Solid blockworks below tie beam 1-Sep-00 5-Sep-10 6-Oct-10 10-Oct-10 100.00% 8-Nov-10 9-Nov-10 100.00% 27-Oct-10 28&30-102010 26-Aug-10 in progress 21-Aug-10 28-Aug-10 21-Aug-10 28-Aug-10 100.00% 29-Aug-10 29-Aug-10 14-Aug-10 15-Aug-10 15-Aug-10 15-Aug-10 15-Aug-10 100.00% 100.00% 100.00% 100.00% 13-Oct-10 26-Oct-10 19-Aug-10 21-Aug-10 22-Aug-10 22-Aug-10 100.00% 16-Aug-10 16-Aug-10 16-Aug-10 16-Aug-10 100.00% 17-May-10 17-May-10 100.00% 16-May-10 17-May-10 100.00% 16-May-10 17-May-10 100.00% 17-May-10 17-May-10 18-May-10 18-May-10 18-May-10 22-May-10 23-May-10 23-May-10 100.00% 23-May-10 24-May-10 100.00% 23-May-10 24-May-10 100.00% 25-May-10 25-May-10 26-May-10 26-May-10 in progress 26-May-10 1-Jun-10 12-Jun-10 15-Jun-10 17-May-10 17-May-10 14-Jun-10 23-Jun-10 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 28-Jul-10 31-Jul-10 8-Aug-10 100.00% in progress 1-May-10 11-May-10 100.00% 1-May-10 12/05/2010 26-Jul-10 100.00% 12-May-10 & 1/7/10 5-Aug-10 in progress 23-Aug-10 11-May-10 100.00% 03/05/2010 100.00% & 12/8/104-Sep-10 in progress 100.00% 25-Apr-10 100.00% 26-Apr-10 1-May-10 5-May-10 11-May-10 27-Apr-10 30-Apr-10 2-May-10 5-May-10 100.00% 100.00% 100.00% 100.00% Start Date Finish Date Total % Accom Start Date Facility 9C Finish Date Total % Accom Start Date Facility 9D Finish Date Total % Accom Start Date Facility 10 Finish Date Total % Accom Start Date Facility 11 Finish Date Total % Accom

31-Jul-10

5-Aug-10

19-Aug-10 100.00% 22-Aug-10 22-Aug-10 16-Aug-10 16-Aug-10 100.00% 100.00% 23-Aug-10 25-Aug-10 in progress 23-Aug-10

Page 37 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 9B Description Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Steel work for tie beam Shuttering for tie beam Casting concrete for tie beam Removal of shuttering for tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade Super- structure Steel work for column Shuttering for column Casting concrete for column Curing of column Steel work for Roof slab & Beam Shuttering for Roof slab & Beam Casting concrete for Roof slab & Beam Curing of roof slab & Beam Steel work for Parapet Shuttering for Parapet Casting concrete for Parapet Curing of Parapet 23-Oct-10 23-Oct-10 100.00% 28-Sep-10 28-Sep-10 100.00% 13-Sep-10 13-Sep-10 100.00% 7-Sep-10 7-Sep-10 100.00% 5-Sep-10 5-Sep-10 100.00% 3-Aug-10 8-Aug-10 in progress 15-Jun-10 19-Jul-10 in progress 6-Jul-10 6-Jul-10 11-Jul-10 11-Jul-10 11-Jul-10 11-Jul-10 100.00% 100.00% 100.00% 18-Oct-10 22-Oct-10 22-Oct-10 26-Oct-10 100.00% 21-Oct-10 100.00% 14-Nov-10 22-Nov-10 100.00% 9-Nov-10 11-Nov-10 100.00% 19-Sep-10 19-Sep-10 Start Date Finish Date Total % Accom Start Date Facility 9C Finish Date Total % Accom Start Date Facility 9D Finish Date Total % Accom Start Date Facility 10 Finish Date Total % Accom Start Date 17-Jun-10 Facility 11 Finish Date 22-Jun-10 5-Jun-10 31-May-10 5-Jun-10 100.00% 6-Jun-10 7-Jun-10 8-Jun-10 12-Jun-10 28-Jun-10 6-Jun-10 8-Jun-10 10-Jun-10 15-Jun-10 5-Jul-10 Total % Accom 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Page 38 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 12A Description Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Steelworks for foundation Shuttering for foundation Concrete casting for foundation Removal of shuttering of foundation Curing of foundation Three coats bitumen application for foundation Casting of blinding concrete below solid block Solid blockworks below tie beam 19-Jul-10 100.00% 100.00% 3-Jul-10 12-Jul-10 100.00% 22-Jun-10 23-Jun-10 100.00% 20-Jun-10 20-Jun-10 5-Jul-10 4-Jul-10 4-Jul-10 5-Jul-10 100.00% 16-Jun-10 100.00% 16-Jun-10 100.00% 29-Jun-10 23-Jun-10 23-Jun-10 29-Jun-10 100.00% 10-Jun-10 100.00% 10-Jun-10 100.00% 21-Jun-10 19-Jun-10 19-Jun-10 21-Jun-10 100.00% 100.00% 100.00% 1-Nov-10 1-Nov-10 100.00% 1-Nov-10 1-Nov-10 20-Jun-10 23-Jun-10 100.00% 20-Jun-10 23-Jun-10 100.00% 14-Jun-10 16-Jun-10 100.00% 15-Jun-10 15-Jun-10 15-Jun-10 15-Jun-10 15-Jun-10 15-Jun-10 15-Jun-10 15-Jun-10 100.00% 14-Jun-10 100.00% 100.00% 12-Jun-10 100.00% 14-Jun-10 14-Jun-10 14-Jun-10 100.00% 7-Jun-10 100.00% 9-Jun-10 8-Jun-10 9-Jun-10 100.00% 100.00% 23-Oct-10 23-Oct-10 14-Jun-10 100.00% 25-Sep-10 25-Sep-10 25-Sep-10 25-Sep-10 100.00% 25-Sep-10 25-Sep-10 15-May-10 15-May-10 100.00% 15-May-10 15-May-10 100.00% 14-May-10 15-May-10 100.00% 15-May-10 15-May-10 16-May-10 16-May-10 16-May-10 17-May-10 17-May-10 17-May-10 17-May-10 23-May-10 17-May-10 23-May-10 100.00% 23-May-10 23-May-10 25-May-10 25-May-10 25-May-10 28-May-10 3-Jun-10 10-Jun-10 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 14-Jun-10 100.00% 9-Jun-10 13-Jun-10 100.00% 31-May-10 1-Jun-10 1st layer 50.00% finish 9-May-10 7-Jun-10 11-May-10 100.00% 9-May-10 11-May-10 8-Jun-10 25-Apr-10 100.00% 26-Apr-10 27-Apr-10 30-May-10 31-May-10 100.00% 100.00% 100.00% 17-Apr-10 11-Aug-10 28-Aug-10 in progress 19-Apr-10 24-Apr-10 29-Apr-10 20-Apr-10 23-Apr-10 26-Apr-10 29-Apr-10 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Start Date Finish Date Total % Accom Start Date Facility 12B Finish Date Total % Accom Start Date Facility 13 Finish Date Total % Accom Start Date Facility 14 Finish Date Total % Accom Start Date Facility 17 Finish Date Total % Accom Start Date Facility 20A Finish Date Total % Accom

11-May-10 13-May-10 13-May-10 15-May-10

15-May-10 15-May-10 3-Jun-10 10-Jun-10

Page 39 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 12A Description Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Three coats bitumen application for column neck Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Steel work for tie beam Shuttering for tie beam Casting concrete for tie beam Removal of shuttering for tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Anti- termite under slab on grade Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade Curing for slab on grade Super- structure Steel work for column ( Shuttering for column Casting concrete for column Curing of column Steel work for Roof slab & beam Shuttering for Roof slab & beam Casting concrete for Roof slab & beam Curing of roof slab & beam Steel work for Parapet Shuttering for Parapet Casting concrete for Parapet Curing of Parapet 15-Aug-10 28-Aug-10 29-Aug-10 29-Aug-10 31-Aug-10 4-Sep-10 100.0% 100.0% in progress 11-Aug-10 11-Aug-10 100.0% 17-Aug-10 19-Aug-10 in progress 28-Oct-10 28-Oct-10 100.00% 24-Oct-10 24-Oct-10 100.00% 11-Oct-10 20-Oct-10 30.00% 12-Jul-10 12-Jul-10 100.00% 7-Nov-10 7-Nov-10 100.00% 18-Nov-10 22-Nov-10 100.00% 12-Oct-10 12-Oct-10 100.00% 21-Jul-10 25-Jul-10 25-Jul-10 25-Jul-10 100.00% 18-Oct-10 18-Oct-10 14-Oct-10 14-Oct-10 100.00% 14-Oct-10 14-Oct-10 14-Oct-10 14-Oct-10 100.00% 22-Sep-10 22-Sep-10 100.00% 22-Sep-10 22-Sep-10 100.00% 22-Sep-10 29-Sep-10 100.00% 100.00% 100.00% 19-Jul-10 19-Jul-10 100.00% 19-Jul-10 19-Jul-10 100.00% 15-Sep-10 15-Sep-10 100.00% 5-Sep-10 2-Aug-10 11-Jul-10 12-Jul-10 15-Jul-10 20-Jul-10 24-Aug-10 100.00% 100.00% 14-Aug-10 in progress 14-Aug-10 18-Aug-10 18-Aug-10 26-Aug-10 5-Sep-10 5-Sep-10 19-Sep-10 100.00% 100.00% 100.00% 100.00% 100.00% 11-Jul-10 11-Jul-10 11-Jul-10 100.00% 4-Jul-10 100.00% 4-Jul-10 100.00% 6-Jul-10 8-Jul-10 10-Jul-10 5-Jul-10 5-Jul-10 6-Jul-10 8-Jul-10 100.00% 18-Jun-10 100.00% 18-Jun-10 100.00% 28-Jun-10 100.00% in progress 28-Jun-10 28-Jun-10 28-Jun-10 100.00% 100.00% 100.00% 11-Nov-10 11-Nov-10 100.00% Start Date Finish Date Total % Accom Start Date Facility 12B Finish Date Total % Accom Start Date Facility 13 Finish Date Total % Accom Start Date Facility 14 Finish Date Total % Accom Start Date Facility 17 Finish Date Total % Accom Start Date 23-Jun-10 20-May-10 30-May-10 22-May-10 30-May-10 30-May-10 30-May-10 31-May-10 31-May-10 1-Jun-10 3-Jun-10 15-Jun-10 1-Jul-10 3-Jul-10 3-Jul-10 4-Jul-10 5-Jul-10 5-Jul-10 8-Jul-10 3-Jun-10 10-Jun-10 29-Jun-10 1-Jul-10 4-Jul-10 4-Jul-10 4-Jul-10 5-Jul-10 Facility 20A Finish Date Total % Accom in progress 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% in progress in progress

100.00% 11-Aug-10 14-Aug-10 in progress

Page 40 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 12A Description Start Date Finish Date Total % Accom Start Date Facility 12B Finish Date Total % Accom Start Date Facility 13 Finish Date Total % Accom Start Date Facility 14 Finish Date Total % Accom Start Date Facility 17 Finish Date Total % Accom Start Date Facility 20A Finish Date Total % Accom

Page 41 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 20B Description Site Preparation Clearing and grass cutting Cutting and excavation to formation level Watering and compaction Compaction test Sub-base preparation and laying Watering and compaction of sub-base Compaction test Sub- structure Spraying of anti termite Laying of polythene sheet 1000 gauge Shuttering for blinding concrete for foundation Casting of blinding concrete for foundation Removal of shuttering of blinding concrete Curing of blinding concrete Laying of polythene sheet 1000 gauge Steelworks for foundation Shuttering for foundation Concrete casting for foundation Removal of shuttering of foundation Curing of foundation Three coats bitumen application for foundation Casting of blinding concrete below solid block Solid blockworks below tie beam 15-May-10 15-May-10 15-May-10 15-May-10 14-May-10 15-May-10 15-May-10 15-May-10 16-May-10 16-May-10 16-May-10 17-May-10 17-May-10 17-May-10 17-May-10 23-May-10 17-May-10 23-May-10 23-May-10 23-May-10 25-May-10 25-May-10 25-May-10 28-May-10 3-Jun-10 10-Jun-10 100.00% 100.00% 100.00% 100.00% 25-Sep-10 25-Sep-10 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 18-Oct-10 100.00% 100.00% 100.00% 100.00% 100.00% 29-Jul-10 100.00% 18-Oct-10 100.00% 18-Jul-10 19-Jul-10 19-Jul-10 18-Jul-10 17-Jul-10 18-Jul-10 19-Jul-10 25-Jul-10 31-Jul-10 in progress 100.00% 100.00% 100.00% in progress 100.00% 100.00% 14-Jul-10 14-Jul-10 100.00% 14-Jul-10 14-Jul-10 100.00% 17-Apr-10 19-Apr-10 24-Apr-10 29-Apr-10 20-Apr-10 23-Apr-10 26-Apr-10 29-Apr-10 100.00% 100.00% 11-Aug-10 26-Aug-10 in progress 100.00% 100.00% 100.00% 100.00% 16-Jun-10 28/6/1030/06/2010 Start Date Finish Date Total % Accom Start Date Facility 20C Finish Date Total % Accom Start Date Facility 21 Finish Date Total % Accom

11-May-10 13-May-10 13-May-10 15-May-10

100.00%

15-May-10 15-May-10 3-Jun-10 14-Jun-10

Page 42 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 20B Description Three coats bitumen application for solid blockworks Steelworks for column neck Shuttering for column neck Concrete casting for column neck Removal of shuttering of column neck Curing of neck column neck Start Date 23-Jun-10 20-May-10 30-May-10 22-May-10 30-May-10 30-May-10 30-May-10 31-May-10 31-May-10 1-Jun-10 3-Jun-10 10-Jun-10 29-Jun-10 1-Jul-10 5-Jul-10 5-Jul-10 6-Jul-10 8-Jul-10 Finish Date Total % Accom in progress 100.00% 100.00% 100.00% 1-Nov-10 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% in progress 50.00% 1-Nov-10 100.00% 26-Jul-10 25-Jul-10 26-Jul-10 100.00% 100.00% Start Date Facility 20C Finish Date Total % Accom Start Date Facility 21 Finish Date 31-Jul-10 Total % Accom 100.00%

Three coats bitumen application for column neck 3-Jun-10 Backfilling up to tie beam bottom level Blinding concrete below internal tie beam Steel work for tie beam Shuttering for tie beam Casting concrete for tie beam Removal of shuttering for tie beam Curing of tie beam Three coats bitumen application for tie beam Backfilling, watering and compaction Anti- termite under slab on grade Laying of polythene sheet 1000 gauge Casting of blinding concrete for slab on grade Laying of polythene sheet 1000 gauge Steel work for slab on grade Casting concrete for slab on grade Curing for slab on grade Super- structure Steelwork for column Formwork for column Casting concrete for column Curing of column Steel work for Roof slab & beam Shuttering for Roof slab & beam Casting concrete for Roof slab & beam Curing of roof slab & beam Steel work for Parapet Shuttering for Parapet Casting concrete for Parapet Curing of Parapet 5-Aug-10 1-Sep-10 2-Sep-10 13-Jul-10 13-Jul-10 28-Jul-10 19-Jul-10 26-Jul-10 2-Aug-10 19-Jul-10 19-Jul-10 15-Jun-10 1-Jul-10 3-Jul-10 3-Jul-10 6-Jul-10 8-Jul-10

19-Jul-10

100.00%

19-Jul-10

100.00%

25-Jul-10 26-Jul-10 3-Aug-10

100.00% 100.00% in progress

16-Jul-10 16-Jul-10 28-Jul-10 3-Aug-10

100.00% 100.00% 100.00% 100.00% 10-Nov-10 10-Nov-10 100.00%

17-Aug-10 1-Sep-10 5-Sep-10 5-Sep-10 5-Sep-10

100.00% 100.00% in progress in progress in progress 100.0%

13-Sep-10 13-Sep-10

Page 43 of 44

MALIHA - DIRECTORATE OF MILITARY WORKS GHQ - MILTARY CAMP

OVERALL PROGRESS REPORT


Facility 20B Description Start Date Finish Date Total % Accom Start Date Facility 20C Finish Date Total % Accom Start Date Facility 21 Finish Date Total % Accom