QUOTATION FOR CONSTRUCTION WORK
PIECE WORK RATE 1 2. 3. 4. Earth Work for Excavation R.R.Stone Work R.R dressing Stone work R.R Dry Stone work Cft Cft Cft Cft 12.00 22.00 38.00 28.00

BRICKS MASONRY 1 2. 3. 4. 5. 6. 7. 8. 9. 9 Bricks Wall Masonry 4 Bricks Wall Masonry Fly Ash Bricks Masonry for 9 Fly Ash Bricks Masonry for 4 Fire Bricks Masonry for 9 Fire Bricks masonry for 4 wall Hollow Block Masonry work for 4 Stone Hollow block masonry work for 6 stone Hollow block masonry work for 9 stone Cft Sft Sft Sft Cft Sft Sft Sft Sft 26.00 17.00 28.00 18.00 40.00 30.00 15.00 20.00 28.00

PLASTERING

1 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21.

Ceiling Plastering Bricks Wall Plastering Stone wall plastering Old mud wall bricks plastering Beam coloumn bricks pillar plastering Loft plastering Ordinary flooring plastering Flooring (water proof) plastering (milk) Flooring (Red finish plastering) P.C.C for flooring concrete (1 jell : 4 thickness) 1:2:4 R.C.C Roof slab concrete 1:2:4 R.C.C. concrete for plinth footing lintel and column box concrete 1:2:4 laft concrete for 2 thickness and cooking laft concrete Door and window frame fixing Ventilator frame fixing Square border round border groove border sunside band plastering Water beeding plaster Tiles work / wall tiles Flooring tiles Slanting roof tiles Flooring skirting border

Sft Sft Sft Sft Sft Sft Sft Sft Sft Sft Cft Cft Sft 1 No 1 No Sft Rft Sft Sft Sft Rft

13.00 12.00 15.00 16.00 16.00 15.00 11.00 15.00 16.00 13.00 28.00 38.00 14.00 300.00 200.00 22.00 22.00 20.00 19.00 35.00 15.00

FORM WORK 1. 2. 3. 4. 5. Slab centering work Coloum box and plinth and lintel laf centering work R.C.C Wall centering Steel box coloumn centering Without wall hold the beam bottom of slab form work Sft Sft Sft Sft Sft 20.00 23.00 22.00 35.00 28.00

BAR BINDING 1. 2. 3. 4. 5. 6. 7. Note 1. Scaffolding work shifting work water currying building marking charges will claim. 2. Door and window open one side only deducts other side will take measurement. 3. Frame of the work is done on the basis of the rate quoted in this quotation only for 6 months. Barbinding for both way slab Barbinding for single way slabs Barbinding coloumn lintel laft beam plinth R.C.C. wall Bar binding Ruff cost plastering For mesh mortar applying work Stair case flight concrete Sft Sft Sft Sft Sft Sft Cft 10.00 8.00 8.00 6.00 10.00 15.00 40.00