Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SH ED D I NG
INTRODUCTION
Load shedding is a process in which a suitable amount load is thrown off in order to maintain system stability during over loaded condition Generation- load unbalance problems Load shedding in industrial units
Slow response time Incorrect or excessive load shedding Analysis knowledge is lost
Functions of blocks
Knowledgebase-possess s/m dynamic behavior Advanced Monitoring Network Models Trigger List Load Shed Optimizer- computes optimal load shedding tables corresponding to system changes. Distributed Controls -utilize PLCs to rapidly execute the load shedding
W i th th e a rch i te ctu re d e scri b e d a b o ve , a n I LS sch e m e p ro vi d e s th e fo l l ow i n g b e n e fi ts: Ti m e -va ri ant l o a d sh e d d i n g ta b l e s, w h i ch re fl e ct tru e sta tu s, a n d l oadi n g co n d i ti o n s fo r th e sh e d d a b l e l o a d s. O p ti m a lco m b i n a ti o n o f sh e d d a b l e l o a d s to m a xi m i ze l o a d p re se rva ti on. Fa st re sp o n se to d i stu rb a n ce tri g g e rs ( l e ss th a n 100 m s i n m o st ca se s).
O ne l i ne di a g ra m o f o i lre fi n e ry
The i n te rn a l e l e ctri ca ln e tw o rk su p p l i e s a to ta l l oad of about 45 M W , and i s co n sti tu te d b y th e fo l l ow i ng: S u b sta ti on i n te rco n n e cti n g th e i n te rn a l el e ctri ca l syste m to th e p o w e r g ri d b y tw o , th re e -w i ndi ng tra n sfo rm e rs 3 4 . 5 / 1 3 . 8 kV ra te d a t 2 0 M V A , su p p l yi n g th re e m a i n sw i tch b o a rd s. I n te rn a l d i stri b u ti o n syste m o p e ra ti ng at 60 h e rtz o rg a n i ze d i n to m a i n di stri b u ti o n sw i tch b o a rd s, ra te d a t 1 3 . 8 kV a n d 4 . 1 6 kV , w h i ch su p p l i es l a rg e M V m o to rs a n d / o r d i stri b u ti o n fe e d e rs a s w el l a s se ve ra l l o w vo l ta g e d i stri b u ti on sw i tch b o a rd s. To ta l g e n e ra ti o n o f 1 5 M W o b ta i n e d fro m o n e g e n e ra to r ( G e n se t C ). The pl ant i s n o rm a l l y i m p o rti n g 2 3 M W fro m th e
H a rd w a re co n fi g u ra ti o n o f P LC b a se d S / m
TABLE I SHEDDABLE LOAD PRIORITY LIST Load Shed Priority Load ID MW Shed 1 Aux-B (Pump) 1.20 MCC24AB (30% Load) 2.55 Aux A (Pump) 2.00 MCC24AB (30% Load) 2.55 Desalter#1 4.25 2 Distillation Unit #1 3.40 Distillation Unit #3 2.55 Desalter#2 4.25 3 MCC24AB (40% Load) 4.25 Distillation Unit #5 2.55 Total Load Shed 29.55
Frequency response
2 Unit #1 #3 3
MW Shed Aux-B (Pump) 1.20 MCC24AB (LV Motors) 1 2.55 Aux A (Pump) 2.00 MCC24AB (LV Motors) 2.55 Desalter#1 4.25 Distillation 3.40 Distillation Unit 2.55 Desalter#2
Load ID
conclusion
ILS is better than any of the conventional load shedding scheme ILS is essential for indusrial application