Allows professionals to explore a projects key physical and functional characteristics digitally before its built.
OWNERS
Manpower Development
STRUCTURAL ENGINEERS
300 to 500% ROI 82% reported productivity improvement 79% reported fewer VOs and onsite
problems
IMPROVEMENT IN PRODUCTIVITY
Engineers Australia Queensland Division Task Force 2005 report
estimates that 60-90% of all variations are due to poor project design documentation BIM is one way of significantly improving design and documentation quality
IMPROVEMENT IN PRODUCTIVITY
Stanford University Centre for Integrated Facility Engineering (CIFE) figures based on 32 major projects using BIM:
Up to 40% elimination of unbudgeted change orders Cost estimation accuracy within 3% Up to 80% reduction in the time taken to generate a cost estimate Saving of 10% of the contract value through clash detections Up to 7% reduction in project time, and Return on investment when using a 3D model of 5-10 times
IMPROVEMENT IN PRODUCTIVITY
University of Colorado-Denver Health Science Centre
By Mortenson Construction (US) Project Size: 50,160 m2 Total Project Cost: $200M (162M) Project Duration: 32-months Direct Comparison of Similar Buildings 1. Research Facility R1 used Traditional Construction Management 2. Research Facility R2 used BIM/IPD -780 (37%) fewer RFIs = $585,000 savings in RFI Administration - 6 Weeks Reduction in Programme = $900,000 saving in Prelims - 50% reduction in MEP labour & scheduling - 0% rework to concrete structure - Reduction in Variation Claims from $4m (R1) to <$20,000 (R2) - Total Cost of BIM/IPD (Hardware, Software, Labour) = $315,400
We shape a safe, high quality, sustainable and friendly built environment.
$1,169,600
Breakdown for heavy & medium users in Singapore, Architecture 28% Engineering 7% Construction 4%
3.5 years
We shape a safe, high quality, sustainable and friendly built environment.
TARGET
Challenges
Strategies
Removing impediments
Challenges
Strategies
Removing impediments
U.S. Army Corp of Engineers 2008 Mandatory BIM for all projects
UK 2011 Announced that BIM will become key part of the procurement of future public buildings
Korea 2012 Public Procurement Service will fully adopt IFC-based open BIM
Singapore BIM Submission for Regulatory Approval BIM as part of public sector building project procurement
Work with key agencies to prepare consultants and contractors who undertake the public sector projects to be BIM ready
STATUS UPDATE
25 JANUARY 2010
APRIL 2011
Pilot Exercise:
BIM EE-SUBMISSION
No of Submitted BIM Projects No. of BIM e-Submissions Project Types 70 300 Bungalow, Terrace House, Shophouse, Condominium, Flat, Clubhouse, Commercial, Community Centre, Warehouse, Hostel, Church, School, MRT Station, non-building Size of Development (GFA) 15 sq m 47490 sq m
Challenges
Strategies
Removing impediments
Awards Competitions
Roadshows
Seminars/Workshops
BIM Website
Challenges
Strategies
Removing impediments
REMOVING IMPEDIMENTS
Architecture
Revit Architecture
Structure
IFC
Structure
ArchiCAD
translator
Architecture
MEP
MEP MEP MEP
IFC
*All images courtesy of Structural Consultants Inc. and Davis Partnership Architects
We shape a safe, high quality, sustainable and friendly built environment.
IFC
IFC
We shape a safe, high quality, sustainable and friendly built environment.
STRUCTURE: Tekla
Design Objects Library Design objects e.g. door - graphical representation - parameterization - property set
Challenges
Strategies
Removing impediments
Students
Existing Draftspersons
Challenges
Strategies
Removing impediments
Help defray cost of software, hardware, training & consultancy From 1st June 10 to 1st January 11, $870,000 of fund has been committed