Sei sulla pagina 1di 7

DATA SHEET 1

S.NO QTY Uom


DESCRIPTION
RATE
PER
1 Foundation base concrete PCC1:5:10 using 40 mm metal -Rate for 100cft
90.00 cft
40 mm metal
10.00
cft
58.50 cft
River sand
25.00
cft
7.34 bag Cement
232.00
bag
100.00 cft
Machinery Hire charges
1.00
l.s
100.00 cft
Labour charge
6.25
cft
100.00 cft
Curing charges
0.10
l.s
Sub total
15 %

Total
Rate per cft =Rs
55.20
P.C.C 1:4:8 using 50% 0f 40mm metal & 50 % of 20mm metal for flooring
100mm thick -Rate for 100sft
15.00 cft
40mm metal
9.00
cft
15.00 cft
20mm metal
16.00
cft
19.50 cft
River sand
25.00
cft
3.06 bag Cement
220.00
bag
100.00 sft
Machinery Hire charges
1.00
l.s
100.00 sft
Labour charge
6.25
sft
100.00 sft
Curing charges
0.10
l.s

10 %

5520.437

135
240
487.5
673.2
100
625
10
2270.7
227.07

Total

2497.77

6.50
25.00
220.00
6.25
0.10

cft
cft
bag
cft
l.s

715
975
770
625
10

Sub total

3095
309.5

Total

3404.5

no
no
cft
bag
cft
l.s

1062.5
42.5
975
770
625
10

Sub total

3485
348.5

Total

3833.5

cft
bag
lit
sft
l.s

200.2
392
46.8
300
10

over head& profit

over head& profit

Rate per cft =Rs


DPC in cm 1;3,20 mm thick with WPC-Rate for 100sft
9.10 cft
River sand
1.96 bag Cement
0.39 lit
Water proof compound
100.00 sft
Labour charge
100.00 sft
Curing charges

4800.38
720.057

24.98

Rate per cft =Rs


34.05
Size stone masonry in cm 1:7 for foundation -Rate for 100cft
250.00 cft
Size stone
4.25
10.00 cft
Bond stone
4.25
39.00 cft
River sand
25.00
3.50 bag Cement
220.00
100.00 cft
Labour charge
6.25
100.00 cft
Curing charges
0.10

10 %

900
1462.5
1702.88
100
625
10

Sub total
over head& profit

Rate per sft =Rs


R.R.masonry in cm 1: 7 for foundation -Rate for 100cft
110.00 cft
Rubble
39.00 cft
River sand
3.50 bag Cement
100.00 cft
Labour charge
100.00 cft
Curing charges

10 %

over head& profit

AMOUNT

38.34
22.00
200.00
120.00
3.00
0.10

S.NO

QTY

Uom

DESCRIPTION

RATE

PER
Sub total

10 %

Total
Rate per sft =Rs
10.44
Flooring with P.C.C 1:3:6 using 40 mm metal of 75mm thick -Rate for 100sft
22.50 cft
40mm metal
9.00
cft
14.63 cft
River sand
25.00
cft
3.06 bag Cement
220.00
bag
100.00 sft
Machinery Hire charges
1.00
l.s
100.00 sft
Labour charge
4.00
sft
100.00 sft
Curing charges
0.10
l.s

202.5
365.75
673.2
100
400
10

Total
Rate per sft =Rs
19.27
Floor finishing with CC 1:11/2:3 using 6 mm metal-75mm thick-Rate for 100sft
25.00 cft
6mm metal
6.00
cft
14.63 cft
River sand
25.00
cft
6.12 bag Cement
220.00
bag
100.00 sft
Machinery Hire charges
1.00
l.s
100.00 sft
Labour charge
4.25
sft
100.00 sft
Curing charges
0.10
l.s

1926.595

Sub total

2397.15
239.715

over head& profit

over head& profit

150
365.75
1346.4
100
425
10

Total
2636.865
Rate per sft =Rs
26.37
P.C.C 1:2:4 using 20mm metal excluding centering & fabrication-Rate for 100cft
90.00 cft
20mm metal
17.00
cft
1530
58.50 cft
River sand
25.00
cft
1462.5
18.35 bag Cement
233.00
bag
4275.55
100.00 cft
Machinery Hire charges
1.00
l.s
100
100.00 cft
Labour charge
0.00
sft
0
100.00 cft
Curing charges
0.10
l.s
10

20 %

1043.9

1751.45
175.145

10 %

949
94.9

Sub total
10 %

over head& profit

AMOUNT

Rate per cft =Rs


Sunshade 75mm thick average-Rate for 100 sft
25.00 cft
P.C.C.1:2:4
100.00 sft
Labour charge

20 %

7378.05
1475.61

Total

8853.66

cft
sft

2213.415
0

Sub total

2213.415
442.683

Total

2656.098

cft
sft

3689.32
300

Sub total

6645.418
664.5418

88.54
88.54
0.00

over head& profit

Rate per sft =Rs


10 Gutter slab 125 mm thick-Rate for 100 sft
41.67 cft
P.C.C.1:2:4
100.00 sft
Labour charge

10 %

Sub total
over head& profit

over head& profit

26.56
88.54
3.00

S.NO

QTY

Uom

DESCRIPTION

Rate per sft =Rs


11 Gutter wall 75mm thick-Rate for 100 sft
25.00 cft
P.C.C.1:2:4
100.00 sft
Labour charge

10 %

RATE

PER

AMOUNT

Total

7309.96

cft
sft

2213.415
800

Sub total

10323.37
1032.337

73.10
88.54
8.00

over head& profit

Total
Rate per sft =Rs
113.56
12 Brick work 9" thick& above in cm 1:6 for superstructure-Rate for 100 cft
1250.00 no
Brick
2.50
no
32.00 cft
River sand
25.00
cft
3.40 bag Cement
220.00
bag
100.00 cft
Scaffolding charges
0.50
l.s
100.00 cft
Labour charge
6.50
cft
100.00 cft
Curing charges
0.10
l.s
Sub total
10 %

over head& profit

Total
Rate per cft =Rs
59.21
13 Brick partition 41/2" thick in cm 1:5 including hoop iron-Rate for 100sft
470.00 no
Brick
2.75
no
13.00 cft
River sand
25.00
cft
1.54 bag Cement
232.00
bag
140.00 rft
Hoop iron
0.00
rft
100.00 sft
Scaffolding charges
0.00
l.s
100.00 sft
Labour charge
9.00
sft
100.00 sft
Curing charges
0.10
l.s
Sub total
20 %

over head& profit

11355.71

3125
800
748
50
650
10
5383
538.3
5921.3

1292.5
325
357.28
0
0
900
10
2884.78
576.956

Total
3461.736
Rate per sft =Rs
34.62
14 Plastering in cm1:4 for an average thickness of 15mm internal&external surface
Rate for 100 sft (FFL to 8'-00")
6.40 cft
River sand
25.00
cft
160
1.00 bag Cement
232.00
bag
232
100.00 sft
Scaffolding charges
0.50
l.s
50
100.00 sft
Labour charge
4.00
sft
400
100.00 sft
Curing charges
0.10
l.s
10

20.00 %

Sub total

852
170.4

Total

1022.4

cft
bag
l.s
sft
l.s

160
294.8
50
400
10

Sub total

914.8

over head& profit

Rate per sft =Rs


15 Ceiling plastering in cm1:3 -Rate for 100 sft
6.40 cft
River sand
1.34 bag Cement
100.00 sft
Scaffolding charges
100.00 sft
Labour charge
100.00 sft
Curing charges

10.22
25.00
220.00
0.50
4.00
0.10

S.NO

QTY Uom
DESCRIPTION
10.00 %
over head& profit

RATE

PER

AMOUNT
91.48

Total
Rate per sft =Rs
10.06
16 Floor finishing with CC 1:11/2:3 using 6 mm metal-50mm thick-Rate for 100sft
16.67 cft
6mm metal
8.00
cft
9.75 cft
River sand
25.00
cft
4.08 bag Cement
220.00
bag
100.00 sft
Machinery Hire charges
0.50
l.s
100.00 sft
Labour charge
4.00
sft
100.00 sft
Curing charges
0.10
l.s

1006.28

Sub total

1734.71
173.471

10 %

over head& profit

Total
Rate per sft =Rs
19.08
17 Brick on edge over sunshade 200 mm height including plastering with
cm1:4-Rate for 100 rft
270.00 no
Brick
3.50
no
8.20 cft
River sand
25.00
cft
2.90 bag Cement
220.00
bag
100.00 rft
Scaffolding charges
0.50
l.s
100.00 rft
Labour charge
2.75
rft
100.00 rft
Curing charges
0.10
l.s
Sub total
10 %

over head& profit

Total
Rate per Rft =Rs
23.35
18 Weathering course using brick jelly lime concrete for an average 0f 75 mm thick
Rate for 100sft
25.00 cft
Brick bats
60.00
cft
9.76 cft
Lime
20.00
cft
100.00 sft
Scaffolding charges
0.50
l.s
100.00 sft
Labour charge
10.00
sft
100.00 sft
Curing charges
0.10
l.s
Sub total
20 %

over head& profit

133.36
243.75
897.6
50
400
10

1908.181

945
205
638
50
275
10
2123
212.3
2335.3

1500
195.2
50
1000
10
2755.2
551.04

Total
3306.24
Rate per sft =Rs
33.06
19 Pressed tiles 200 X 200 mm size in cm 1:4,20mm thick mixed with WPC-Rate for 100sft
250.00 no
Weathering tile
5.00
no
1250
9.10 cft
River sand
25.00
cft
227.5
1.47 bag Cement
220.00
bag
323.4
0.29 lit
Water proof compound
0.00
lit
0
100.00 sft
Labour for laying& finishing
4.00
sft
400
100.00 sft
Curing & scaffolding charges
0.10
l.s
10
Sub total
10 %

over head& profit

2210.9
221.09

Total
2431.99
Rate per sft =Rs
24.32
20 Lath plastering in CC1:2:4 ,75mm tick including both side plastering with cm1:4
Rate for 100 sft
16.63 cft
CC 1:2:4
88.54
cft
1472.364

S.NO

QTY
110.00
13.00
1.78
100.00
100.00

Uom
sft
cft
bag
sft
sft

10 %

DESCRIPTION
Chicken mesh
River sand
Cement
Labour for lathing,plastering& finishing
Curing & scaffoldingcharges

RATE
22.00
200.00
2.75
0.00

PER
sft
cft
bag
sft
l.s

AMOUNT
0
286
356
275
0.1

Sub total

2389.464
238.9464

over head& profit

Total
Rate per sft =Rs
26.28
21 Plastering in cm 1:4-20mm thick with WPC for sunshade top-Rate for 100sft
9.10 cft
River sand
25.00
cft
1.47 bag Cement
220.00
bag
0.29 lit
Water proof compound
130.00
lit
100.00 sft
Scaffolding & Curing charges
0.50
l.s
100.00 sft
Labour charge
3.00
sft
Sub total
10 %

over head& profit


Total

Rate per sft =Rs


22 Supplying and fixing of steel door-Rate for 100 sft
100.00 sft
Cost at site
100.00 sft
Fixing charges
100.00 sft
Grouting
200.00 sft
Primer

10 %

10.00 %

10.00 %

92.00
6.00

1032.46

3.25

9200
600
0
650

Sub total

10450
1045

Total

11495

114.95
0.00

sft
sft
l.s
sft
sft
sft
sft

0
0
0
0
0
0
0

Sub total

0
0

Total

no
cft
bag
cft
l.s

945
217.58
300
176.55
35.31

Sub total

1674.44
167.444

Total

1841.884

0.00
15.00
22.00
200.00
5.00
1.00

over head& profit


Rate per cu.mt =Rs
Rate per cft =Rs

938.6
93.86

sft
sft
l.s
sft

over head& profit

Rate per sft =Rs


24 8" Hollow block masonry work in cm1:5-Rate per cu.mt
63.00 no
8" Hollow block
9.89 cft
River sand
1.50 bag Cement
35.31 cft
Labour charges
35.31 cft
Scaffolding & Curing charges

227.5
323.4
37.7
50
300

10.32

over head& profit

Rate per sft =Rs


23 Supplying and fixing of steel window-Rate for 100 sft
100.00 sft
Cost at site
100.00 sft
Fixing frame
100.00 sft
Grouting
100.00 sft
Primer
100.00 sft
4mm plain glass
100.00 sft
fixing glass
100.00 sft
putty/beading

2628.41

52.16

S.NO QTY Uom


DESCRIPTION
RATE
25 Floor concrete tile of size 490X 200 X 35mm with
slit opening 300 x 50mm using mosaic chips- Rate for 100 numbers
10.90 cft
Blue metal
8.00
2.34 cft
Mosaic chips
120.00
3.12 cft
Crusher dust
3.00
125.00 kg
Cement
4.00
15.60 kg
Steel
35.00
100.00 no
Labour
12.00
100.00 no
curing
0.10
Transport charges

10.00 %

10.00 %

Total

3391.696

kg
kg
kg
each
each
l.s

150
12.8
6
300
300
100

Sub total

868.8
86.88

Total

955.68

33.92
5.00
80.00
60.00
200.00
150.00
1.00

9.56
0.89
135.00
200.00
150.00
1.00

lit
each
each
l.s

3645
364.5

40.10
3.73

Total

4009.5

80.00
200.00
150.00
1.00

lit
each
each
l.s

800
1200
450
100

Sub total

2550
255

Total

2805

28.05
2.61

120.00 kg
200.00 each
150.00 each
1.00
l.s
Sub total

10.00 %

over head& profit

1620
1100
825
100

Sub total

over head& profit

Rate per Sq.mt =Rs


Rate per sft =Rs
29 Wall putty 3mm thick-Rate for 10 sq.mt
2.33 kg
Putty
1.00 each Painter 1 class
1.00 each Painter 2 nd class
10.00 sq.mt Scaffolding & others

87.2
280.8
9.36
500
546
1200
10
450
3083.36
308.336

over head& profit

Rate per Sq.mt =Rs


Rate per sft =Rs
28 Distember 2 coats-Rate per 100 sq.mt
10.00 lit
Distember
6.00 each Painter 1 class
3.00 each Painter 2 nd class
100.00 sq.mt Scaffolding & others

AMOUNT

Sub total

over head& profit

Rate per Sq.mt =Rs


Rate per sft =Rs
27 Painting new wood work 2coats-Rate for 100sq.mt
12.00 lit
Paint
5.50 each Painter 1 class
5.50 each Painter 2 nd class
100.00 sq.mt Scaffolding & others

10.00 %

cft
cft
cft
kg
kg
no
l.s

over head& profit

Rate per Number =Rs


26 White washing 2 coats -Rate per 100 Sq.mts
30.00 kg
Lime
0.16 kg
gum
0.10 kg
blue
1.50 each Painter 1 class
2.00 each Painter 2 nd class
100.00 sq.mt Scaffolding & others

10.00 %

PER

279.6
200
150
10
639.6
63.96

S.NO

QTY

Uom

DESCRIPTION
Rate per Sq.mt =Rs
Rate per sft =Rs
30 Primer 2 coat for wood work-Rate for 10 sq.mt
1.44 lit
Wood Primer
0.70 each Painter 1 class
10.00 sq.mt Scaffolding & others

10.00 %

PER
Total

120.00 lit
200.00 each
150.00 l.s

199.41
18.53

Total

1994.08

120.00 lit
200.00 each
1.00 l.s

34.06
3.17

172.8
140
1500
1812.8
181.28

159.6
140
10

Sub total

309.6
30.96

Total

340.56

over head& profit


Rate per Sq.mt =Rs
Rate per sft =Rs

AMOUNT
703.56

Sub total
over head& profit

Rate per Sq.mt =Rs


Rate per sft =Rs
31 Primer 2 coat for iron work-Rate for 10 sq.mt
1.33 lit
Primer for steel work
0.70 each Painter 1 class
10.00 sq.mt Scaffolding & others

10.00 %

RATE
70.36
6.54

Potrebbero piacerti anche