Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
: D-2-01-03-01-03
400/220kV
II.
SL .NO
PRE-COMMISSIONING CHECKS:
DESCRIPTION STATUS YES YES YES YES YES YES NO REMARKS
1 2 3 4 5 6 7 8 9 10 11 12 13
Equipment is free from dirt/dust foreign materials etc. Equipment is free from all visible defects on physical inspection Support structures, marshalling box has been provided with double earth All nuts and bolts are tightened correctly as per specified torque Equipment erection is complete in all respect & erection completion certificate along with list of outstanding activities reviewed (attach remaining activities, if any) Permanent pole leveling and identification is done Leveling and alignment of structure and base frame is checked Control box / marshalling kiosk is free from any physical defects Tightness of nuts bolts of terminal connectors are checked Auxiliary contacts and relays have been cleaned and free from rust / damage All spare wires to be kept with ferrules but not terminated at the terminal blocks Check all the valves in the sf6 pipe line are tightened, DILO coupling are tightened. Slow and power closing operation and opening done (wherever applicable)
Circuit Breaker
III.
OPERATING SYSTEM
Closing Hydraulic Pneumatic Spring Others Opening Hydraulic Pneumatic Spring Others
yes
Yes
i. a)
Y NA NA NA NA NA NA NA NA
NA NA NA NA
b)
Pump details
Make Serial number Type Year of manufacturer
NA NA NA NA
NA NA NA NA
c)
Oil Pressure Monitor Closing Lockout Auto Reclosing Lockout General Lockout Anti Pumping Contactor Pole Discrepancy Timer Auxiliary
Circuit Breaker
NA NA
NA NA
NA NA
NA NA
d)
Operation checks
1 2 3 4
6 7 8 9 10
Pre-filling pressure of N2 in accumulator ( bar / deg. C) Pump running time for charging hydraulic system from initial pressure to working pressure Checking safety valve (open/close) Hydraulic pressure drop for 1 hr Breaker on position Breaker off position Oil pressure monitor Pump on / off bar Pump running time Auto reclosing lockout (oil) Pressure contact _____________ make/break Closing lockout (oil) pressure Contact __________make/break General lockout (oil) Pressure contact __________ make/break Checking anti pumping contactor Pressure contact __________make/break Checking loss of nitrogen Pressure contact __________make/break
3. Oil pressure drop during operations and pump running time in seconds
SL.NO (i) DESCRIPTION
(ii)
Pressure before operation(Bar) Pressure after closing operation(Bar) Pump running time(Sec) Pressure before operation(Bar)
Circuit Breaker
(iii)
(iv)
Pressure after opening operation(Bar) Pump running time(Sec) Pressure before operation(Bar) Pressure after close/open operation (Bar) Pump running time in sec Pressure before operation(Bar) Pressure after open-close-open operation(Bar) Pump running time(Sec)
NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA
ii.
Pneumatic System
R- Y- NA NA NA NA NA NA NA NA B
Remarks
Air receiver no Control block no Pneumatic drive no Magnetic ventil no b) Motor details Make Serial number Type Year of manufacturer c) ICU Details
NA NA NA NA
NA NA NA NA
NA NA NA NA
NA NA NA NA NA NA
Air Pressure Monitor Closing Lockout Auto Reclosing Lockout General Lockout Pole Discrepancy Timer Auxiliary
Circuit Breaker
NA NA
NA NA
NA NA
NA NA
CIRCUIT REFERENCE
NA NA NA NA Operation lockout -1 NA NA NA NA Operation lockout -2 NA NA NA NA Closing lockout NA NA NA NA Auto reclosing ckt NA NA NA NA Low/high pressure NA NA NA NA Alarm circuit NA NA NA NA ICU auto setting NA NA NA NA ICU safety valve NA NA NA NA Operations Factory test report ref no: ________________________________
f)
SL NO A B C D E
Tripping through TC-I Tripping through TC- II Closing circuit Close-open operation Open - close - open
Factory test report ref no: ________________________________ g) Number of operation from local Tank pressure ___________ kg/sq.cm or bar
BREAKER INITIALLY CLOSE : NA FACTORY TEST : SITE TEST : BREAKER INITIALLY OPEN : NA FACTORY TEST : SITE TEST : C-ONA C-OPLEASE KEEP INLET PNEUMATIC VALVE CLOSED IN THESE OPERATION O-CNA O-CPLEASE KEEP INLET PNEUMATIC VALVE CLOSED IN THESE OPERATION
BREAKER ON
Circuit Breaker
iii.
SPRING OPERATING
NA NA NA NA NA
SYSTEM
NA NA NA NA
a) Motor details Make Sl no Type Year of Manufacture Dc current taken by motor for charging the spring ( amp) Volt Amperes Hp/kw Setting (thermal overload)
CIRCUIT REFERENCE
MAKE NA NA NA NA NA NA NA NA NA NA NA NA NA NA
SERIAL NO.
Closing lockout Auto reclosing lockout General lockout Pole descrepancy timer Auxillary Power contactor Others
TYPE NA NA NA NA NA NA NA
NO+NC NA NA NA NA NA NA NA
c)
Circuit Breaker
CHARGING TIME
Factory test report ref no
3.5s
3.6s
4.25s
4.0s
3.6s
3.9s
IV.
Make Model Sl.no Year of manufacture Quantity of SF6 gas filled actual As per Specification ii. SF6 density monitor settings
WIKAI 280HNYI
7.8bar
7.8bar
7.8bar
DETAILS PHASE
REFILL ALARM OPERATION BLOCK REFILL ALARM OPERATION BLOCK REFILL ALARM OPERATION BLOCK : Measurement of dew point of sf6 gas
Circuit Breaker
Dew point measurement of SF6 gas needs to be done pole wise in close loop method without any wastage of SF6 gas
NOTE:
iv.
SL.NO
Leakage check
UNIT
INTERVALS
A B C D
Initial filling of sf6 gas at ____deg c (As per temp. Correction chart ) Drop in sf6 gas pressure in 24 hrs : Final sf6 pressure at __24______deg. C After all testing Additional leakage test by covering individual joint with polythene
V.
Circuit Breaker
SL NO
PHASE
UNIT
MEASURED VALUE
SERIES RESISTOR
TOTAL
NA NA NA NA NA NA NA NA NA
VI.
SL NO
A B C D E F G H I J
TRIPPING THROUGH TC-I TRIPPING THROUGH TC-II CLOSING CIRCUIT ANTI-HUNTING FEATURE (CLOSE OPEN OPERATION ) POLE DISCREPANCY FEATURE BREAKER POSITION INDICATION HEATER IN SWITCH CUBICLE HEATER IN CONTROL CUBICLE ILLUM. IN SWITCH CUBICLE ILLUM. IN CONTROL CUBICLE
OK OK OK OK OK OK OK OK OK OK OK
Note: In case wiring for remote operation is not ready, please indicate terminal number along with wire ferrule number in switch cubicle where remote cables shall be terminated. Remote operation can be checked from these terminals
VII.
PHASE
BREAK
R - ph main contact R - PH PIR ( 12 4 ms) Auxiliary contact R - ph main contact R - PH PIR ( 12 4 ms) Auxiliary contact Y - ph main contact Y - PH PIR ( 12 4 ms) Auxiliary contact Y - ph main contact Y - PH PIR ( 12 4 ms) Auxiliary contact
BREAK 1
BREAK 2
106.3 118.0
BREAK 1
106.1 116.5
BREAK 2
106.1 116.5
Circuit Breaker
B - ph main contact B - PH PIR ( 12 4 ms) Auxiliary contact B - ph main contact B - PH PIR ( 12 4 ms) Auxiliary contact
BREAK 1 BREAK 2
NOTE: for 765 kV, take measurements for four breaks VIII. IR VALUE OF CONTROL CIRCUIT(USING 500 VOLT MEGGER)
COIL DETAILS
R PHASE TRIP COIL - I R PHASE TRIP COIL - II R PHASE CLOSE COIL Y PHASE TRIP COIL - I Y PHASE TRIP COIL - II Y PHASE CLOSE COIL B PHASE TRIP COIL - I B PHASE TRIP COIL - II B PHASE CLOSE COIL
UNIT
M M M M M M M M M
MEASUREMENT VALUE >1000 >1000 >1000 >1000 >1000 >1000 >1000 >1000 >1000
CAUTION: Isolate necessary dc for trip coil i and trip coil ii ,closing coil before meggaring. MINIMUM VALUE 2 MOHM
IX. IR VALUE WITH BREAKER OPEN(USING 5000 VOLT MEGGER)
ACROSS OPEN CONTACT R - PHASE BREAK 1 R - PHASE BREAK-2 Y - PHASE BREAK 1 Y - PHASE BREAK-2 B - PHASE BREAK 1 B - PHASE BREAK-2 UNIT G G G G G G MEASUREMENT VALUE
UNIT
MEASUREMENT VALUE
436
Circuit Breaker
G G
500 450
XI.
MEASUREMENT VALUE 109 113 101 105 103 106 109 108 103
R PHASE TRIP COIL - I R PHASE TRIP COIL - II R PHASE CLOSE COIL Y PHASE TRIP COIL - I Y PHASE TRIP COIL - II Y PHASE CLOSE COIL B PHASE TRIP COIL - I B PHASE TRIP COIL - II B PHASE CLOSE COIL
XII.
i.
GRADING CAPACITOR - NA
DETAILS INTERRUPTER 1 R NA NA NA NA NA NA NA NA NA NA Y NA NA NA NA NA B NA NA NA NA NA R NA NA NA NA NA INTERRUPTER 2 Y NA NA NA NA NA B
DETAILS MAKE SERIAL NO. CAPACITANCE VALUE FACTORY VALUE YEAR OF MANUFAC. ii.
CAPACITANCE AND TAN DELTA MEASUREMENT (TO BE DONE IN UST MODE) INTERRUPTER 1 R NA NA NA NA NA NA NA NA NA NA NA NA NA NA Y NA NA NA NA NA NA NA B NA NA NA NA NA NA NA R NA NA NA NA NA NA NA INTERRUPTER 2 Y NA NA NA NA NA NA NA B
Permissible Limits a) Tan delta of grading capacitors 0.007 (max.) b) Rate of rise in Tan Delta 0.001 per year (max) c) Capacitance of grading capacitors within 5% of the rated value Note: a) Since temperature correction factor for Tan-Delta depends on make, type and also aging conditions, the correction
factors for different types / makes are different. Hence, no standard temperature correction factors can be applied.
b) In case of violation of Tan-Delta the test results with temperature are to be referred to CC/OS
Circuit Breaker
XIII. CONTACT RESISTANCE MEASUREMENT Eqipment detail:- CRM 100 &Sr No:-2300.06X60 Calib date 29/12/2011 All Values In Micro-Ohm
SL.NO A B C PHASE R-PHASE Y-PHASE B-PHASE ACROSS EACH POLE FACTORY 75.1 73.5 73.8 82 81 80 SITE ACROSS INTERRUPTR 1 FACTORY NA NA NA 38 39 38 SITE ACROSS INTERRUPTR 2 FACTORY NA NA NA 39 40 40 SITE
220kV 100
132kV 100
* 75 (Micro-Ohm) per break b) Contact Resistance of CB terminal connector 10 Micro-Ohm per connector
SL.NO A B C
XV.
CHECK FOR ANNUNCIATION IN CONTROL ROOM AS PER THE FOLLOWING FORMATS AND RECORD THE READING
WINDOW SOURCE OF INITIATION DESCRIPTION OK RESULT REMARK NOTOK
SL NO
DESCRIPTION OF TEST
A B
Switch off the dc switch in Control cubicle Switch off the ac Switch in control
Circuit Breaker
C D E F
Cubicle Short the alarm contacts of sf6 Gas density monitor (R-phase) Short the alarm contacts of sf6 Gas density monitor (Y-phase) Short the alarm contacts of sf6 Gas density monitor (B-phase) Remove the cable connected to density monitor (R-phase) Remove the cable connected to density monitor (Y-phase)
ac Switch on/off Density monitor Density monitor Density monitor Density monitor Density monitor
fail / ac fail Sf6 gas density low Sf6 gas density low Sf6 gas density low Operation/closi ng lockout Operation/closi ng lockout Operation/closi ng lock out Breaker pole discrepancy Breaker pole discrepancy Breaker pole discrepancy
G Remove the cable connected to density monitor (B-phase) H Give tripping command to R-ph only and check the operation of pole discrepancy relay Give tripping command to Y-ph Only and check the operation of pole discrepancy relay Give tripping Command to B-ph only and check the operation of pole discrepancy relay Check other alarms as per plant Circuit diagram Close the breaker and trip through Protection which are applicable
Density monitor Pole discrepancy relay at breaker Cubicle Pole discrepancy relay at breaker Cubicle pole discrepancy relay at breaker cubicle
J K
: The tripping details are to be checked as per the Scheme approved by engineering.
NOTE
XVI.
PHASE R
Enclosed
Y B
Circuit Breaker
2.5 ms
Note- 2.5 Sec for CBs with Auto Reclose Function & 0.5 Sec for CBs without Auto Reclose Function.
XVIII. MECHANICAL CLOSE INTERLOCK CHECKED (WHEREVER APPLICABLE) XIX. FINAL DOCUMENTATION REVIEW
Yes Yes
No
Yes Yes
No
i. ii.
Factory test results are available Final documents of Pre- Commissioning checks reviewed and approved
Yes Yes No
iii.
Yes Yes
No
for O&M purpose iv. After modification, if any, As built Drawings are available at site
Yes Yes No
v.
Yes Yes
No
Circuit Breaker
Circuit Breaker