Problem Statement
’Computerized information system targeted for ’Identification and aggregation of skilled people
facility management that work within the university.
’For use by janitors, students, staffs, and ’Better brand recognition of the university in the
managers field of computerized information systems.
’To be sold as a commercial product ’Financial benefits obtained from the system's
licensing and training services.
ID
1
Task Name
Meetings
March
02-03 30-03
May
27-04 25-05
July
22-06 20-07
September November January March
17-08 14-09 12-10 09-11 07-12 04-01 01-02 29-02 28-03
May
25-04 23-05
July
20-06
18-07
27-02
’Start: April 21, 2003
14 Product Documentation
19
24
32
Requirements
Training/Orientation
Preliminary Design/Prototyping
’Final Requirements Document: August 8, 2003
’Final Design Document: October 17, 2003
35 Detailed Design
42 Construction
50 Change Management
54 Deployment
’Properly documented system architecture. ’Ensure that the programmers properly document their
code.
’Properly documented source code - hypertext
document with detailed descriptions for all classes, ’Ensure a System Description document exists and easily
properties, and methods. understandable.
’Properly documented database schema. ’Ensure the requirements specifications are complete
and concise.
’The system will be user-friendly.
’Ensure the database design is properly documented.
’The user's manual will be separated into several parts:
tutorial, reference, and system administration. ’Performs user test often.
’Reviews the manuscripts for the user manuals.
Communication Plan Communication Plan
Project Sponsor Project Manager
’Message/Information Need
’ Project Manager must receive input from Project Team members about
’Message/Information Need the progress of the project. He also needs information from internal and
’ Project sponsor needs infornation from project manager about external stakeholders about their information and communications
requirements, determine the best and most cost effective way in which
project documents and also about progress report. the requirements can be met, and record the information in a formal,
’Delivery Vehicle approved document.
’ By Courier ’Delivery Vehicle
’ By courier and meeting
’Frequency
’Frequency
’ Weekly
’ Weekly
’Feedback ’Feedback
’ Provide other stakeholder about what other stakeholder need ’ Communicate with other stakeholder and coordinate with project team
member