Sei sulla pagina 1di 7

ummary

Indonesian 33 years old, Married with two children. Having Work Experience in Construction of Oil & Gas Company Project in QA/QC Department as QC/Welding Inspector, Structural Welding Map-NDE Planner & QC Certification/Documentation. Conducting QC Inspection (Material Traceability, Fit Up, Welding Visual Up to NDE Clearance) of Structural & Process Piping Fabrication (Shop, Assembly & Erection) of FPSO Top Side Modules, Try Ethylene Glycol Package, Produced Water Hydro Cyclone Package & Gathering Testing Satellite (GTSs) include Adjacent Wellhead Platform, Walkways, Bridges, Vent Tripod, Telemetry House, ESDV & KO Drum Platform. I have assigned as QC Inspector/Main Contractor Representative at some Vendors Fabricator of Pressure Vessels, Column, Air Cooler & Filters. My Experience also include of Processing of QC data To get updated Welding Repair Rate & Welder Performance Weekly Basis. Hard-working individual, self-motivated, easy to communicate with people. Specialties:QC Engineer/Inspector Structural Welding Map NDE Planner QC Certification, Documentation & Data Set Up.

Experience
QC Pipeline/Welding Inspector
McConnell Dowell Consolidated Contracting Company Joint Venture (MCJV) Supplied BY Intertek Moody

June 2012 Present (1 year 2 months)Chinchilla~Gladstone - Brisbane, Queensland Ensure All the specific inspections of 42 x 14.1/18 WT Pipeline of QCLNG Upstream Project in accordance to Client Specification, Code & Standard. Welding Activity is carried out in accordance with approved WPS (Fit Up Inspection, Parameter Check including calculation of Heat Input & Welding Visual Inspection). Covering & Monitoring of Pipeline Activity Such as Cold Bend Activity, Beveling (V or J Preparation), Main Line Welding by CRC welding machine (GMAW Process), Lowering of Crossing Section (Road, River, Railway Crossing) then continue to Stab on & Tie-in Welding activity by Manual (SMAW Process). Conducting/Witness of Welding Procedure Qualification & Welder Qualification Test. Generate QA/QC Document Such as Daily Welding Record (DWR), As Run Sheet, Random Welding Inspection Check List & NDT Request to be handed to QA for updating in Data Store or Talisman System in daily basis. QA/QC Inspector
CLOUGH AMEC PTY LTD - PERTH , AUSTRALIA Supplied BY Oceaneering International Services LTD, Australi

April 2012 June 2012 (3 months)Australia Monitoring & Executing of the specific inspections of Structural & Process Piping of Kumul Marine Terminal Platforms Rejuvenation Project in accordance to Client Specification, Code & Standard. Such as Fit Up Inspection, Welding Visual Inspection & Dimensional. Conducting Line Check (Walk) before Hydro Test, Generating Punch List & follow up for the Closing. Conducting Flange Management Inspection during Reinstatement Piping Line. Updating & Preparing QC Document & Certification into QC Final Documentation which will be handed over to Client (Oil Search Limited) (Open)1 recommendation
Neil Christie
Construction Manager at AMEC

Budiansyah work , knowledge and application was of great benefit and contributed well to the project delivery acheivements, self motivated to keep up with project progress and requirements and able to work with minimal supervision, would re-employ...View QC Engineer / Inspector
PT. Nippon Steel Construction Indonesia

November 2010 March 2012 (1 year 5 months)Batam Monitoring Incoming Material, Conduct Inspection & Verification together with Client Representative for Structural, Process Piping, Mechanical, Safety & Electrical Instrument Material. Preparing & Submit to client for Material Receiving & Inspection Report (MRIR). Then coordinating to Material Control to key in Accepted material to be released to Production/Fabrication. Follow Up Material of Non Conformance Report & Overage Shortage & Damage Report to be resolved & closed. Liaise to Client related to NCR & OSD Report, go to inspect & observe the material with client to get Material Acceptance Status (give technical explanation based on minimum standard or specification). Liaise to Procurement & Engineer Department related to discrepancy Material between actual received material & Purchase Order or Engineering Design. Reviewing to Ensure Material Certificates are base on & comply with Standard & Specification. Coverage Inspection of any Fabricated of Equipment (Pressure Vessels) at PT. Heat

Exchanger Indonesia. Conducting Quality Inspection (Material Traceability, Fit Up Welding Preparation, during Welding, Visual Welding & Dimensional Check). Monitoring of Overlay SS316 work of CS Flanges at PT. Cladtek Bi Metal Manufacture-Batam. Attending & Conducting of Pre Inspection Meeting, Spot / Random Check of Welding Process during overlay work & Witness of Final Inspection of complete overlaid Flanges (Final Visual & Dimensional, Dye Penetrant Test, PMI & review of Manufacture Report Book / Manufacture Documentation) Material (Pipe Fittings) Inspection at JW Macs Singapore Witness of Preparation & PQT of Passive Fire Protection (PFP) at Trelleborg Singapore. Witness of Mechanical Test (Tensile, Charpy V Notch, Bend Test & Through Thickness Properties (Z) Test @PTS Singapore Conduct final inspection of Wellhead control Panel Closure @ TOF Singapore Witness of PQT (Cathodic Disbondment Test) of PE & PP Coating Pipeline 14 & 24. QC Engineer / Inspector
PT. Tripatra Engineers and Constructors

January 2010 October 2010 (10 months) Supervising, Inspection, Monitoring, Expediting & Reporting of Vendor Fabrication Process of Pressure Vessels At PT. Heat Exchanger Indonesia, Batam. TEG Dehydration Package & Produced Water Hydro Cyclone Package at PT. Profab Indonesia, Batam, Mercury & Non Mercury Filters At PT. Transalindo Eka Persada, Batam. Verification of Incoming Material & Review the Certificate. Ensure of Quality Inspection (Material Traceability, Fit-Up and Welding Visual Inspection), WPS and Welder Qualification as per Specification. Conducting Final Visual Inspection & Dimensional Check. Interpreting Radiography Film Ensure Preparation & Witness Hydro Testing of Pressure Vessels or Piping Test Package. Witness and Review for Positive Material Identification, Ferrite Content Check, Post Weld Heat Treatment, Hardness Test & Pickling/Passivation. Monitoring of piping fabrication and erection works, Conduct Line Check (Walk) before Hydro Test, Issued Punch List & follow up for the Closing. Monitor of Painting Activity for Structural, Piping & Pressure Vessels Internal or External. Witness of Adhesion Test. Witness of Mechanical Destructive Test (Charpy Impact Test, Bend Test, Tensile Test, Ferrite Content & Pitting Corrosion Test) Review the Manufacture Data Record (MDR).

QC Inspector
Global Process Systems

January 2008 October 2009 (1 year 10 months) Monitoring of the structural & piping fabrication and erection works. Ensure that all quality records are accurate, fully traceable and auditable. Ensure Consumable storage and handling. Ensure of Quality Inspection (Material Traceability, Fit-Up and Welding Visual Inspection) as per Specification Ensure WPS and Welder Qualification Before welding. Ensure all NDT clearance for both structure and piping are cleared in a timely manner. Reviewing QC Final Documentation & Ensuring that data and report are maintained and covers for final documentation and packages. Reviewing of Welding Map and NDE Plan of Structure. Supporting Quality Assurance Dossier, NDT Status and NDT Clearance for Pre Commissioning. Set Up Structure & Piping Documentation. Preparing and Reporting Weekly Welding Repair Rate & Welder Performance. Reviewing of Structure and Piping Welding History Summary Record. Conducting Piping Line Walk (Line Check) before doing Hydro test. Preparing & Reviewing of Pre commissioning Document after all pre commissioning scope had been done. Organizing of Preparing and Submitting Quality Control Final Documentation Dossier. (Open)1 recommendation
Eric Oliver
Looking for New Opportunities

Budiansyah was a key player in the compilation of final MDR's for several projects with GPS . His attention to detail and presentation was second to none .Along with that is his vast knowledge as a well qualified QC Inspector in the field. I have...View

QC Inspector & Welding Map-NDE Planner


PT. KALIRAYA SARI

February 2006 October 2007 (1 year 9 months) Follow up for Closing of Non Conformance Report which Been Raised by Client. Drafting and Preparing of Welding Map and NDT Plan of Structure, endorse to clients Approval and making any Revision if Required of Actual Changing at Site. Controlling Quality Assurance Dossier, NDT Status and NDT Clearance for Pre Commissioning. Ensure of Quality Inspection (Material Traceability, Fit-Up and Welding Visual Inspection) as per Specification. Reviewing of Structure and Piping Welding History Summary Record. Reviewing & Ensuring that data and report are maintained and covers for final dossier and packages. Organizing of Preparing and Submitting Quality Control Final Documentation Dossier. QC Inspector
PT. Meindo Elang Indah

August 2005 January 2006 (6 months) Ensure of Quality Inspection (Material Traceability, Fit-Up and Welding Visual Inspection) as per Specification. Ensure that all quality records are accurate, fully traceable and auditable. Ensure WPS and Welder Qualification Before welding. Monitor All NDT activities. Monitoring of structural fabrication and erection works and progress reporting and completion of scope of work. Ensuring that data and report are maintained and covers for final dossier and packages. Controlling Quality Assurance Dossier, Updating and Reporting of NDT Clearance Status for Pre Commissioning. Reviewing of Structure Welding History Summary Record.

QC Inspector & Documentation


PT. Astinaputera Ekaperkasa

July 2003 May 2005 (1 year 11 months) Data input and monitor the NDT result. Performing Quality/welding inspection on structural work. Ensure of Quality Inspection (Material Traceability, Fit-Up and Welding Visual Inspection) as per Specification. Drafting of Welding Map and NDT Plan of Structure. Controlling Quality Assurance Dossier, NDT Status and NDT Clearance for Pre Commissioning. Preparing of Structure and Ensuring that data and report are maintained and covers for final dossier and packages.

Site Supervisor
PT. Mc Connell Dowell Indonesia

August 2002 December 2002 (5 months) Ensure the work follow client specification that related to working and safety procedure. Supervising and Reporting of Sub Contractor PT. Punj Lloyd Indonesia Progress scope, Witnessed Hydrostatic Test of Horizontal Direction Drilling (HDD) String (Pipeline), Holiday Test and Lowering of Swamp Section of The Pipeline.

Certifications
CSWIP 3.1 Welding Inspector - Certification Scheme for Welding and Inspection Personnel
TWI Certification Ltd, UK, License 48214

July 2010 June 2015 Radiograph Interpreter PCN Level II (Attendance)

Malaysian Inspection of Non Destructive Test (MINDT), License MINDT-0509 27083

NDT-Magnetic Particle Testing and Dye Liquid Penetrant Testing ASNT Level II
Indonesian Welding Society (IWS). Batam-Indonesia

Piping Inspector Course (Attendance)


Profesional Learning Institute, Batam-Indonesia, License Certificate of Completion (Cert #120211)

Potrebbero piacerti anche