PROJECT :

Length in
mtrs/piece

No.of Bars

Mark

No.of
Members

Member

Dia in mm

BAR BENDING SCHEDULE


Total Length in mtrs
Total

10

12

16

20

25

32

FOOTING
F1 (15 Nos)

Matt Rod
Bottom

15

12

2.58

464.4

464.4

Top

15

14

2.13

447.3

447.3

Verticals

10

15

13

1.33

259.35

Rings

16

15

2.64

198

Verticals rods

12

29

6.26

1452.32

Laping

20

29

0.8

185.6

Rings (2nos)

25

58

41

1.12

2663.36

Hooks (2nos)

58

41

0.28

665.84

Full rings

12

29

1.44

167.04

Top

16

55

110

Bottom

10

55

110

Laping

0.72

14.4

Extra top

10

1.45

2.9

Rings

32

359

1.26

452.34

PEDESTALS
(200 x 600) col
F1 (15 Nos)

259.35
198

COLUMNS
(200 x 600) col
C1 (29 Nos)

1452.32
185.6
2663.36
665.84
167.04

BEAMS
PB 36 1 no
(200 x 450)

Total Length in mtrs /dia


Weight in Kgs / mtr
Total Qty in Kgs =
Total in MT =
GRAND total in MT =

110
110
14.4
2.9
452.34
1591.94

372.25

1619.36

308

185.6

2663.36

452.34

0.395

0.62

0.888

1.579

2.466

3.855

6.32

628.82

230.80

1,437.99

486.33

457.69

10,267.25

2,858.79

0.63

0.23

1.44

0.49

0.46

10.27

2.86

16.37

Page 1 of 3

Bar Details

Date:

Remarks

Laping 50 dia

Laping 60 dia

Page 2 of 3

1)

2)

CIRCLE
Dia of circle =

10.00

Answers
Radius of circle =
Area of Circle =
Perimeter of Circle =

5.00
78.50
31.40

TRIANGLE
Side AC (left)
Side AB (base)
Side BC (right)
Answers
Height of Triangle =
Area of Triangle =
Perimeter of Triangle =
CG =

10.00
10.00
10.00

30.00

Page 3 of 3

Potrebbero piacerti anche