Specification for Site Preparation A925 Transcoder

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 1/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Contents

Contents
Preface ................................................................................................. 3 1. Customer or Operator Services ..................................................... 6 2. Alcatel Services............................................................................... 8 3. General specifications of product ............................................... 10 4. Site preparation and supply requirements for Customer or Operator ............................................................................................. 15 5. Installation and supply requirements for Alcatel ....................... 24 Appendix A: Installation help: Site cabling raised floor configuration with 1 A925 TC rack, 1 power supply, 1 DDF, 1 PC tool, 1 ground plate ..................................................................... 26 Appendix B. Installation help: Site cabling cable tray configuration with 2 x A925 TC racks, 2 power distribution box, 2 DDF, 1 PC tool, 1 OMC-R, X25 switch, 1 ground plate ........ 28 Abbreviations .................................................................................... 30

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 2/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Preface

Preface
Purpose The document defines the conditions regarding site preparation, for installing
EVOLIUM A925 Transcoder and activities to be handled by Customers and Alcatel Services .

General description of product


The EVOLIUM A925 Transcoder is connected to BSC or MFS with Atermux interfaces and to MSC with A interfaces. With this standard A interface, Alcatel supports the ETSI standardisation process, allowing an operation in a multi-vendor environment. The new A925 Transcoder, compared to the previous generations, allows the rack sharing between several BSC. The basic function of the EVOLIUM A925 Transcoder is to transform the 64 kbit/s user traffic, as defined in the fixed network, into a 16 kbit/s GSM signal format with reduced bandwith. The EVOLIUM A925 Transcoder has been designed in a modular way, permitting flexible extensions. Investment can therefore be optimised by purchasing and deploying the configuration, best suited to the network topology. The EVOLIUM A925 Transcoder is a modular part of the ALCATEL 900/1800/1900 BSS.

Handover of site For documents relating to handover of RCD site before installation of RCD
equipment see SPG-07.

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 3/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Preface

All-in-One Alcatel Service (SM) for Mobile Operators.

This document is used by Survey Premier module.

History
Date 00/03/22 Edition 01 Comments Released. Remarks from G. Crassin, J. Fischle, G. Lefebvre, D. Renaudeau. 00/03/10 01 Second proposal. Remarks from G. Crassin, D. Crehan, JP. Degremont, K. El Naggar, G. Lefebvre, D. Renaudeau. Introduction of X25 switch. 00/01/13 01 Creation , first proposal

Audience
Alcatel Staff (Intermediate level) Installers Customer and Alcatel services

Assumed knowledge

You must have a basic understanding of the following BSS Alcatel operations Site Engineering methods

Related documents
Sigle SPG-07 Title of document Specification of documents relating to handover of RCD site before installation of RCD equipment SPG-10 All-in-One Alcatel Service for Site Engineering. 8BL 00703 0010 DRZZA Alcatel number 8BL 00703 0006 DRAGA

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 4/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Preface

Document Structure
This section provides a summary of the contents of every chapter. Chapter 1 : Chapter 2 : Chapter 3 : Chapter 4 : Operator Chapter 5 : Installation and supply requirements for Alcatel Customer or Operator Services Alcatel Services General specifications of product Site preparation and supply requirements for Customer or

Appendix A : Installation help, site cabling raised floor configuration with 1 A925 TC rack, 1 power supply, 1 DDF, 1 PC tool, 1 ground plate Appendix B : Installation help, site cabling cable tray configuration with 2xA925 TC racks, 2 power distribution box, 2 DDF, 1 PC tool, 1OMC-R, X25 switch, 1 ground plate Abbreviations : Acronyms encountered within the document.

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 5/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 1: Customer or Operator Services

1. Customer or Operator Services


This chapter describes the services to be supplied by Customers or Operators. 1.1 - Services to be performed. 1.2 - Services not treated.

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 6/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 1: Customer or Operator Services

1.1 - Services to be The customer or operator is responsible for choosing the site and for all performed preparation work. The main services are as follows:
Site Preparation of site. (refer to SPG-10) (all-in-One Service: Environment) Qualification and checking Power supply (all-in-One Service: Environment) Earth

Qualification and checking PCM links (all-in-One Service: Cable) Main supplies Lighting (all-in-One Service: Environment) Circuit breaker Lightning protection Power distribution box : 48 or 60 V and 220VAC Ground bar/plate Main supplies DC power and ground cable (all-in-One Service: Cable) Cable way runs from the infrastructure to each TC PCM network termination (NTL) upline if necessary PCM distributor (DDF) Installation Of main supplies, (all-in-One Service: Environment) (all-in-One Service: Environment) Installation Of main supplies, (all-in-One Service: Cable) (all-in-One Service: Cable)

1.2 - Services not treated

All services not provided by Customer or Operator shall be treated as additional Alcatel services.

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 7/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 2: Alcatel Services

2. Alcatel Services
This chapter describes the services to be supplied by Alcatel. 2.1 - Services to be performed

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 8/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 2: Alcatel Services

2.1 - Services to be Alcatel installs the rack . The main services are listed hereafter: performed
Supplying installation kits Basic installation kit. (All-in-One Service: Assemble) PCM cable from Alcatel equipment to DDF, optional. Power and ground cables, optional. X21 cable for X25 extraction in case of collocated OMC-R. DDF (contact to insert), optional. Installation Installation of A925 TC rack. (All-in-One Service: Assemble) Installation of PCM cable. Installation of power and ground cable cables, optional. Installation of DDF, optional. Commissioning Commissioning of A925TC. (All-in-One Service: Acceptance of A925TC. Commissioning)

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 9/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 3: General specifications of product

3. General specifications of product


This chapter describes the general specifications of product about site preparation to install the product . 3.1 - Short description of product 3.2 - Environmental specifications 3.3 - Dimensions and weight specifications 3.4 - Consumption specifications 3.5 - Clearance recommendations 3.6 - Lightning and over voltage protection on equipment specifications 3.7 - X21 interface 3.8 - 2 Mbit/s connections specifications

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 10/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 3: General specifications of product

3.1 - Short description of product


A925 Transcoder consists of a single 19 rack. The rack contains four subracks, each fitted with up to three fans cassette units.Front and rear doors are perforated to provide sufficient air flow inside the rack for temperature cooling. Each subrack can be equipped with up to 12 x MT120 boards. Each MT120 board offers an A ter-mux connection to a BSC and up to 4 A interfaces to the MSC. The rack is fixed on the floor or on raised floor. The additional TC rack is mounted on the right side of the previous one. All external cables are connected through top or bottom of the rack. A925 Transcoder is connected to DC power supply with four wires (0V, 2 x 48V/60V, electrical ground) on top of rack. Each rack must be powered separately with two circuit breakers (BAT A and BAT B). The rack is delivered and packed horizontally or vertically with lifting lugs. In this case room entrances for equipment hoisting must be carefully studied.

3.2 - The environmental conditions define the climatic requirements (air temperature, Environmental humidity, etc.) that apply to the unit in normal storage and operation. They also specifications specify requirements concerning contaminating products and electromagnetic
considerations. Climatic requirements The EVOLIUM A925 Transcoder is compliant with the following requirements: - For storage ETS 300 019-1-1 class 1.1

Conditions are valid for the non-packed equipment (rack). Icing and frosting are not allowed. - For operation ETS 300 019-1-3 class 3.1

Heat and solar radiation are not allowed. Acoustic noise Compliant to ETS 300 753 : Acoustic noise emitted by Telecommunication equipment Electromagnetic environment Compliant to ETS 300-386-1, edition October 1994, for equipment in telecommunication centres and high priority of service

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 11/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 3: General specifications of product

Environmental conditions for EVOLIUM A925 Transcoder (ETS 300 019) Environmental parameter Low air temperature High air temperature Relative humidity High relative humidity Low absolute humidity High absolute humidity Low air pressure High air pressure Sand Dust (suspension) Dust (sedimentation) Stationary vibration, sinusoidal: - Peak-displacement amplitude - Peak-acceleration amplitude - Frequency range Non-stationary vibration including shock: - Shock-response spectrum type L, peak acceleration - Shock-response spectrum type II, peak acceleration rack with EMC protection. 3.3 - Dimensions Standard 19 and weight Back and front access by locked doors. specifications TC rack Width (mm) Total height (mm) Useful height (U) Depth (mm) Max. weight (kg)
File A70457A1.doc V7 Reference 8BL 00704 0057 DRZZA Edition 01 Status Released

Unit C C % % g/m g/m kPa kPa mg/m mg/m mg/(mh)

Oper.-1-3 class 3.1 +5 +40 5 85 1 25 70 106 30 0.2 1.5

Stor.-1-1 class 1.1 -5 +45 5 95 1 29 70 106 30 0.2 1.5

mm m/s Hz
2

0.3 1

1.5 5

2 to 9 9 to 2 to 9 9 to 200 200

m/s

40

40

m/s

---

---

600 2000 40 600 250 (fully equipped)


Date 00/03/22 Page 12/30

Alcatel

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 3: General specifications of product

3.4 - Consumption specifications


Per rack, fully equipped. Maximum power consumption Consumption under -38,4VDC (-48VDC voltage) Consumption under -48VDC (-60VDC voltage) Maximum power dissipation 2500 W 65A 52A 2500 W

3.5 - Clearance recommendations


Sufficient clearance must be allowed for handling, maintenance and inspection procedures, and for equipment cooling purposes. In particular, there must be sufficient clearance at the front and at the rear to allow the handling (approximately 1000 mm). At top: 250 mm minimum If the unit is installed in an enclosed space, such as a cabinet, a technical closure, etc., sufficient space must be allowed for circulation of the air.

3.6 - Lightning and The lightning protections on external interfaces are not implemented in the over voltage A925TC protection on equipment specifications
Not necessary. DC lightning protection If necessary, must be installed at the DDF by Customer. PCM lightning protection

3.7 - X21 interface These link is applicable if the A925TC and the OMC-R are co-located.
X21 link, length of cable from A925TC to OMC-R max. 30m

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 13/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 3: General specifications of product

3.8 - 2 Mbit/s connection specifications


On TC , PCM lines are: - 120 Ohms : 8 pairs arranged as four twisted quad from copper line L907 type. 75 Ohms: 8 coaxs from coaxial cable FLEX3 type. On DDF side these cables can be inserted on terminal block (120 or 75 Ohms). 120 Ohms: The distance from TC to NTL is depending on selected cable and NTL type. Generally, with G.703 Abis interface, with 40 dB sensitivity, the maximal distance is 250 m for L907 . Recommended distance between DDF and A925TC = 20m. Nber of Ater-mux interfaces = nber of MT120 boards. Nber of A interfaces = 4 x nber of MT120 boards . Rack fully equipped Maximum capacity : A links Maximum capacity : Atermux links 192 48

8 pairs or 8 coaxs, Specification of 2 Mbit/s cable Network impedance L 907 / 8 pairs / 4 twisted quads 120 Ohms Core: copper = Diam. 0,5 mm Jacket = Diam. 7.8 mm FLEX3 / 8 coax Core and drain : copper = Diam. 0,4 mm 75 Ohms Insulation = Diam. 2 mm Sheath = Diam. 3,55 mm Jacket = Diam. 16.1 mm Number of multi PCM cables 2 Mbit/s cable type L907 / 8 pairs FLEX 3 / 8 coaxs Nber of cable, per subrack 16 16 16 x 4 = 64 16 x 4 = 64 Nber of cable, per rack Inserting Inserting Type of cable Connection DDF side recommended

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 14/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 4: Site preparation and supply requirements for the Customer or the Operator

4. Site preparation and supply requirements for Customer or Operator


This chapter describes the requirements of product about site preparation and supplies provided by Customer or Operator. 4.1 - Site safety requirements 4.2 - Main supplies provided by Customer 4.3 - Site infrastructure requirements 4.4 - Cable way requirements 4.5 - Computer requirements 4.6 X21 connection requirements 4.7 X25 switch requirements 4.8 - Power system requirements 4.9 - Leased line requirements 4.10 - DDF requirements 4.11 - Site information requirements

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 15/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 4: Site preparation and supply requirements for Customer or Operator

4.1 - Site safety requirements


Compliant with IEC 950 (EN60950) for equipment located only in restricted access locations. On the site, the current safety instructions must be strictly followed and hazardous points must be marked. The inspectors must make sure that signs are posted with the telephone number of emergency medical assistance in the event of electric shock. Displacement of equipment (transport, handling, or hoisting) must not endanger either personnel or equipment near-by. A smoke detector and a fire extinguisher system are recommended. A fire detection system is recommended for indoor sites. Failing this, a CO2 fire extinguisher must be present and clearly marked in the room where the equipment is to be installed.

4.2 - Main supplies provided by Customer or Operator

See chapter 1: Customer or Operator Services:

Main supplies (all-in-One Service: Environment)

Main supplies (all-in-One Service: Cable)

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 16/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 4: Site preparation and supply requirements for Customer or Operator

The site shall be handed over with the leased lines in operation.

4.3 - Site infrastructure requirements


Accessibility The client shall provide the site (in which the equipment is to be installed) with hoisting and handling devices to ease delivery of the equipment . If not, the costs incurred by the installer will be added to the installation costs and charged to the client. The entrances to the buildings must be large enough to transport the racks in an upright position (see: Dimensions and weight specifications) Access to the sites must be facilitated: - either by the presence of a local correspondent during delivery, assembly/wiring, and initial start-up of the equipment, - or by obtaining a set of duplicate keys to the sites prior to those operations. Service facilities A set of furniture is provided, in sufficient quantity, as part of preparation of the room: at least 1 table and 2 chairs, (work space for the operating terminals). One or two phone lines are needed for the periods of installation and initial start-up of the equipments. Ceiling The ceiling height must be greater than or equal to 2.5 m. Floor The floor must be able to bear a load of 500 kg/m2. It must be able to withstand a momentary load of 250 kg/100cm and puncture-resistant to 30 kg/cm2. The floor must be level and smooth. The difference in level must be lower than or equal to 0.5 cm/m. The rack and his extension are fixed and stand on adjustable lifting screws. Distance constraints Various clearance spaces must be provided for maintenance and inspection operations and equipment ventilation. High voltage protector The external ports of the equipment (power supply, lines, etc.) should be protected
File A70457A1.doc V7 Reference 8BL 00704 0057 DRZZA Edition 01 Status Released Date 00/03/22 Page 17/30

Alcatel

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 4: Site preparation and supply requirements for Customer or Operator

Environment of the equipment Cable are fed in through the top or the botom of the rack. The cables from DC distribution box to TC equipment should not exceed 20 meters with 16mm power cable and 40 meters with 35mm power cable. The cables from DDF to TC equipment must not exceed 20m Lighting and wall sockets The lighting in the room must have an intensity of 300 Lux at 1 m above the floor. No more than 500 Lux. The lamps should be of the electronic ballast type. A "home-purpose" wall socket network must be provided with the room (one socket about every 3 m; 2 poles and ground, 16 A). Sockets providing a 220 V emergency backup source must be provided for the operating equipment (LMT, switch X25).
2 2

4.4 - Cable way requirements


A cable way (cable tray or wire mesh) should be installed at a height of a least 250mm above top of rack to support the cables. A cable way (with width 508 mm) from A925TC to DDF and power distribution box should be provided. This cable way can be reserved for one TC rack and should be separated in two parts: power cables (width 108 mm) and 2 Mbit/s cables (width 400 mm). Two holes should be foreseen inside cable ways: - for 2 Mbit/s cables (l:600 mm x d:60 mm) centred on the rear of racktop. - for power cables (l:100 mm x d:40 mm) centred on the right side racktop. When using existing cable trays, various electrical systems (power, signals) should be kept apart. If no partitioning is possible, a new cable tray will be installed along the former at a 30 cm space to avoid interference. One wire braid (earth shielding) 16 mm per rack with side rack a lug D 6mm should be provided. (length depending of height of cable way).

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 18/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 4: Site preparation and supply requirements for Customer or Operator

4.5 - Computer LMT computer (labtop) is optional, but necessary during the installation. Length of requirements cables from A925TC to LMT terminal shall not exceed 15 meters.
Dimensions (mm): (Width x Depth x Height) ; 300 x 300 x 400 Maximum weight (kg): < 5 kg Maximum power cosumption: 110-220VAC / 50Hz ; 100W Gauge (A): earth leakage protection 30mA, 6A. Clearance: Side clearance = 0,7 m (only one side is necessary) Front clearance = 1 m Rear clearance = 0,2 m

4.6 - X21 If OMC-R collocated connection requirements Depending of the number of BSC connected to the A925TC.
Signal type X21 Number 2 per BSC Length max. 30 m

4.7 X25 switch If more than one BSC are connected to the A925TC, the use of a X25 switch is requirements mandatory for OMC-R connection. Length of cables from A925TC to X25 switch
shall not exceed 30 meters. X25 switch recommended: 36110- 20 MainStreet Maximum number of ports: from 2 to 20 lines Dimensions (mm): (Width x Depth x Height) ; 440 x 340 x 140 Rack- mountable option available - For 19 inchs rack mounting: 3 units Maximum weight (kg): 9 to 12 kg Maximum power cosumption: 110-240VAC / 50-60Hz ; < 100W Gauge (A): earth leakage protection 30mA, 6A. Operating environment: 5 to 40 C; 20% to 80% relative humidity, non condensing. Clearance: Side clearance = 0,7 m (only one side is necessary) Front clearance = 1 m Rear clearance = 0,7 m Safety standards compliance: EN 60950; UL 950; CSA 950. EMC standards compliance: EN 50022-B; EN 50082-A; FCC Class A Part 15.

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 19/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 4: Site preparation and supply requirements for Customer or Operator

4.8 - Power system The customer shall install all cables at the position of first rack. requirements
Power supply system The TC power plant should include standard backup batteries for emergency power. The TC can be powered either -48VDC or -60VDC nominal voltages: -48VDC, nominal range: -38,4VDC to 57,6VDC -60VDC, nominal range: -48VDC to 72VDC

Each TC rack must operate with two - 48V/60V (BAT A/BAT B) wires with redundancy between the two and one 0V (BATRET) wire. A power distributing box must be provided as part of the room preparations. It must include marked fuses for each output, and a grounding bus bar for the power cables. The box or power station must be marked. Power cable recommended Lugs are necessary at cable end on TC side. Double sheathing. Multi strand flexible copper core. Strand composition 0,41 mm max. class 5 (IEC 60 228) . Cable type to be compliant with local legislation and standard for electrical installation in technical site. 4 cables per TC rack are necessary : Signal 48 or 60 V DC, A 48 or 60 V DC, B 0V DC Ground Section of cable for one TC rack 16 mm / 35 mm 16 mm / 35 mm 16 mm / 35 mm 16 mm / 35 mm 20 m / 40 m 20 m / 40 m 20 m / 40 m 20 m / 40 m Length

Distribution box The distribution should be define for using lugs of system 8 mm for BAT RET (0V), 8 mm for BAT A / BAT B (-48/60V), 8 mm for electrical earth.

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 20/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 4: Site preparation and supply requirements for Customer or Operator

Breakers recommendations The customer provides the following gauges (with lightning protection if necessary): - The gauges should be calculated to operate with ETS300132-2 standard (-40,5VDC). - The gauges are only on BAT A and BAT B wires. - On first approach, the gauge is calculated like: I max. + 1/3 I max. (Imax at 38,4VDC or 48VDC) It is wished to put the gauge in agreement with the final A925TC configuration to avoid an interruption of service during an extension. Gauges estimated with standard values Number of fuses per A925TC Gauge (A) for each rack fully equipped 2 (BAT A and BAT B) 48VDC voltage 60VDC voltage 80 A 63A

Grounding distribution A ground plate directly connected to the ground box of the building must be available in the room. The grounding system is composed of a metallic grounding network, formed of iron flooring .The grounds are respectively connected to grounding plate, and to the metallic ground of the power distributing box. The ground wire circuit resistance must be less than 3 Ohms

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 21/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 4: Site preparation and supply requirements for Customer or Operator

4.9 - Leased line The following shall also be handed over: requirements
a diagram of the distribution frame, identifying the lines, a wiring diagram, the technical and commercial references of each line, the lines connected to the line terminal blocks, the looped Tx/Rx lines on the cable side in the GSM room, the quality tested lines of the local GSM distribution frame to the remote GSM distribution frame.

4.10 - DDF requirements


The Digital Distribution Frame should have terminal blocks for inserting cable: - L907 for 120 Ohms - Flex 3 for 75 Ohms copper, D : 0,5 mm copper, D : 0,4 mm

The equipment terminal block must be remote of customer terminal block (DDF) at maximum 1m. The customer must indicate to Alcatel the connector type equipment terminal block (only for 2Mbit/s cables 75 Ohms). The pins of terminal block to wrap, 120 Ohms supplied by the customer must have a diameter between 1 and 1,5 mm The DDF should be foreseen for one A925TC rack (each rack has 192 A and 48 Ater-mux links: 64 terminal blocks 10 pairs)

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 22/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 4: Site preparation and supply requirements for Customer or Operator

4.11 - Site The customer shall produce an overall drawing for each unit site. information requirements
General site information The drawing shall be submitted to Alcatel, after the initial requirements site inspection, or in preliminary project documentation concerning the site supplied by the customer. The drawing shall indicate the position of the unit with its connections, relative to a reference point. The GSM site data sheet must be completed based on data provided by the client or during site inspection. The GSM site information procedure document (see document SPG-07) should be completed by the customer or during a site inspection visit with Alcatel. PCM site information The operator shall hand over to the constructor, with the requirements preliminary study document or on the occasion of the site inspection: A drawing of the distribution frame locating the links with technical and commercial numbers of each link. The links with transmit/receive loops set up on the cable side at the unit.. Links qualified as far as the unit. Layout The client shall draw up a layout map for each site. That map will indicate the location of: - racks, - power supplies, - air-conditioning system, - cable ways, - collector rod system, - grounding plate, - distribution frame (positioning of the terminal blocks), - furniture for the operating and maintenance tools. That plan is submitted to the manufacturer, either after an initial inspection of the site or in a preliminary project file for the site provided by the client.

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 23/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 5: Installation and supply requirements for Alcatel

5. Installation and supply requirements for Alcatel


This chapter describes the requirements about installation and supplies provided by Alcatel. 5.1 - Installation 5.2 - Supplies

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 24/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Chapter 5: Installation and supply requirements for Alcatel

5.1 - Installation The main services are as follows:


Fitting of A925TC system The services provided are: Preliminary preparation. Rack installation. Power supply cables installation. PCM cables installation. X21 connection cables installation. Finishing installation.

and are detailed in ALCATEL documents: A925TC / Installation manual: 3BK 17251 0001 RJZZA Commissioning of A925TC A925TC powering up and running in accordance with system ALCATEL documents: Commissioning manual: 3BK 17251 0002 RJZZA Acceptance of A925TC system Customer agrees that A925TC has been installed, commissioned and is running in accordance with ALCATEL documents: Acceptance manual: 3BK 17251 0004 RJZZA

5.2 - Supplies Alcatel provides:


Mandatory Installation kit to install A925TC system. Optional 2 Mbit/s cables X21 cables DDF Power cables

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 25/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Appendix A: Installation help: Site cabling raised floor configuration with 1 A925 TC rack, 1 power supply, 1 DDF, 1 PC tool, 1 ground plate

Appendix A: Installation help: Site cabling raised floor configuration with 1 A925 TC rack, 1 power supply, 1 DDF, 1 PC tool, 1 ground plate
220V
AC Box

Power cables

Wire braid

TX- Ater

RX- Ater

Equipment DDF

Alcatel

File A70457A1.doc V7

Customer DDF

Reference 8BL 00704 0057 DRZZA

RX- A

TX- A

Edition 01

Status Released

LMT

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

2000 mm (40U)

Ground Plate

Bat Ret Bat A Bat B

Date 00/03/22

Page 26/30

SPP-43, A925 Transcoder Appendix A: Installation help: Site cabling raised floor configuration with 1 A925 TC rack, 1 power supply, 1 DDF, 1 PC tool, 1 ground plate

Clearance

AC Box

Ground Plate

Power

1000 mm

Length of cables : 15 m

1000 mm

600 mm

TC1

Equipment DDF

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Customer DDF
Status Released

LMT

Date 00/03/22

Page 27/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Appendix B: Installation help: Site cabling cable tray configuration with 2 x A925 TC racks, 2 power distribution box, 2 DDF, 1 PC tool, 1 OMC-R, X25 switch, 1 ground plate

Appendix B. Installation help: Site cabling cable tray configuration with 2 x A925 TC racks, 2 power distribution box, 2 DDF, 1 PC tool, 1 OMC-R, X25 switch, 1 ground plate
DC BOX 48V/60V

DC BOX 48V/60V

Wire braid

Ground Plate

TC1

TC2

TC1 TC2

TC2

X25 SWITCH

Equipment DDF

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Customer DDF

Edition 01

Status Released

TC1

LMT

Date 00/03/22

Page 28/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

SPP-43, A925 Transcoder Appendix B: Installation help: Site cabling cable tray configuration with 2 x A925 TC racks, 2 power distribution box, 2 DDF, 1 PC tool, 1 OMC-R, X25 switch, 1 ground plate

Clearance

Ground Plate

DC Box TC1

DC Box TC2

Length of cables : 15 m

1000 mm

600 mm

LMT

600 mm

1000 mm

TC2

< 25 m

OMC-R

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Customer DDF

Status Released

Date 00/03/22

X25 SWITCH

TC1

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

Equipment DDF

Page 29/30

SPP-43, A925 Transcoder Abbreviations

Abbreviations
Sigle AC BSC BSS DC DDF GSM MSC MFS NTL OMC-R PCM PE RCD TC U Alternative Current Base Station Controller Base Station System Direct Current Digital Distribution Frame Global System for Mobile communication Mobile Service Switching Center (GSM) Multi-BSS Fast packet Server Network Termination Line Operation and Maintenance Center - Radio Pulse Code Modulation Protective Earth Residual Current operated circuit Disrupter TransCoder Standard Unit 1U = 44,45mm Description

END OF DOCUMENT

Alcatel

File A70457A1.doc V7

Reference 8BL 00704 0057 DRZZA

Edition 01

Status Released

Date 00/03/22

Page 30/30

All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel

Potrebbero piacerti anche