Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Operation step:
There are not effect with normal work when upgrade SMC, if upgrade interface slot, will effect single interface slot itself at short time, other interfaces slot will work in normal. Concrete upgrade flow is below: In this testing , interface slot 7 is primary slot, interface slot 8 is secondary slot).
Raisecom#write Saving current configuration.. Save current configuration successfully Raisecom# show running-config all
Raisecom#download system-boot ftp 3.3.3.3 raisecom raisecom filename slot 8 Waiting.......Start 17 Getting source file from server ...Done Transmitting file to device...Size 3206K / 3206K Success!
6, reboot SMC slot 8
Raisecom#show version slot 8 Raisecom(fttx)#nms forced-switch Raisecom(fttx)#nms forced-switch Are you sure to switch now?[yes]:yes Set successfully
11,SMC slot 7 synchronization finished and check version, then to do forced switch to slot 8
Raisecom#show version slot 7 Raisecom(fttx)#nms forced-switch Raisecom(fttx)#nms forced-switch Are you sure to switch now?[yes]:yes Set successfully Raisecom(fttx)#
12, checkout configuration in slot 7
download system-boot ftp 3.3.3.3 raisecom raisecom filename slot all card-type 2pon Image file name:filename Card type iscom5800-2pon List of Cards to be upgraded sorted by SLOT ID: Card 1 Card2 Card3 Card4 Do you really want to upgrade software of above Cards[yes/no]:yes Waiting.......Start Getting source file from server ...Done Transmitting file to device...Size 3206K / 3206K
Success!