LOCALIDAD:
MIGUEL ALEMAN
MUNICIPIO:
TAMAULIPAS
335.24 L.P.S.
2.47
GENERAL A TRATAMIENTO
Dimetro nominal
Area en m
A-7
(A)
OBRA:
CONDUCCION:
Gasto mx.
Velocidad en
Long. Lnea
inst. en
m/seg
en m
( Q )
CALCULO:
REVISO:
ING. M.O.R.
ING. FELIPE ESPINOSA V.
FECHA:
FECHA:
Coef. de
Constante
Prdidas/
% Hf
DT
Ht = DT + hf
friccin (n)
Manning
friccin (m)
Otras
Desnv. Topo.
hf = Hf+%Hf
DICIEMBRE DE 1999
DICIEMBRE DE 1999
76
Q * Ht
=
=
Q Ht
HP=
en %
76
Tipo
mm.
Pulg.
m3/seg (Q)
(V)
(L)
Manning
(K)
Hf= L Q K
prdidas
(m)
(m)
(Q en l.p.s.)
A-C
0.61
610
24.0
0.292247
0.8279
2.83
1,790.00
0.685
0.0100
0.014379533
17.64
0.88
10.00
28.52
23,614.72
53.20
70%
A-C
0.76
760
29.9
0.453646
0.8279
1.82
1,790.00
0.685
0.0100
0.0044514
5.46
0.27
10.00
15.73
13,026.35
53.20
244.86
A-C
0.91
910
35.8
0.650388
0.8279
1.27
1,790.00
0.685
0.0100
1.703E-03
2.09
0.10
10.00
12.19
10,095.45
53.20
189.76
443.89
GOLPE DE ARIETE
Presin de trabajo
Dimetro
Espesor
de la tubera
Nom.
pared de
V en
145 V
Ea d
Et e
Ea d
----
Ea d
1+ ------------
Ea d
1+-----
Sobrepresin
Kg/cm
(d) cm.
tubo (e)
m/seg
(1)
(2)
(3)
Et e
Et e
Et e
Sobrepresin
145 V
h=
Ea d
1+----Et e
en cm.
en (m)
Carga
Presin total
absorvida
absorvida
Normal de
20% h + Carga
por vlvula
por tubera
Operacin
Normal
R.P.= 80% h
20% h
en (m)
de operacin
15.8
61.00
6.10
2.83
410.76
1,260,870
2,000,800
0.63
1.63
1.28
321.72
257.37
64.34
28.52
92.87
15.8
76.00
7.60
1.82
264.62
1,570,920
2,492,800
0.63
1.63
1.28
207.26
165.80
41.45
15.73
57.19
15.8
91.00
9.10
1.27
184.57
1,880,970
2,984,800
0.63
1.63
1.28
144.56
115.65
28.91
12.19
41.11
Mat I
0%
Mat II
100%
Mat III
0%
Et = Mdulo de Elasticidad del Material del Tubo (Asbesto Cemento = 328,000 kg/cm ; Acero = 2 100,000 kg/cm )
Et = Mdulo de Elasticidad del Material del Tubo (Concreto Reforzado = 221,359 kg/cm2; P.V.C. = 29,300 Kg/cm2)
1.35
Dimetro:
C O N C E P T O
Clase:
610.0
Profundidad =
1.65
Ancho =
mm; pulg=
24.02
Dimetro:
A-7
1.55
760.0
Clase:
P.U.
Importe $
Profundidad =
1.85
Ancho =
1.75
mm; pulg=
29.92
Dimetro:
910.0
mm; pulg=
35.83
Unidad
P.U.
Importe $
A-7
Cantidad
Clase:
Unidad
P.U.
Importe $
Profundidad =
2.10
A-7
Cantidad
Unidad
Cantidad
0.00
m3
0.00
0.00
m3
0.00
0.00
m3
0.00
0.00
3987.23
m3
15.96
63,636.11
5133
m3
15.96
81,919.89
6578
m3
15.96
104,988.87
0.00
m3
142.40
0.00
m3
142.40
0.00
m3
142.40
0.00
Plantilla apisonada
241.65
m3
49.00
11,840.85
277
m3
49.00
13,595.05
313
m3
49.00
15,349.25
1790.00
40.05
71,689.50
1790
59.58
106,648.20
1790
62.81
112,429.90
Relleno compactado
3464.10
m3
43.81
151,762.37
4043
m3
43.81
177,139.11
5414
m3
43.81
237,189.75
Relleno a volteo
0.00
m3
5.20
0.00
m3
5.20
0.00
m3
5.20
0.00
0.03
m3
769.68
20.78
0.03
m3
769.68
20.78
0.03
m3
769.68
20.78
1790.00
1412.06
2,527,587.40
1790
1982.30
3,548,317.00
1790
2834.50
5,073,755.00
Costo tubera
2,826,537.02
3,927,640.02
5,543,733.55
R E S U M E N
Presin de
Dimetro Nominal
H.P.
trabajo tubera
K.W.h.
Cargo anual de
Costo total de
bombeo ( en $ )
conduccin ( m.l. )
bombeo ( en $ )
4
24.02
443.89
331.01
104.93
919175.82
2,826,537
760.0
29.92
244.86
182.59
57.88
507035.96
3,927,640
910.0
35.83
0.317
189.76
141.51
0.7457
44.86
392953.86
5,543,734
* anualidad
5
( Kg/cm )
mm.
Pulgs.
15.8
610.0
15.8
15.8
Costo del K.W.h. =
05/99
NOTA: El dimetro ms econmico est dado por el menor costo determinado en la columna
* 0.12
8760
para operacin de
15
20
365 das
604,545.73
1,523,721.55
840,051.97
1,347,087.94
1,185,705.48
7
= 4
1,578,659.34
EL DIAMETRO DE LA TUBERIA QUE ACTUALMENTE TIENE, ES DE 14" CON UN EQUIPO DE 3 BOMBAS DE 20 H.P.; LA POTENCIA QUE RESULTA NECESARIA DE ACUERDO AL ANALISIS, ES DE 250 H.P. REQUIRIENDO 3 EQUIPOS D
100
EQUIPO ACTUAL. EL EMISOR ACTUAL TIENE UN DIAMETRO DE 14 " Y EL CALCULADO ES DE 30 " , POR LO QUE SE RECOMIENDA UNA LINEA PARALELA DE 16" PARA COMPLEMENTAR EL GASTO.
1 DE 1
9/25/2007