SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005)

Rev 2 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Equipment Installation - Alignment & Elevation Check (Vertical & Horizontal Vessels)
PROJECT TITLE

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-D-2007
WBS / BI / JO NUMBER

1-Dec-06

MECH-

CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL

EQUIPMENT DESCRIPTION REV. NO. PURCHASE ORDER NUMBER

EQPT CODE

SYSTEM ID.

PLANT NO.

EC / PMCC / MCC NO. QUANTITY INSP. MH's SPENT TRAVEL TIME

ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL

SAUDI ARAMCO USE ONLY


WORK PERMIT REQUIRED?

ITEM No. A.

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

GENERAL REQUIREMENTS: See Note 1 & Attachment 1 (Use PIPs) Vessel location and foundation were verified to conform with the coordinates and elevation in the plan drawing. Alignment of flange face of nozzles shall be within 1/2 degree of the specified plane. (PIP-VEFV1100/1102, Page 1, Note 7) Bolt holes are within 1/8" of the specified location. (PIP-VEFV1100/1102, Page 1, Note 28) VERTICAL VESSELS Vertical centerlines and base line of vertical vessel are punched and circled with paint. (VEFV1100/1102Page 1, Note 25) Orientation line for vertical vessels is based on a directional centerline (e.g.;North, South, etc.) and as referenced on the construction drawings. (VEFV1100/1102, Page 2) Distance of bottom of base support to the base line of vertical vessel shall be within the tolerance of +0 , -1/32" per foot of vessel diameter to a maximum of 1/2". (PIP-VEFV1100/1102, Pg 1, Note 12) Supports are level or are with in the following tolerances: + 1/8" or + 0.02" per foot of vessel diameter, but not to exceed 3/8". (PIP-VEFV1100/1102 Page 1, Note 26) Supports located are within the following tolerances: +0", -1/32" per foot of vessel diameter with max of 1/2". (VEFV1100/1102 Page 1, Note 13) HORIZONTAL VESSELS Orientation line for horizontal vessels is based on the vertical centerline. (PIP-VEFV1100/1102, Page 2) Centerlines (orientation lines) are punch marked and circled with paint. (PIP-VEFV1100/1102, Page 1, Note 25) Supports of horizontal vessel are located within the tolerance of +0", + 1/8" from the horizontal centerlines. (PIP-VEFV1100/1102, Page 1, Note 22) Supports are level or are with in the following tolerances: + 1/8" or + 0.02" per foot of vessel diameter, but not to exceed 3/8". (PIP-VEFV1100/1102, Page 1, Note 26) SAES-D-001, Par. 3.2 SAES-D-001, Par. 3.2 SAES-D-001, Par. 3.2 SAES-D-001, Par. 3.2 SAES-D-001, Par. 3.2

A1

IFC Drawings SAES-D-001, Par. 3.2 SAES-D-001, Par. 3.2

A2

A3

B.

B1

B2

B3

SAES-D-001, Par. 3.2

B4

SAES-D-001, Par. 3.2

B5

SAES-D-001, Par. 3.2

C.

C1

C2

C3

C4

SAES-D-001, Par. 3.2

Page 1 of 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005)

Rev 2 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Equipment Alignment & Elevation Check
PROJECT TITLE

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-D-2007
WBS / BI / JO NUMBER

1-Dec-06

MECH-

CONTRACTOR / SUBCONTRACTOR

ITEM No. REMARKS:

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

NOTES: Use PIPs during Equipment Alignment & Elevation Checks in the field. See Attachment 1. Use PIP VEFV1100. ATTACHMENTS: ATTACHMENT 1 - VEFV1102 - Vessel Tolerances (Elevation) REFERENCE DOCUMENTS: 1- SAES-D-001 -- Design Criteria for Pressure Vessels, 31 December 2001 2- VEFV1100/1102 -- Process Industry Practices (Fabrication/Installation Details), 21 April 1999

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Y = YES

N = NO F = FAILED

Page 2 of 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 2 (Standards Cutoff - December 2005)

REV 2 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Equipment Alignment & Elevation Check

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-D-2007

1-Dec-06

MECH-

ATTACHMENT 1 - VEFV1102 - Vessel Tolerances (Elevation)