Sei sulla pagina 1di 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005)

Rev 2 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Storage, Handling and Preservation (Vessels & Tanks)
PROJECT TITLE

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-D-2005
WBS / BI / JO NUMBER

1-Dec-06

MECH-

CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL

EQUIPMENT DESCRIPTION REV. NO. PURCHASE ORDER NUMBER

EQPT CODE

SYSTEM ID.

PLANT NO.

EC / PMCC / MCC NO. QUANTITY INSP. MH's SPENT TRAVEL TIME

ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL

SAUDI ARAMCO USE ONLY


WORK PERMIT REQUIRED?

ITEM No. A

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

General Requirements (Vessels) Use the latest Revision of 32-SAMSS-004 along with this checklist Equipment storage, handling and preservation procedure was submitted and approved by S.Aramco . Vessels that were not externally coated at the fabrication shop are provided with a hard temporary preservative in accordance with MIL C16173, Grade I, which can be removed at site prior to surface preparation & application of Saudi Aramco coating & paint system. Vessel is coated with a complete external coating system per the Saudi Aramco paints and coating system Stainless Steel vessels, which were shipped via ocean freight, are protected using a temporary protective system compatible with stainless steel & suitable outdoor exposure per MIL C16173 Gr. IV. Vessels that are partially shop fabricated and/or likely to suffer from distortion have the following protection: a) Adequate* bracing b) All open ends are covered to prevent ingress of dirt and other foreign matters. The internal of vessel is completely and thoroughly dried and cleaned from all loose scales, weld slag, dirt and debris. The interior surfaces of vessels, including internals, shall be protected from corrosion by use of a nontoxic vapor phase corrosion inhibitor such as COTEC VCI-309 or 307 or equivalent, (depending on the vessel metallurgy) applied at a rate of 0.1 kg/m. Vessels internally protected by corrosion inhibitor are sealed vapor tight using metallic covers. Austenitic Stainless Steels & vessels internally cladded or weldoverlayed with Austenitic Stainless Steels are internally protected by nitrogen blanketing at a pressure of 35 Kpa (5 psi) during/when: a) Ocean shipment. b) Where vessel is not undergoing fabrication, construction activities, after hydrotesting or prior to commissioning. Threaded nozzle connections shall be protected with threaded plugs. Telltale holes in reinforcing pads shall be protected with wooden plugs or packed with rust preventative grease (Denso paste, etc). Vessels waiting for installation have the flanged connections and all other machined surfaces protected by a coating such as MIL C16173 Grade IV, which is easily removed in the field and fitted with steel or wood cover, 3 mm thick and neoprene gaskets. Flanges with permanent blind flanges or covers shall be secured with the gaskets and bolting specified for service. Sch Q, Att IV Sec. 4 & 5 32-SAMSS-004 Par. 19.3.1 (a) 32-SAMSS-004 Par. 19.3.1 (b) 32-SAMSS-004 Par. 19.3.1(c)

A1

A2

A3

A4

A5

32-SAMSS-004 Par. 19.1.4

A6

32-SAMSS-004 Par. 19.1.2 32-SAMSS-004 Par. 19.2.1 32-SAMSS-004 Par. 19.2.3

A7

A8

A9

32-SAMSS-004 Par. 19.2.5

A10 A11

32-SAMSS-004 Par. 19.3.2 32-SAMSS-004 Par. 19.3.2 32-SAMSS-004 Par. 19.3.3 32-SAMSS-004 Par. 19.3.5

A12

A13

Page 1 of 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005)

Rev 2 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Storage, Handling and Preservation (Vessels & Tanks)
PROJECT TITLE

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-D-2005
WBS / BI / JO NUMBER

1-Dec-06

MECH-

CONTRACTOR / SUBCONTRACTOR

ITEM No. B B1 C C1

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

General Requirements (Small SAES-D-109 Tanks) Use latest Revision of 32-SAMSS-030 along with this checklist Handling & Preservation met Attachment 1 Requirements 32-SAMSS-004

General Requirements (API Tanks) Develop a Preservation Plan acceptable to Company. This may even involve Nitrogen Blanket as specified by Design. Follow API Recommended Practices where none exist. To be determined from applicable API Standards API Stds

REMARKS:

NOTES: Use this checklist to also inspect Small Tanks REFERENCE DOCUMENTS: ATTACHMENT 1 - 32-SAMSS-030 Tank Reqmts

REFERENCE DOCUMENTS: ATTACHMENT 1 - 32-SAMSS-030 Tank Reqmts 1- 32-SAMSS-004 -- Manufacture of Pressure Vessels, 30 March 2005

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Y = YES

N = NO F = FAILED

Page 2 of 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 2 (Standards Cutoff - December 2005)

REV 2 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Storage, Handling and Preservation (Vessels & Tanks)

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-D-2005

1-Dec-06

MECH-

ATTACHMENT 1 - 32-SAMSS-030 Small Tank Reqmts

Potrebbero piacerti anche