Title VMTC Coordinator Client representative Architect Organization Value consultants (pvt)ltd. Provincial council, Sabaragamuwa province Design, project management and consulting division, Urban Development Authority Structural engineer Design, project management and consulting division, Urban Development Authority Quantity Surveyor Deputy Chief Secretary (Engineering Services) Sabaragamuwa Provincial Council, New Town, Ratnapura Services engineer/Secretary Design, project management and consulting division, Urban Development Authority

PROJECT BRIEF
Project name Client Design consultant :::Proposed Construction of Shopping Complex and Pola at Ratnapura Provincial council, Sabaragamuwa province Design, project management and consulting division, Urban Development Authority Cost consultants :Deputy Chief Secretary (Engineering Services) Sabaragamuwa Provincial Council, New Town, Ratnapura

Site details

: - Site is situated in Rathnapura town, in the existing pola area. Near Pothugal Vihara Mawatha. Approximate area of land is 2500m2

Building details

: - This building is a stepped building of three storied with a basement. The floor areas are as follows. 01. Basement floor area - 2350 sq.m (approx;)-Proposed Parking area and toilets 02. Ground floor area - 2220.00 sq.m(approx;)-Shop and Pola 03. First floor area - 625.00 sq.m(approx;)-Common hall

Duration

:-

12 months

PROJECT REQUIREMENTS AND CONSTARINTS


Requirements Fundamental requirements which the project must possess to serve the clients basic intentions were reviewed under project requirements. The basic requirement of this project is to solve the problems in existing pola area and increase welfare of the vendors and consumers. Constraints Constraints are those factors which will impose a discipline upon the design. The constraints of the project were identified as follow. UDA regulations Have to building within existing pola area Budget is limited since this is a publicly funded project

BOQ SUMMARY
B D F G H J K P Q S T V W X PRELIMINARIES EXCAVATION AND EARTHWORK CONCRETE WORK MASONRY WORK WATER PROOFING STRUCTUREL METAL WORK METAL WORK ROOF STRUCTURE/ROOF COVERING PLUMBING /SANITARY INSTALLATION ELECTRICAL INSTALLATION FLOOR/WALL/CEILING FINISHES PAINTING GENERAL ITEMS EXTERNAL DRAINAGE SYSTEM Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.

695,000.00 4,082,278.59 46,832,241.01 4,882,825.50 755,000.00 7,667,196.00 6,475,420.00 10,021,313.50 987,447.08 1,311,475.46 15,168,785.60 3,478,996.79 10,650,000.00 686,448.01

SUB TOTAL Discounts/Additions if any GRAND TOTAL

Rs. Rs. Rs.

122,694,427.54

IN WORDS RUPEES :.... .. Signature of Contractor Witness : Address : Date : 1 . 2.. . .. . ..