Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
No.
Process/Location:
Work Activities
Tennis Court
Tennis
40
Process/Location: Tennis
Jan 2013
1a.
2. Risk Evaluation 1d. 2a. Existing Risk Control (if any) The fences are checked regularly for damaged areas. Activate maintenance team to repair if the fence is found to be damaged. 2b. Seve -rity 2 2c. Likeli -hood 2 2d. Risk Level 4
No.
Hazard
Possible Accident / Ill Health & Persons-at-Risk Students, academic staff & players personal injury
3. Risk Control 3a. 3b. Follow up by (name, Additional designation Risk & date) Control Regular checks by facilities staff Technical Officer
Verbal warning given to all observed to be climbing over the low fence. Repeat offenders banned from using facility
Technical Officer
41
1a.
2. Risk Evaluation 1d. 2a. Existing Risk Control (if any) 2b. Seve -rity 2c. Likeli -hood 2d. Risk Level
No.
Hazard
3. Risk Control 3a. 3b. Follow up by (name, Additional designation Risk & date) Control
Tennis balls Users of rolling through pedestrian open gates walkway beside the gates personal injury
Gates to be closed when session in play. Players or facilities staff to close gates if the gates are opened.
Technical Officer
Faulty lighting
Students, academic staff & players - personal injury from slips and falls due to poor lighting
Technical Officer
Students, Ensure that equipment is kept away from academic staff & the field of play to prevent players & players injury referees running and tripping over them. from slips and falls
Technical Officer
Wet court
Student, academic Dry the court with rollers before using the staff & players courts if it is wet. injury from slips and falls
42
1a.
2. Risk Evaluation 1d. 2a. Existing Risk Control (if any) Booking required for usage of facility Users are briefed on rules and regulations Sports facility closes at 7pm on weekdays and during weekends to prevent unauthorized usage Regular inspection by security to ensure no usage when facility is closed 2b. Seve -rity 2 2c. Likeli -hood 2 2d. Risk Level 4
No.
Hazard
3. Risk Control 3a. 3b. Follow up by (name, Additional designation Risk & date) Control Close monitoring by security & facilities staff Security / Technical Officer
Bleeding, cuts
Ensure premises are clutter free before start of game Ensure unused equipment are not in the area of play to prevent players from tripping over them Acad staff to introduce games progressively Recognised coaching methods
43