Condition Monitoring - Class Requirements

IMarEST - CBM Conference, London


Kthe B-James 29 September 2010

DNVs Machinery Survey Arrangements


Optimised for your operation
ibi lity

rea In c

Inc rea se df lex

sed

Machinery CM
(Condition Monitoring)

Machinery Renewal

flex i ibil ty

Machinery PMS
(Planned Maintenance System)

Condition Monitoring - Class Requirements 29 September 2010 Det Norske Veritas AS. All rights reserved.

In c

fle

xib ilit

re a

se d

se d

Inc

rea

fle

xib

(CMS)

ilit y

Machinery Continuous

DNVs CM Arrangements
Machinery CM Applicable for all components on DNVs Machinery list, except diesel engines Turbine CM (Now included in Machinery CM) Applicable for steam propulsion systems;
Main and auxiliary turbines Reduction gears Turbo generators Steam driven pumps

Thruster CM / Water Jet CM Applicable for thrusters for propulsion and DP and water jets

Condition Monitoring - Class Requirements 29 September 2010 Det Norske Veritas AS. All rights reserved. 3

Approval process
Approval of the CM programme shall cover the following:
Maintenance strategy, including business goals Training programme/plan Monitoring methods for components, including baseline Condition monitoring equipment Implementation of condition monitoring in the planned maintenance system Programme for lubricating oil analysis

A company approval will be granted if the above documentation is accepted

Company and vessel approval


Condition Monitoring - Class Requirements 29 September 2010 Det Norske Veritas AS. All rights reserved.

Initial survey onboard

Survey Arrangement CM is granted the vessel

Annual surveys

Possible future for follow-up CM in DNV


Approved Service Suppliers for CM New Rules under development: Condition monitoring as part of the periodical surveys of machinery and equipment can be carried out by a qualified company approved by the Society. This minimizes the requirement to oversee the condition monitoring onboard each individual vessel.
- Guidance note: - For more information, see Standard for Certification No. . / Approval Programme No..: "Service Suppliers Engaged in condition monitoring of machinery. See also DNV Rules.

Condition Monitoring - Class Requirements 29 September 2010 Det Norske Veritas AS. All rights reserved. 5

Safeguarding life, property and the environment


www.dnv.com

Condition Monitoring - Class Requirements 29 September 2010 Det Norske Veritas AS. All rights reserved. 6

Potrebbero piacerti anche