Astute-class submarine

Astute-class submarine

HMS Ambush on sea trials in December 2012

Class overview
Builders: Operators: BAE Systems Submarine Solutions

Royal Navy Preceded by: Cost: Built: In commission: Building: Planned: Completed: Active: Trafalgar class 1,160M each (boats 1-3), 747M each (boats 4-6) 2001present 2010present 4 7 2 2
[1]

General characteristics
Class & type: Displacement: Nuclear-powered fleet submarine 7,000 tonnes, surfaced [2] 7,400 tonnes, submerged 97m (323ft) 11.3m (37ft) 10m (33ft) Rolls-Royce PWR 2 reactor, MTU 600 kilowatt diesel generators Up to 30knots (56km/h), submerged
[3]

Length: Beam: Draught: Propulsion: Speed: Range: Test depth: Complement:

Only limited by food and maintenance requirements. Over 300m 98 (capacity for 109) Thales Sonar 2076 Atlas DESO 25 echosounder 2 x Thales CM010 optronic masts Raytheon Successor IFF

Sensors and processing systems:


Astute-class submarine

Armament:

6 x 21-inch (533mm) torpedo tubes with stowage for up to 38 weapons;


Tomahawk Block IV land-attack cruise missiles [4] Spearfish wire-guided heavyweight torpedoes

The Astute class is the latest class of nuclear-powered fleet submarines in service with the British Royal Navy. The class sets a new standard for the Royal Navy in terms of weapons load, communication facilities and stealth. The boats are being constructed by BAE Systems Submarine Solutions at Barrow-in-Furness.[] Seven boats will be constructed. The first of class, Astute, was launched in 2007 and commissioned in 2010, and the second, Ambush, was launched on 6 January 2011,[] and commissioned on 1 March 2013.[]

Development
The Royal Navy has changed its submarine-employment strategy from the Cold War emphasis on anti-submarine warfare to the concept of "Maritime Contributions to Joint Operations." [] Approval for studies to define the "Batch 2 Trafalgar class" (what would become the Astute class) was given in June1991. In July1994 risk reduction studies were authorised in parallel with the formal bid phase of the project.[5] On 17 March 1997, the Ministry of Defence announced that it would place a 2 billion order for three submarines and that they would be called the Astute class. On 26 March 1997 the contract was signed with GEC-Marconi for the first three boats: Astute, Ambush and Artful. These names were last given to Amphion-class submarines that entered service towards the end of World War II. GEC would build the submarines at its VSEL subsidiary (now BAE Systems Submarine Solutions). Original plans were for seven boats of the Astute class to replace five Swiftsure-class submarines (Sovereign, Superb, Sceptre, Spartan, and Splendid) and the two oldest Trafalgar-class boats (Trafalgar and Turbulent). The Swiftsure class entered service between 1973 and 1977 and were entirely decommissioned by 2010, when only the first of the Astute class was coming into service. Trafalgar was decommissioned in December 2009, to be followed by Turbulent in 2011.[6] An estimated 5,900 people are employed directly as a result of the project; 3,500 BAE Systems staff at Barrow and 2,400 other people around the UK.[] As of August 2006 BAE Systems was negotiating for a contract to build another four Astute-class submarines (hulls four to seven).[7] The fourth boat was ordered on 21 May 2007, to be called Audacious, and the names of the other hulls have been agreed as Agamemnon, Anson, and Ajax.[8] On 15 September 2011 it was announced that hull 5 would now be named Anson.[9] Upon the beginning of sea trials of Astute in November 2009, it was reported that long-lead items for hulls five and six have been ordered, including their nuclear reactor cores, and that the stated intention of the MoD was for a total of seven Astute-class submarines.[10] On 25 March 2010, BAE Systems were given the go-ahead by the government to begin construction on hulls 5 and 6, being given a 300 million contract for the "initial build" of hull five and "long lead procurement activities" for boat six.[11] In the same week the government re-affirmed their commitment to the construction of seven Astute-class submarines. Work on the second and third submarines, Ambush and Artful, proceeded well with major milestones such as the closure of Ambush's reactor compartment, demonstrating significant schedule advance compared with Astute. BAE Systems and the MoD have made efforts to reduce costs and achieved significant cost-cutting and productivity gains.[] A 580 million cost increase was agreed in 2007 due to maturing of the design requiring more materials, inflationary costs, and "some programme throughput assumptions at the Barrow site not being borne out."[5] First-of-class HMS Astute was launched by Camilla, Duchess of Cornwall on 8 June 2007.[] The order of seven Astute-class boats was confirmed in the Strategic Defence and Security Review of October 2010. In December that year it was confirmed by the MoD that "early work" was under way on boats five and six.[12] On 13 October 2011, the fifth boat, Anson, was laid down at Devonshire Dock Hall and is now under construction like boats three and four. On 10 December 2012 the MOD awarded BAE a 1.2 billion contract for work on Audacious. The MOD also confirmed on the same date a further 1.5 billion funding for submarines Anson, Agamemnon and Ajax.[citation needed] The MOD Defence Equipment Plan 2012 refers to 'the completion of the

Astute-class submarine remainder of the seven class of Astute attack submarines'.

Programme delays
BAE Systems issued a profit warning on 11 December 2002 as a result of the cost overruns and delays it was experiencing with the Astute class and also the Nimrod MRA4 maritime reconnaissance/attack aircraft.[13] The delay was caused primarily by the problems of using 3D CAD; Armed Forces Minister Adam Ingram said in 2006 that "due to the complexity of the programme, the benefits that CAD was envisaged to provide were more difficult to realise than either MoD or the contractor had assumed."[14] Other issues were the insufficient capabilities within GEC-Marconi which became evident after contract-award and poor programme management.[][15][16] BAE and the Ministry of Defence reached an agreement in February 2003 whereby they would invest 250 million and 430 million respectively to address the programme's difficulties.[5] A major element of this was the enlisting of advice and expertise from General Dynamics Electric Boat.[17] The MoD also signed a design and production drawing work contract through the U.S. Navy which ran from 2004 to 2007.[18] As of March 2008 the programme was 48 per cent (or 1.2 billion) over-budget and 47 months late.[5] Further delays due to a range of technical and programme issues brought the programme to a position of 57 months late and 53 per cent (or 1.35 billion) over-budget by November 2009, with a forecast cost of 3.9 billion for the first three Astute boats.[] In June 2012 the order was placed for the manufacture of the nuclear reactor for the seventh Astute-class submarine Ajax alongside the refurbishment of Rolls-Royce manufacturing facility in Raynesway, Derby and the development and production of the first reactor for the next generation of SSBN to replace the Vanguard class.[19] Some serious quality assurance problems have been identified in the first boats built. Due to the failure of a pipe cap, made of incorrect material although construction records indicated the correct metal had been used, Astute was forced to surface following a leak that was flooding a compartment. Other problems have been identified, including the wrong type of lead being used in a reactor instrument, and other quality issues leading to early corrosion of components.[][]

Characteristics
The boats of the Astute class are powered by a Rolls-Royce PWR2 (Core H) (a pressurised water) reactor and fitted with a pump-jet propulsor. The PWR2 reactor was developed for the Vanguard-class ballistic missile submarines. As a result the new submarines are about 30 per cent larger than previous British fleet submarines, which were powered by smaller diameter reactors. Like all Royal Navy submarines, the bridge fin of the Astute-class boats is specially reinforced to allow surfacing through ice caps. These submarines can also be fitted with a dry deck shelter which allows special forces (e.g. SBS) to deploy whilst the submarine is submerged.[20]More than 39,000 acoustic tiles mask the vessel's sonar signature, giving the Astute class a better stealth quality than any other submarine previously operated by the Royal Navy.[21] Speculation released by the media stated that by using advanced stealth technology Astute "makes less noise than a baby dolphin, making her as good as undetectable by enemy ships."[22] Astute is the first Royal Navy submarine class to have a bunk for each member of the ship's company,[23] ending the practice of 'hot bunking', whereby two sailors on opposite watches shared the same bunk at different times. However, they have less mess-deck space than the Valiant-class submarine built 45 years earlier.[24][25] The Royal Navy announced a speed of 29+ knots for the class, but it is reported this speed could not be reached in the trials of Astute due to a propulsion design problem. It is unclear if this problem can be overcome, and at the launch of the Ambush the Royal Navy only stated she was "capable of speeds in excess of 20 knots".[][]

Astute-class submarine

Weapons and systems


The Astute class has stowage for 38 weapons and would typically carry both Spearfish heavy torpedoes and Tomahawk Block IV cruise missiles, the latter costing 870,000 each.[26] The Tomahawk missiles are capable of hitting a target to within a few metres within a range of 1,240 miles[27] (2,000km). The Astute class will also be able to fire the new "tactical Tomahawk" currently under development. The Astute Combat Management System is an evolved version of the Submarine Command System used on other classes of British submarine. The system receives data from the boat's sensors and displays real time imagery on all command consoles. The submarines also have Atlas Hydrographic DESO 25 high-precision echosounders, two CM010 non-hull-penetrating optronic mastsin place of conventional periscopeswhich carry thermal imaging and low-light TV and colour CCD TV sensors.[28] The class also mounts a Raytheon Successor IFF system.

The UK First Sea Lord, Admiral Stanhope (left), and US Chief of Naval Operations, Admiral Jonathan Greenert (centre), are briefed by the CO (right) on the capabilities of Astute during the joint exercise Fellowship 2012 between Astute and New Mexico

For detecting enemy ships and submarines the Astute class are equipped with the sophisticated Thales Underwater Systems Sonar 2076, an integrated passive/active search and attack sonar suite with bow, intercept, flank and towed arrays. BAE claims that the 2076 represents a "step change" over previous sonars and is the world's most advanced and effective sonar system.[29] In 2012, during simulated battles with the United States Navys latest Virginia-classsubmarine (the USS New Mexico), it was reported that the Americans were "taken aback" by Astute's capabilities. Royal Navy Commander Ian Breckenridge was quoted saying: Our sonar is fantastic and I have never before experienced holding a submarine at the range we were holding USS New Mexico. The Americans were utterly taken aback, blown away with what they were seeing.[30][31]

Boats of the class


Some aspects of the later Astute-class submarines will be different from boats 1-3, mostly related to the combat systemprimarily the command, navigation and sonar systems. Audacious is the first Royal Navy submarine which uses a shared computer environment for the different systems, common consoles and cabinets, and commercial "off-the-shelf" hardware and software, to reduce costs and improve maintainability. These changes have been back-fitted to boat 3, Artful; the eventual aim is to back-fit the "Common Combat System" to Astute and Ambush, and progressively to the rest of the Royal Navy submarine fleet.[32]
Name Hull Pennant number S119 Commissioned Status Ordered Laid down Launched Date of commission 27 August 2010 []

Astute

March 1997 March 1997 March 1997 May 2007 [35] March 2010

31 January 2001 22 October 2003 11 March 2005

8 June 2007

[33]

Ambush

S120

Commissioned

6 January [] 2011

1 March 2013

[34]

Artful

S121

Under construction

In service 2015

[]

Audacious Anson

4 5

S122 S123

Under construction Under construction

24 March 2009 13 October 2011

In service 2018 In service 2020

[] []

Astute-class submarine
[36] []

5
March 2010 18 July 2013

Agamemnon 6

S124

Under construction

In service 2022

Ajax

S125

Confirmed, long-lead items [37] ordered

In service 2024

[]

References
[3] ASTUTE CLASS, Royal Navy (http:/ / www. royalnavy. mod. uk/ The-Fleet/ Submarines/ Fleet-Submarines/ Astute-Class) [5] National Audit Office Ministry of Defence Major Projects Report 2008: Project Summary Sheets (http:/ / www. nao. org. uk/ / idoc. ashx?docId=c02da1c8-320b-4062-881d-2c24482459b5& version=-1) p.24 [10] "Britain's 1.3bn new sub Astute sets sail" (http:/ / www. independent. co. uk/ news/ business/ analysis-and-features/ britains-16313bn-new-sub-astute-sets-sail-1821847. html) The Independent (17 November 2009) [16] National Audit Office Ministry of Defence Major Projects Report 2008: Project Summary Sheets (http:/ / www. nao. org. uk/ / idoc. ashx?docId=c02da1c8-320b-4062-881d-2c24482459b5& version=-1) "Exceptional difficulties arose with the introduction of a computer aided design system, the availability of trained staff and project management" [19] http:/ / www. bbc. co. uk/ news/ uk-18475108 [23] Astute Fascinating Facts (http:/ / production. investis. com/ astute/ media/ press/ 2007-06-08a/ ) [28] BBC News Scotland, A vision of evolving technologies (http:/ / news. bbc. co. uk/ 1/ hi/ scotland/ 6969958. stm) 30 August 2007, 13:06 GMT [30] US 'taken aback' by HMS Astute (http:/ / www. defencemanagement. com/ news_story. asp?id=19073) [31] Awesome Astute Surpassed Every Expectation on Her Toughest Test Yet (http:/ / www. royalnavy. mod. uk/ News-and-Events/ Latest-News/ 2012/ March/ 02/ 120302-Astute-Clyde) [32] BAE Systems News, 10 December 2012 (http:/ / www. astuteclass. com/ 2012/ 12/ bae-systems-awarded-1-2bn-contract-for-audacious-submarine/ ) [35] Naval Ship Building (http:/ / www. navalshipbuilding. co. uk/ navalship_newsdetails. asp?newsID=1924& newsCatID=12) Boat 5 news [36] Sixth Astute Class submarine keel laid (https:/ / www. gov. uk/ government/ news/ sixth-astute-class-submarine-keel-laid) [37] UK: BAE Systems Secures $ 1.92 Bln Submarine Deal (http:/ / navaltoday. com/ 2012/ 12/ 11/ uk-bae-systems-secures-1-92-bln-submarine-deal/ )

External links
BAE Systems Astute Microsite (http://www.astuteclass.com/) Cutaway Diagram(pdf) (http://www.royalnavy.mod.uk/upload/pdf/Astute_cutaway_image. pdf)Wikipedia:Link rot Naval Technology - Astute Clas (http://www.naval-technology.com/projects/astute/) BAE Systems: Murray Easton Interview (http://www.naval-technology.com/features/feature1224/) How to Build a Nuclear Submarine (http://www.bbc.co.uk/programmes/b00sz49v). BBC Television documentary, first broadcast 27 June 2010.

Article Sources and Contributors

Article Sources and Contributors


Astute-class submarine Source: http://en.wikipedia.org/w/index.php?oldid=571091169 Contributors: 1exec1, Acaeton, Adeleander, Aidan Jennings, Albion05, AllStarZ, Andyaspden, Andysimo123, Anotherclown, Antarctic-adventurer, Antiochus the Great, Anyeverybody, August571, BadWolf42, Benea, Bgwhite, BlaiseFEgan, BobThePirate, Bobblewik, Brookie, Bryces, Chase me ladies, I'm the Cavalry, CrackDragon, Dan100, David Biddulph, David Newton, Dkohen, Dpaajones, DrFell, DragonHawk, Dsp13, DuncanHill, Dziban303, Eluchil404, Emoscopes, Frap, Gdr, GiorgiTu, Gogo Dodo, GraemeLeggett, Gwen-chan, H1523702, Haus, Hibernian, Ic451uk, Itai, J Milburn, JKBrooks85, Jean.julius, Jesperronn, Jim Sweeney, Jlang, John, John Smith's, John of Reading, Johnxxx9, Joly, Jonesey95, Kaihsu, Kurieeto, Le Deluge, Lightmouse, Los688, Lynbarn, MBK004, Marcus Qwertyus, Mark83, Maury Markowitz, Michael Hardy, MickMacNee, Mion, MrDolomite, N2e, N328KF, Neutrality, Nick Number, Nick-D, Nilmerg, Northfold, ObscureReality, Palfrey, Paul1776, Peter Harriman, Phd8511, Plasticup, Pmcm, Pol098, Qwfp, Rademire, Rave, Redf0x, Rees11, Rich Farmbrough, Rjanag, Rjwilmsi, Robert Merkel, Rwendland, Sa, Shem1805, Sietse Snel, Sp33dyphil, SpiderJon, Springnuts, SprintingSplinter, Steven Zhang, Stevvvv4444, Stringence, Subpots, Sullivan.t.j, Tarnish, Template namespace initialisation script, The Epopt, Thefreddy12354, Thiseye, Thom2002, Tide rolls, TomTheHand, Tpbradbury, Travisyoung, Tyrenius, Uk2030, Usergreatpower, WatcherZero, WeeWillieWiki, Woody, Yerkschmerk, 221 anonymous edits

Image Sources, Licenses and Contributors


File:HMS Ambush.jpg Source: http://en.wikipedia.org/w/index.php?title=File:HMS_Ambush.jpg License: unknown Contributors: LA(Phot) Will Haigh File:Naval Ensign of the United Kingdom.svg Source: http://en.wikipedia.org/w/index.php?title=File:Naval_Ensign_of_the_United_Kingdom.svg License: Public Domain Contributors: AnonMoos, Avicennasis, Bender235, Cycn, Dancingwombatsrule, Ec.Domnowall, Fry1989, Homo lupus, Pumbaa80, Stunteltje, Xiengyod, Yaddah, 3 anonymous edits

File:US Navy 120126-N-WL435-305 First Sea Lord and Chief of the Naval Staff of the Royal Navy Adm. Sir Mark Stanhope, left, and Chief of Naval Operation.jpg Source: http://en.wikipedia.org/w/index.php?title=File:US_Navy_120126-N-WL435-305_First_Sea_Lord_and_Chief_of_the_Naval_Staff_of_the_Royal_Navy_Adm._Sir_Mark_Stanhope,_left,_and_Chief_of_Naval_Operation.jp License: Public Domain Contributors: Benchill

License
Creative Commons Attribution-Share Alike 3.0 Unported //creativecommons.org/licenses/by-sa/3.0/

Potrebbero piacerti anche