Ras Abu Fontas B2 Power Plant, Qatar


Customers need

Supply of complete electrical balance of plant to the EPC GE for the power plant Extension of ABB GIS ABB knows what to do Coordination between owner, contractor and supplier

ABBs response

Delivery of turnkey package for the eBoP of the CCPP and a 230 kV GIS Substation

Management and coordination of all works from generator terminals to HV grid connection

Customers benefit

ABB takes full responsibility for engineering & coordination activities normally done by an architect engineer ABB enables GE as EPC to fulfil tight and demanding time schedule

ABB Group - 2 4-Sep-13

Control & Electrical Systems

Vietnam - Uong Bi Power Plant, EVN


Customer: LILAMA - EVN Uong Bi 300 MW Extension Coal Fired Power Plant Country: Vietnam Order Year: 2003 (DCS) / 2004 (eBoP) ABB Scope: Distributed control system, full automation, protection and monitoring of power plant Generator circuit breaker Isolated phase bus Transformers Medium voltage switchgear Low voltage switchgear DC / UPS system MV and LV cables and support system System design and engineering Project management ,installation supervision, testing & commissioning

ABB Group - 3 4-Sep-13

Control & Electrical Systems

Malaysia - Gelugor CCPP, TNB


Scope of ABB Supply:

Project management, engineering, testing, commissioning, and installation support


Control system Continuous emission monitoring Generator transformers Unit/Station transformers 6.6kV auxiliary transformers 6.6kV switchgear 415V switchgear (motor control centre)

Location: Penang Island, Malaysia 325MW Combined Cycle Power Plant


Gas turbine: GE Steam turbine: Fuji Electric

Isolated phase busduct


Generator circuit breakers (GCB) DC/ Uninterruptible power supply system Protection relay panel


ABB Group - 4 4-Sep-13

EPC contractor: Kawasaki Heavy Industries Project completion: Year 2003

Control & Electrical Systems

EDELCA Guri (Venezuela) Modernization


Customers need

Modernization of a 10 GW hydro plant

Extend the life cycle of the plant by 30 years


Improve levels for plant availability

ABBs response

Delivering of turnkey package consisting for 20 generating units of


Instrumentation & unit control systems, Electrical protections and communication

Customers benefit

ABB Group - 5 4-Sep-13

ABB takes full responsibility: design, fabrication, installation, testing, commissioning and training Application of state-of-the-art technologies Transfer of technology guaranteed: On-The Job training program

Control & Electrical Systems

Yixing Pumped Storage (China)


Customers need:

Electromechanical package for 4x250MW Pump storage power plant

ABB Response

GE/ABB consortium for electromechanical package

Control & protection systems


Electrical scope: MV switchgear, generator circuit breaker, isolated phase bus, excitation, SFC, cabling

Customer Benefit

ABB Group - 6 4-Sep-13

Completely automated remote control from two dispatch centers


Fully integrated control, protection and electrical system

Control & Electrical Systems

El Canada (Guatemala)
Customers need

Water to wire package for 2 x 26 MW hydroelectric power plant Executed in consortium with GE

ABB Scope:

Control Protection Station service Main transformer Substations Engineering & commissioning

Installation

Customers benefit:
ABB Group - 7 4-Sep-13

Project completed successful in record time

Control & Electrical Systems

ABB: EPM Guadalupe (Colombia)


Colombia, South America

Hydro Chain Control/Optimization


528 MW (3 plants) Hydro plant automation upgrades

ABB Scope

ABB Group - 8 4-Sep-13

Hydro chain control and optimization Plant control (local/remote) Station service (AC/DC distribution) Instrumentation (COABB) Engineering, training Commissioning supervision (COABB)

Control & Electrical Systems

Concepcion, Panama, Istmus Hydro


ABB/Mavel Consortium Project: 2 X 5 MW 2 Horizontal Francis Turbines Based on model test Water to wire package, including bifurcation EPC Contractor work closely together Capacity and efficiency guarantees Fist project of its kind in Panama

ABB Group - 9 4-Sep-13