Ramesh (Rudy) Shankar Signatech Systems, Inc.
TM
www.signatechsystems.com 704-430-7233
11/11/2008
Most of the new capacity will be installed by IPPs, Private Funders Present staffing needs require 0.6 person/MW New capacity would require drastic reduction in employees/MW to make it profitable while providing high PLF, reduced O&M costs
2008 Signatech Systems, Inc., Copyrighted Material
11/11/2008
11/11/2008
www.signatechsystems.com
Whats Missing?
www.signatechsystems.com
Centralized Monitoring
l l
Large gap in skills There are no NTPC-like organizations that have vast plant operating experience May result in shortfalls in Pressure to maintain low O&M costs to remain achieving generation capacity profitable expansion goals Credible India-based Service Network for this expanded capacity
l l
Central Resource to Manage Power Industry Assets Early detection of plant problems Strategy to continue reducing O&M costs
Drivers
l l l l l
New Technologies Improved Operations Improved Maintenance Planning/Strategy Improved Thermal Performance Improved Asset Management Tools
2008 Signatech Systems, Inc., Copyrighted Material
www.signatechsystems.com
www.signatechsystems.com
11/11/2008
11/11/2008
www.signatechsystems.com
11/11/2008
FARIDABAD FARIDABAD
ANTA ANTA
AURAIYA AURAIYA
RIHAND RIHAND KORBA KORBA TALCHER TALCHER TALCHER TALCHER TPS TPS
KAYAMKULAM KAYAMKULAM
SMART
SMART 24 x 7 Effort
www.signatechsystems.com www.signatechsystems.com
Background
l l l l l l l l l l l l l
Signatech Systems contracted in 2008 by U.S. DOE & USAID to develop 24 x 7 SMART requirements Tasks include identifying priorities with NTPC and US utility site visits NTPC Plant Manager Workshop November 1718, 2008 at NTPC PMI, Noida
Fleet Wide Monitoring for Equipment Condition Assessment. EPRI, Palo Alto, CA: 2004, 1010266. Fleet Wide Monitoring Interest Group. EPRI, Palo Alto, CA: 2005 Fleet Wide Monitoring Interest Group. EPRI. Palo Alto, CA: 2006, 1014508 On-Line Monitoring of Inst. Channel Performance: Volume 2.EPRI. Palo Alto, CA: 2004. 1003579 On-Line Monitoring of Inst. Channel Performance: Volume 3.EPRI. Palo Alto, CA: 2004,1007930 Risk-Based Management of Power Plant Equipment: Proc. Of the International Seminar, London. EPRI. Palo Alto, CA: 2002, 1007289. RFIDTechnology Trends and Power Plant Applications. EPRI. Palo Alto, CA: 2004, 1003733 On-Line Predictive Condition Monitoring for Coal Pulverizers: Appli cation of Wireless Technology. EPRI. Palo Alto, CA: 2003, 1004902. Fleet Wide Monitoring for Equipment Condition Assessment. EPRI, Palo Alto, CA: 2004, 1010266 On-Line Monitoring Cost-Benefit Guide. EPRI, Palo Alto, CA: 2003, 1006777. On-Line Monitoring for Equipment Condition Assessment: Application at Progress Energy. EPRI, Palo Alto, CA: 2004, 1008416. Eqpt. Condition Assessment: Cost Benefit Methodology. EPRI, Palo Alto, CA: 2004, 1011824. Eqpt.Condition Assessment, Volume 2: Technology Evaluation and Integration. EPRI, Palo Alto, CA: 2004. 1009601
11/11/2008
11/11/2008
Sampling of Utilities