Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Press Shop
Cutting Shop
Welding Line
Machine Shop
Item
Pieces/jig
Frame Handle Front Fork Seat pillar disc/ Chain disc Handle stem Upper bracket Seat clamp
8 4 12 8 9 9 16 20
Rim Assembly
Demand per month Current Daily Production Required Production Ratio Required Daily Production Required staff per shift Available staff per shift Possible in 2 shifts Need to outsource Total Market 8,000 197 100% 320 4.74 5 394 14 Plastic 4,800 140 60% 192 1.37 2 280 0 Steel 3,200 57 40% 128 3.37 3 114 14
Cost Analysis
Total current labor cost/ month = Rs. 528,000
240 FT @ 1700/month = 408,000 120 DP @ 40/shift = 120,000
New welding line = Rs. 1,000,000 Outsourcing Rim Assembly (14 per day)
14 x 5 x 25 = Rs. 1,750 Current cost of in-house assembly (19 @ Rs. 40)
Rs 2.11 per rim
Qualitative Analysis
Production planning for colors needs improvement
Use weekly production figures Minimize setups
Keep turnover minimum to develop skilled workforce Market is going to increase further Subcontracting