Sei sulla pagina 1di 9

1st chamber

315
315
315
316
317
23.43166
26.9
8.857809

Tons
to be
added

Insert 5
readings
here( H )

Here is
the filling
degree of
1st
chamber

Filling degree calculations


2nd chamber
MILL UMS 46x15.5
310
Insert 10
309
readings
310
here ( H
310
311
310
314
308
310
309
26.8822
Here is the filling
28.4
degree of 2nd
12.54302
Tons to

15.33 RPM 77.0%Crt.


Deff=4.41
Leff=3.89
charge
90mm
80mm
70mm
60mm
Total
Deff=4.52
Leff=10.86
charge
25mm
20mm
15mm
total

MS 46x15.5

15.33 RPM 77.0%Crt.


1st
chamber
ton
15.8
22
14.4
16.5
68.7
2nd
chamber
ton
88.9
88.9
44.5
222.3

128.9662

315.6 152667.6
95.1

35772.55
136.3758

310.1 160378.6
84.1

43113.3

0
5
10
15
20
25
30
35
40
45
50

1
0.9
0.84
0.785
0.743
0.697
0.656
0.618
0.577
0.537
0.5

y = 0.9716e-0.0132x
25.64637 0.692517
28.65249 0.665487
x = -75.504Ln(y) - 2.0955

1
0.9
0.84
0.785
0.743
0.697
0.656
0.618
0.577
0.537
0.5

0
5
10
15
20
25
30
35
40
45
50

y = -75.504Ln(x) - 2.0955

305
307
304
306
305
305.4
0.692517
25.64637

H/D 1

0.95
0.9
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5

y = 0.9716e-0.013x

Series1
Expon.
(Series1)

0 5 10 15 20 25 30 35 40 45 50
Filling degree

50
45
40
35
30
25
20
15
10
5
0

Series1

Log. (Series1)

y = -75.5ln(x) - 2.0955
0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95

295
303
306
300
298
300
299
302
301
302
300.8
0.665487
28.65249

Series1

Log. (Series1)

5.5ln(x) - 2.0955

Mill charge compensation


C.M 1
1st chamber

C.M 2
2nd chamber total
1st chamber

90mm 80mm 70mm 60mm 25mm 20mm 15mm

2nd chamber total

90mm 80mm 70mm 60mm 25mm 20mm 15mm

2001

10

2002

2003

10

14

15

C.M1
st

nd

11/5/2003 Mill charge was measured and filling degree was 27.3 for 1 chamber &28.3 for 2 chamber
23/8/2003 Mill charge was measured and filling degree was 25.3 for 1st chamber &28.3 for 2nd chamber
22-10-2003 Mill charge was measured and filling degree was 26.8 for 1st chamber &29.4 for 2nd chamber
06-01-2004 Mill charge was measured and filling degree was 25.1 for 1st chamber &28.4 for 2nd chamber

C.M2
7/5/2003

Mill charge was measured and filling degree was 25 for 1 st chamber &28.2 for 2nd chamber

Mill charge was measured and filling degree was 24 for 1 st chamber &26.5 for 2nd chamber
5tons to be added to 1st ch, 10tons to be added to 2nd ch.
5/8/2003 Millcharge was measured and filling degree was 26.5 for 1st chamber & 28.5 for 2nd chamber
10/9/2003 Mill charge was measured and filling degree was 26.4 for 1st chamber & 29.7 for 2nd chamber
8/1/2004 Mill charge was measured and filling degree was 26.1 for 1st chamber & 29.4 for 2nd chamber
26/7/2003

2nd chamber
r 2nd chamber
2nd chamber