Sei sulla pagina 1di 10

INGENIERIA CONTROL E INSTRUMENTACION S.A.

DE CV (ICISA)

TABLA DE TUBERIAS
DIAMETRO DE TUBERIA
8
ESPESOR - SCHEDULE
FABRICACION EN TALLER ced ced ced ced ced ced ced ced
REND. EN METROS Y PIEZAS
30 40 60 80 100 120 140 160

Camion Equipo Grupo Maqui Compre Equipo

Telesc

Plataf.

6%

6%

2.40

1%

1%

10%

2.33

3.00

1%

1%

10%

1.86

3.11

4.00

1%

1%

4.80

5.59

9.32

11.99

3.20

3.20

3.20

3.20

3.20

DONDE APLIQUE

100%

6.00

6.00

6.00

6.60

6.60

DONDE APLIQUE

100%

TRASLADO TUBERIA AL TALLER

0.16

0.16

0.16

0.24

0.32

0.32

0.40

0.80

TRAZO, CORTE Y BISELADO

1.20

1.20

1.60

2.00

2.40

3.20

4.80

6.40

PREPARA Y PUNTEO (BRIDA)

0.53

0.56

0.67

0.85

0.96

1.12

1.86

PREPARA Y PUNTEO (CODO)

0.67

0.70

0.83

1.07

1.20

1.40

PREPARA Y PUNTEO (TEE)

0.89

0.93

1.11

1.42

1.60

SOLDADURA RAIZ ABIERTA

2.66

2.80

3.33

4.26

PRECALENTAMIENTO CONTINUO

3.20

3.20

3.20

RELEVADO DE ESFUERZOS

6.00

6.00

6.00

RENDIMIENTOS EN TONELADAS

MAQUINARIA
Grua

Corte

Soldar Relevo

375

Sambla

50%

10%
100%

1.00 LONGITUD PROMEDIO DEL TRAMO A SOLDAR

RENDIMIENTO TUBERIA

33.38 29.16 24.27 22.24 20.98 19.19

21.00

RENDIMIENTO SOLDADURA

72.37 65.74 62.69 65.92 63.15 61.83

92.34 107.70

25.57

2.5%

2.5%

5%
100%

INSTALACION Y MONTAJE EN PLANTA


REND. EN METROS Y PIEZAS
TUBERIA METRO (RECTA -RACK )

1.04

1.04

1.04

1.09

1.14

1.30

1.46

2.08

4%

4%

TUBERIA - METRO (SPOOL)

2.40

2.40

2.40

2.52

2.64

3.00

3.36

4.80

4%

4%

PREPARA Y PUNTEO (BRIDA)

0.72

0.76

0.90

1.15

1.29

1.51

2.52

3.24

1%

1%

30%

30%

PREPARA Y PUNTEO (CODO)

0.90

0.94

1.12

1.44

1.62

1.89

3.15

4.05

1%

1%

30%

30%

PREPARA Y PUNTEO (TEE)

1.33

1.40

1.67

2.13

2.40

2.80

4.66

5.99

1%

1%

30%

SOLDADURA RAIZ ABIERTA

4.00

4.20

5.00

6.39

7.19

8.39

13.99

17.98

PRECALENTAMIENTO CONTINUO

3.52

3.52

3.52

3.52

3.52

3.52

3.52

3.52

DONDE APLIQUE

100%

RELEVADO DE ESFUERZOS

6.60

6.60

6.60

6.60

6.60

6.60

7.26

7.26

DONDE APLIQUE

100%

INSTALACION VALVULA 150 LBS.

2.40

4%

4%

INSTALACION VALVULA 300 LBS.

2.80

4%

4%

INSTALACION VALVULA 600 LBS.

3.20

4%

4%

INSTALACION VALVULA 900 LBS.

5.60

4%

4%

INSTALACION VALVULA 1500 LBS.

8.00

4%

4%

INST,JGO ESPARRAGOS Y JUNTA

1.60

1.76

2.08

2.72

30%
100%

3.20

PESO POR METRO LINEAL

36.81 42.55 53.12 64.66 75.93 90.48 100.98 111.31

SUPERFICIE- METRO EN ( M2 )

0.688

CON MOVIMIENTOS DE TUBERIAS, PONER GRUA Y CAMI.

SAMBLASTEO POR METRO LINEAL

0.41

PINTURA DE PRIMARIO ML.

0.12

5%

PINTURA DE ACABADO ML.

0.19

5%

RENDIMIENTOS EN TONELADAS

4%

4%

35%

35%

4.00 LONGITUD PROMEDIO DEL TRAMO A MONTAR

RENDIMIENTO TUBERIA

61.03 52.98 42.74 36.40 32.10 29.40

28.78

33.64

RENDIMIENTO SOLDADURA

27.14 24.65 23.51 24.72 23.68 23.19

34.63

40.39

2.5%

2.5%

5%
100%

RENDIMIENTO SAMBLASTEO

3.36

2.91

2.33

1.92

1.63

1.37

1.23

1.11

35%

RENDIMIENTO PINTURA

7.48

6.47

5.18

4.26

3.62

3.04

2.73

2.47

5%

Pgina 1 de 10

35%

INGENIERIA CONTROL E INSTRUMENTACION S.A. DE CV (ICISA)

TABLAS DE TUBERIAS
DIAMETRO DE TUBERIA

8
ESPESOR - SCHEDULE
ced ced ced ced ced ced ced ced
30 40 60 80 100 120 140 160

REND. EN METROS Y PIEZAS

CONSUMIBLES

GAS OXIGENO (M3/CORTE)

0.29

0.34

0.42

0.51

0.60

0.71

0.80

0.88

GAS ACETILENO (KGS/CORTE)

0.14

0.17

0.21

0.25

0.30

0.36

0.40

0.44

0.87

1.03

1.15

1.27

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

0.66
0.42

0.49

0.61

VARILLA DESNUDA

0.74
0.25

DISCO DESBASTE, POR BISEL

0.20

0.23

0.29

0.35

0.41

0.49

0.55

0.60

DISCO FINO (JUNTA/SOLDADURA)

0.33

0.38

0.48

0.58

0.68

0.81

0.91

1.00

PINTURA PRIMARIO ( LITRO X ML )

0.15

PINTURA ACABADO ( LITRO X ML )

0.23

REND. TONELADAS FABRICACION


GAS OXIGENO (M3/CORTE)

7.88

7.88

7.88

7.88

7.88

7.88

7.88

7.88

GAS ACETILENO (KGS/CORTE)

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

11.40 11.40 11.40 11.40 11.40 11.40

11.40

11.40

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

17.92

VARILLA DESNUDA

6.68

DISCO DESBASTE, POR BISEL

5.40

5.40

5.40

5.40

5.40

5.40

5.40

5.40

DISCO FINO (JUNTA/SOLDADURA)

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

GAS OXIGENO (M3/CORTE)

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

GAS ACETILENO (KGS/CORTE)

0.98

0.98

0.98

0.98

0.98

0.98

0.98

0.98

2.85

2.85

2.85

2.85

REND. EN TONELADAS MONTAJE

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

4.48
2.85

2.85

2.85

VARILLA DESNUDA

2.85
1.67

DISCO DESBASTE POR BISEL

1.35

1.35

1.35

1.35

1.35

1.35

1.35

1.35

DISCO FINO (JUNTA/SOLDADURA)

2.25

2.25

2.25

2.25

2.25

2.25

2.25

2.25

PINTURA PRIMARIO ( LITRO X ML )

4.67

4.04

3.24

2.66

2.27

1.90

1.70

1.55

PINTURA ACABADO ( LITRO X ML )

7.48

6.47

5.18

4.26

3.62

3.04

2.73

2.47

Pgina 2 de 10

MAQUINARIA
Grua
Telesc

Camion Equipo Grupo Maqui Compre Equipo


Plataf.

Corte

Soldar Relevo

375

Sambla

INGENIERIA CONTROL E INSTRUMENTACION S.A. DE CV (ICISA)

TABLA DE TUBERIAS
DIAMETRO DE TUBERIA
8
ESPESOR - SCHEDULE
FABRICACION EN TALLER ced ced ced ced ced ced ced ced
REND. EN METROS Y PIEZAS
30 40 60 80 100 120 140 160

Camion Equipo Grupo Maqui Compre Equipo

Telesc

Plataf.

6%

6%

2.40

1%

1%

10%

2.33

3.00

1%

1%

10%

1.86

3.11

4.00

1%

1%

4.80

5.59

9.32

11.99

3.20

3.20

3.20

3.20

3.20

DONDE APLIQUE

100%

6.00

6.00

6.00

6.60

6.60

DONDE APLIQUE

100%

TRASLADO TUBERIA AL TALLER

0.16

0.16

0.16

0.24

0.32

0.32

0.40

0.80

TRAZO, CORTE Y BISELADO

1.20

1.20

1.60

2.00

2.40

3.20

4.80

6.40

PREPARA Y PUNTEO (BRIDA)

0.53

0.56

0.67

0.85

0.96

1.12

1.86

PREPARA Y PUNTEO (CODO)

0.67

0.70

0.83

1.07

1.20

1.40

PREPARA Y PUNTEO (TEE)

0.89

0.93

1.11

1.42

1.60

SOLDADURA RAIZ ABIERTA

2.66

2.80

3.33

4.26

PRECALENTAMIENTO CONTINUO

3.20

3.20

3.20

RELEVADO DE ESFUERZOS

6.00

6.00

6.00

RENDIMIENTOS EN TONELADAS

MAQUINARIA
Grua

Corte

Soldar Relevo

375

Sambla

50%

10%
100%

1.00 LONGITUD PROMEDIO DEL TRAMO A SOLDAR

RENDIMIENTO TUBERIA

33.38 29.16 24.27 22.24 20.98 19.19

21.00

RENDIMIENTO SOLDADURA

72.37 65.74 62.69 65.92 63.15 61.83

92.34 107.70

25.57

2.5%

2.5%

5%
100%

INSTALACION Y MONTAJE EN PLANTA


REND. EN METROS Y PIEZAS
TUBERIA METRO (RECTA -RACK )

1.04

1.04

1.04

1.09

1.14

1.30

1.46

2.08

4%

4%

TUBERIA - METRO (SPOOL)

2.40

2.40

2.40

2.52

2.64

3.00

3.36

4.80

4%

4%

PREPARA Y PUNTEO (BRIDA)

0.72

0.76

0.90

1.15

1.29

1.51

2.52

3.24

1%

1%

30%

30%

PREPARA Y PUNTEO (CODO)

0.90

0.94

1.12

1.44

1.62

1.89

3.15

4.05

1%

1%

30%

30%

PREPARA Y PUNTEO (TEE)

1.33

1.40

1.67

2.13

2.40

2.80

4.66

5.99

1%

1%

30%

SOLDADURA RAIZ ABIERTA

4.00

4.20

5.00

6.39

7.19

8.39

13.99

17.98

PRECALENTAMIENTO CONTINUO

3.52

3.52

3.52

3.52

3.52

3.52

3.52

3.52

DONDE APLIQUE

100%

RELEVADO DE ESFUERZOS

6.60

6.60

6.60

6.60

6.60

6.60

7.26

7.26

DONDE APLIQUE

100%

INSTALACION VALVULA 150 LBS.

2.40

4%

4%

INSTALACION VALVULA 300 LBS.

2.80

4%

4%

INSTALACION VALVULA 600 LBS.

3.20

4%

4%

INSTALACION VALVULA 900 LBS.

5.60

4%

4%

INSTALACION VALVULA 1500 LBS.

8.00

4%

4%

INST,JGO ESPARRAGOS Y JUNTA

1.60

1.76

2.08

2.72

30%
100%

3.20

PESO POR METRO LINEAL

36.81 42.55 53.12 64.66 75.93 90.48 100.98 111.31

SUPERFICIE- METRO EN ( M2 )

0.688

CON MOVIMIENTOS DE TUBERIAS, PONER GRUA Y CAMI.

SAMBLASTEO POR METRO LINEAL

0.41

PINTURA DE PRIMARIO ML.

0.12

5%

PINTURA DE ACABADO ML.

0.19

5%

RENDIMIENTOS EN TONELADAS

4%

4%

35%

35%

4.00 LONGITUD PROMEDIO DEL TRAMO A MONTAR

RENDIMIENTO TUBERIA

61.03 52.98 42.74 36.40 32.10 29.40

28.78

33.64

RENDIMIENTO SOLDADURA

27.14 24.65 23.51 24.72 23.68 23.19

34.63

40.39

2.5%

2.5%

5%
100%

RENDIMIENTO SAMBLASTEO

3.36

2.91

2.33

1.92

1.63

1.37

1.23

1.11

35%

RENDIMIENTO PINTURA

7.48

6.47

5.18

4.26

3.62

3.04

2.73

2.47

5%

Pgina 3 de 10

35%

INGENIERIA CONTROL E INSTRUMENTACION S.A. DE CV (ICISA)

TABLAS DE TUBERIAS
DIAMETRO DE TUBERIA

8
ESPESOR - SCHEDULE
ced ced ced ced ced ced ced ced
30 40 60 80 100 120 140 160

REND. EN METROS Y PIEZAS

CONSUMIBLES

GAS OXIGENO (M3/CORTE)

0.29

0.34

0.42

0.51

0.60

0.71

0.80

0.88

GAS ACETILENO (KGS/CORTE)

0.14

0.17

0.21

0.25

0.30

0.36

0.40

0.44

0.87

1.03

1.15

1.27

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

0.66
0.42

0.49

0.61

VARILLA DESNUDA

0.74
0.25

DISCO DESBASTE, POR BISEL

0.20

0.23

0.29

0.35

0.41

0.49

0.55

0.60

DISCO FINO (JUNTA/SOLDADURA)

0.33

0.38

0.48

0.58

0.68

0.81

0.91

1.00

PINTURA PRIMARIO ( LITRO X ML )

0.15

PINTURA ACABADO ( LITRO X ML )

0.23

REND. TONELADAS FABRICACION


GAS OXIGENO (M3/CORTE)

7.88

7.88

7.88

7.88

7.88

7.88

7.88

7.88

GAS ACETILENO (KGS/CORTE)

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

11.40 11.40 11.40 11.40 11.40 11.40

11.40

11.40

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

17.92

VARILLA DESNUDA

6.68

DISCO DESBASTE, POR BISEL

5.40

5.40

5.40

5.40

5.40

5.40

5.40

5.40

DISCO FINO (JUNTA/SOLDADURA)

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

GAS OXIGENO (M3/CORTE)

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

GAS ACETILENO (KGS/CORTE)

0.98

0.98

0.98

0.98

0.98

0.98

0.98

0.98

2.85

2.85

2.85

2.85

REND. EN TONELADAS MONTAJE

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

4.48
2.85

2.85

2.85

VARILLA DESNUDA

2.85
1.67

DISCO DESBASTE POR BISEL

1.35

1.35

1.35

1.35

1.35

1.35

1.35

1.35

DISCO FINO (JUNTA/SOLDADURA)

2.25

2.25

2.25

2.25

2.25

2.25

2.25

2.25

PINTURA PRIMARIO ( LITRO X ML )

4.67

4.04

3.24

2.66

2.27

1.90

1.70

1.55

PINTURA ACABADO ( LITRO X ML )

7.48

6.47

5.18

4.26

3.62

3.04

2.73

2.47

Pgina 4 de 10

MAQUINARIA
Grua
Telesc

Camion Equipo Grupo Maqui Compre Equipo


Plataf.

Corte

Soldar Relevo

375

Sambla

INGENIERIA CONTROL E INSTRUMENTACION S.A. DE CV (ICISA)

TABLA DE TUBERIAS
DIAMETRO DE TUBERIA
10
ESPESOR - SCHEDULE
FABRICACION EN TALLER ced ced ced ced ced ced ced ced
REND. EN METROS Y PIEZAS
30 40 60 80 100 120 140 160

Camion Equipo Grupo Maqui Compre Equipo

Telesc

Plataf.

6%

6%

3.00

1%

1%

10%

2.91

3.75

1%

1%

10%

3.89

5.00

1%

1%

5.99

6.99 11.66

14.99

4.00

4.00

4.00

4.00

4.00

DONDE APLIQUE

100%

6.00

6.00

6.00

6.60

6.60

DONDE APLIQUE

100%

TRASLADO TUBERIA AL TALLER

0.20

0.20

0.20

0.30

0.40

0.40

0.50

1.00

TRAZO, CORTE Y BISELADO

1.50

1.50

2.00

2.50

3.00

4.00

6.00

8.00

PREPARA Y PUNTEO (BRIDA)

0.67

0.70

0.83

1.07

1.20

1.40

2.33

PREPARA Y PUNTEO (CODO)

0.83

0.87

1.04

1.33

1.50

1.75

PREPARA Y PUNTEO (TEE)

1.11

1.17

1.39

1.78

2.00

2.33

SOLDADURA RAIZ ABIERTA

3.33

3.50

4.16

5.33

PRECALENTAMIENTO CONTINUO

4.00

4.00

4.00

RELEVADO DE ESFUERZOS

6.00

6.00

6.00

RENDIMIENTOS EN TONELADAS

MAQUINARIA
Grua

Corte

Soldar Relevo

375

Sambla

50%

10%
100%

1.00 LONGITUD PROMEDIO DEL TRAMO A SOLDAR

RENDIMIENTO TUBERIA

25.86 22.26 17.75 17.37 16.70 16.27 18.58

23.35

RENDIMIENTO SOLDADURA

65.29 57.96 51.02 55.50 52.24 52.58 75.10

86.97

2.5%

2.5%

5%
100%

INSTALACION Y MONTAJE EN PLANTA


REND. EN METROS Y PIEZAS
TUBERIA METRO (RECTA -RACK )

1.30

1.30

1.30

1.37

1.43

1.63

1.82

2.60

4%

4%

TUBERIA - METRO (SPOOL)

3.00

3.00

3.00

3.15

3.30

3.75

4.20

6.00

4%

4%

PREPARA Y PUNTEO (BRIDA)

0.90

0.94

1.12

1.44

1.62

1.89

3.15

4.05

1%

1%

30%

30%

PREPARA Y PUNTEO (CODO)

1.12

1.18

1.40

1.80

2.02

2.36

3.93

5.06

1%

1%

30%

30%

PREPARA Y PUNTEO (TEE)

1.67

1.75

2.08

2.66

3.00

3.50

5.83

7.49

1%

1%

30%

SOLDADURA RAIZ ABIERTA

5.00

5.24

6.24

7.99

8.99 10.49 17.48

22.48

PRECALENTAMIENTO CONTINUO

4.40

4.40

4.40

4.40

4.40

4.40

4.40

4.40

DONDE APLIQUE

100%

RELEVADO DE ESFUERZOS

6.60

6.60

6.60

6.60

6.60

6.60

7.26

7.26

DONDE APLIQUE

100%

INSTALACION VALVULA 150 LBS.

3.00

4%

4%

INSTALACION VALVULA 300 LBS.

3.50

4%

4%

INSTALACION VALVULA 600 LBS.

4.00

4%

4%

INSTALACION VALVULA 900 LBS.

7.00

4%

4%

INSTALACION VALVULA 1500 LBS.

10.00

4%

4%

INST,JGO ESPARRAGOS Y JUNTA

2.00

2.20

2.60

3.40

PESO POR METRO LINEAL

51.00

60.3

81.6

96.0 114.8 133.0 155.2

SUPERFICIE- METRO EN ( M2 )

0.858

30%
100%

4.00
172.3
CON MOVIMIENTOS DE TUBERIAS, PONER GRUA Y CAMI.

SAMBLASTEO POR METRO LINEAL

0.51

PINTURA DE PRIMARIO ML.

0.15

5%

PINTURA DE ACABADO ML.

0.24

5%

RENDIMIENTOS EN TONELADAS

4%

4%

35%

35%

4.00 LONGITUD PROMEDIO DEL TRAMO A MONTAR

RENDIMIENTO TUBERIA

50.60 43.03 32.30 28.64 25.03 23.83 22.78

27.08

RENDIMIENTO SOLDADURA

24.49 21.73 19.13 20.81 19.59 19.72 28.16

32.61

2.5%

2.5%

5%
100%

RENDIMIENTO SAMBLASTEO

3.03

2.56

1.89

1.61

1.35

1.16

1.00

0.90

35%

RENDIMIENTO PINTURA

6.73

5.69

4.21

3.58

2.99

2.58

2.21

1.99

5%

Pgina 5 de 10

35%

INGENIERIA CONTROL E INSTRUMENTACION S.A. DE CV (ICISA)

TABLAS DE TUBERIAS
DIAMETRO DE TUBERIA

10
ESPESOR - SCHEDULE
ced ced ced ced ced ced ced ced
30 40 60 80 100 120 140 160

REND. EN METROS Y PIEZAS

CONSUMIBLES

GAS OXIGENO (M3/CORTE)

0.40

0.48

0.64

0.76

0.90

1.05

1.22

1.36

GAS ACETILENO (KGS/CORTE)

0.20

0.24

0.32

0.38

0.45

0.52

0.61

0.68

1.31

1.52

1.77

1.96

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

0.98
0.58

0.69

0.93

VARILLA DESNUDA

1.09
0.36

DISCO DESBASTE, POR BISEL

0.28

0.33

0.44

0.52

0.62

0.72

0.84

0.93

DISCO FINO (JUNTA/SOLDADURA)

0.46

0.54

0.73

0.86

1.03

1.20

1.40

1.55

PINTURA PRIMARIO ( LITRO X ML )

0.19

PINTURA ACABADO ( LITRO X ML )

0.29

REND. TONELADAS FABRICACION


GAS OXIGENO (M3/CORTE)

7.88

7.88

7.88

7.88

7.88

7.88

7.88

7.88

GAS ACETILENO (KGS/CORTE)

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

11.40 11.40 11.40 11.40 11.40 11.40 11.40

11.40

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

19.20

VARILLA DESNUDA

7.15

DISCO DESBASTE, POR BISEL

5.40

5.40

5.40

5.40

5.40

5.40

5.40

5.40

DISCO FINO (JUNTA/SOLDADURA)

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

GAS OXIGENO (M3/CORTE)

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

GAS ACETILENO (KGS/CORTE)

0.98

0.98

0.98

0.98

0.98

0.98

0.98

0.98

2.85

2.85

2.85

2.85

REND. EN TONELADAS MONTAJE

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

4.80
2.85

2.85

2.85

VARILLA DESNUDA

2.85
1.79

DISCO DESBASTE POR BISEL

1.35

1.35

1.35

1.35

1.35

1.35

1.35

1.35

DISCO FINO (JUNTA/SOLDADURA)

2.25

2.25

2.25

2.25

2.25

2.25

2.25

2.25

PINTURA PRIMARIO ( LITRO X ML )

4.21

3.56

2.63

2.23

1.87

1.61

1.38

1.24

PINTURA ACABADO ( LITRO X ML )

6.73

5.69

4.21

3.58

2.99

2.58

2.21

1.99

Pgina 6 de 10

MAQUINARIA
Grua
Telesc

Camion Equipo Grupo Maqui Compre Equipo


Plataf.

Corte

Soldar Relevo

375

Sambla

INGENIERIA CONTROL E INSTRUMENTACION S.A. DE CV (ICISA)

TABLA DE TUBERIAS
DIAMETRO DE TUBERIA
12
ESPESOR - SCHEDULE
FABRICACION EN TALLER ced ced ced ced ced ced ced ced
REND. EN METROS Y PIEZAS
30 40 60 80 100 120 140 160

Plataf.

6%

6%

3.60

1%

1%

10%

3.50

4.50

1%

1%

10%

2.80

4.66

5.99

1%

1%

7.19

8.39

13.99

17.98

4.80

4.80

4.80

4.80

4.80

DONDE APLIQUE

100%

6.00

6.00

6.00

6.60

6.60

DONDE APLIQUE

100%

0.24

0.24

0.24

0.36

0.48

0.48

0.60

1.20

TRAZO, CORTE Y BISELADO

1.80

1.80

2.40

3.00

3.60

4.80

7.20

9.60

PREPARA Y PUNTEO (BRIDA)

0.80

0.84

1.00

1.28

1.44

1.68

2.80

PREPARA Y PUNTEO (CODO)

1.00

1.05

1.25

1.60

1.80

2.10

PREPARA Y PUNTEO (TEE)

1.33

1.40

1.67

2.13

2.40

SOLDADURA RAIZ ABIERTA

4.00

4.20

5.00

6.39

PRECALENTAMIENTO CONTINUO

4.80

4.80

4.80

RELEVADO DE ESFUERZOS

6.00

6.00

6.00

RENDIMIENTO TUBERIA
RENDIMIENTO SOLDADURA

Camion Equipo Grupo Maqui Compre Equipo

Telesc

TRASLADO TUBERIA AL TALLER

RENDIMIENTOS EN TONELADAS

MAQUINARIA
Grua

Corte

Soldar Relevo

375

Sambla

50%

10%
100%

1.00 LONGITUD PROMEDIO DEL TRAMO A SOLDAR


21.81 20.00 15.02 14.90 14.65 14.81

18.38

23.30

61.3 58.03 45.83 48.44 44.96 44.87

67.18

75.27

2.5%

2.5%

5%
100%

INSTALACION Y MONTAJE EN PLANTA


REND. EN METROS Y PIEZAS
TUBERIA METRO (RECTA -RACK )

1.56

1.56

1.56

1.64

1.72

1.95

2.18

3.12

4%

4%

TUBERIA - METRO (SPOOL)

3.60

3.60

3.60

3.78

3.96

4.50

5.04

7.20

4%

4%

PREPARA Y PUNTEO (BRIDA)

1.08

1.13

1.35

1.73

1.94

2.27

3.78

4.86

1%

1%

30%

30%

PREPARA Y PUNTEO (CODO)

1.35

1.42

1.69

2.16

2.43

2.83

4.72

6.07

1%

1%

30%

30%

PREPARA Y PUNTEO (TEE)

2.00

2.10

2.50

3.20

3.60

4.20

6.99

8.99

1%

1%

30%

SOLDADURA RAIZ ABIERTA

5.99

6.29

7.49

9.59 10.79 12.59

20.98

26.97

PRECALENTAMIENTO CONTINUO

5.27

5.27

5.27

5.27

5.27

5.27

5.27

5.27

DONDE APLIQUE

100%

RELEVADO DE ESFUERZOS

6.60

6.60

6.60

6.60

6.60

6.60

7.26

7.26

DONDE APLIQUE

100%

INSTALACION VALVULA 150 LBS.

3.60

4%

4%

INSTALACION VALVULA 300 LBS.

4.20

4%

4%

INSTALACION VALVULA 600 LBS.

4.80

4%

4%

INSTALACION VALVULA 900 LBS.

8.40

4%

4%

INSTALACION VALVULA 1500 LBS.

12.00

4%

4%

INST,JGO ESPARRAGOS Y JUNTA

2.40

PESO POR METRO LINEAL

65.23

SUPERFICIE- METRO EN ( M2 )

1.017

2.64

3.12

4.08

30%
100%

4.80

72.3 109.0 132.0 160.0 187.0

208.2

238.9
CON MOVIMIENTOS DE TUBERIAS, PONER GRUA Y CAMI.

SAMBLASTEO POR METRO LINEAL

0.61

PINTURA DE PRIMARIO ML.

0.18

5%

PINTURA DE ACABADO ML.

0.28

5%

RENDIMIENTOS EN TONELADAS

4%

4%

35%

35%

4.00 LONGITUD PROMEDIO DEL TRAMO A MONTAR

RENDIMIENTO TUBERIA

44.82 40.64 27.67 24.07 20.95 20.04

20.27

23.89

RENDIMIENTO SOLDADURA

22.97 21.76 17.18 18.16 16.86 16.83

25.19

28.23

2.5%

2.5%

5%
100%

RENDIMIENTO SAMBLASTEO

2.81

2.53

1.68

1.39

1.14

0.98

0.88

0.77

35%

RENDIMIENTO PINTURA

6.24

5.63

3.73

3.08

2.54

2.18

1.95

1.70

5%

Pgina 7 de 10

35%

INGENIERIA CONTROL E INSTRUMENTACION S.A. DE CV (ICISA)

TABLAS DE TUBERIAS
DIAMETRO DE TUBERIA

12
ESPESOR - SCHEDULE
ced ced ced ced ced ced ced ced
30 40 60 80 100 120 140 160

REND. EN METROS Y PIEZAS

CONSUMIBLES

GAS OXIGENO (M3/CORTE)

0.51

0.57

0.86

1.04

1.26

1.47

1.64

1.88

GAS ACETILENO (KGS/CORTE)

0.26

0.28

0.43

0.52

0.63

0.74

0.82

0.94

1.82

2.13

2.37

2.72

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

1.35
0.74

0.82

1.24

VARILLA DESNUDA

1.50
0.50

DISCO DESBASTE, POR BISEL

0.35

0.39

0.59

0.71

0.86

1.01

1.12

1.29

DISCO FINO (JUNTA/SOLDADURA)

0.59

0.65

0.98

1.19

1.44

1.68

1.87

2.15

PINTURA PRIMARIO ( LITRO X ML )

0.23

PINTURA ACABADO ( LITRO X ML )

0.34

REND. TONELADAS FABRICACION


GAS OXIGENO (M3/CORTE)

7.88

7.88

7.88

7.88

7.88

7.88

7.88

7.88

GAS ACETILENO (KGS/CORTE)

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

11.40 11.40 11.40 11.40 11.40 11.40

11.40

11.40

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

20.64

VARILLA DESNUDA

7.69

DISCO DESBASTE, POR BISEL

5.40

5.40

5.40

5.40

5.40

5.40

5.40

5.40

DISCO FINO (JUNTA/SOLDADURA)

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

GAS OXIGENO (M3/CORTE)

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

GAS ACETILENO (KGS/CORTE)

0.98

0.98

0.98

0.98

0.98

0.98

0.98

0.98

2.85

2.85

2.85

2.85

REND. EN TONELADAS MONTAJE

GAS ARGON (M3/JUNTA)


ELECTRODO RECUBIERTO

5.16
2.85

2.85

2.85

VARILLA DESNUDA

2.85
1.92

DISCO DESBASTE POR BISEL

1.35

1.35

1.35

1.35

1.35

1.35

1.35

1.35

DISCO FINO (JUNTA/SOLDADURA)

2.25

2.25

2.25

2.25

2.25

2.25

2.25

2.25

PINTURA PRIMARIO ( LITRO X ML )

3.90

3.52

2.33

1.93

1.59

1.36

1.22

1.06

PINTURA ACABADO ( LITRO X ML )

6.24

5.63

3.73

3.08

2.54

2.18

1.95

1.70

Pgina 8 de 10

MAQUINARIA
Grua
Telesc

Camion Equipo Grupo Maqui Compre Equipo


Plataf.

Corte

Soldar Relevo

375

Sambla

Metros
por
Tonelada

Peso por
Metro

Dimetro
Milimetro

Dimetro
Pulgadas

Item.

TABLAS DE TUBERIAS PARA RENDIMIENTOS EN TONELADAS.


FABRICACIN Y MONTAJE, LAS CEDULAS CONSIDERADAS SON 40 Y ESTANDAR
PARA MAYORES DE 14"
N.Juntas N.Juntas Fabrica. Fabrica. Montaje Montaje
Fabrica. Montaje
H/H
H/H
H/H
H/H
por
por
Tonelada Tonelada Tonelada Tonelada
Cada
Cada
Tubero Soldador Tubero Soldador
25.4
3.23 309.60
2.00
4.00
263.16
162.54
275.54
106.04
1
50.8
5.44 183.82
2.00
4.00
183.82
118.57
216.91
66.64
2
76.2
7.00 142.86
2.00
4.00
158.57
97.86
187.14
57.86
3
101.6 15.00 66.67
2.00
4.00
84.00
49.33
91.33
29.00
4
152.4 28.00 35.71
2.00
4.00
53.57
39.64
62.86
23.39
6
203.2
43.00
23.26
2.00
4.00
43.95
34.42
52.09
20.29
8
2.00
4.00
35.33
27.83
41.67
16.38
10 254.0 60.00 16.67
2.00
4.00
36.92
27.08
43.69
15.96
12 304.8 65.00 15.38
2.00
4.00
34.44
24.01
40.62
14.14
14 355.6 81.00 12.35
2.00
4.00
34.30
23.71
40.43
13.95
16 406.4 93.00 10.75
8.20
2.00
4.00
29.51
20.29
34.59
11.95
18 457.2 122.00
6.45
2.00
4.00
25.81
18.65
30.39
12.06
20 508.0 155.00
4.76
2.00
4.00
22.86
18.88
27.62
11.12
24 609.6 210.00
3.97
2.00
4.00
21.23
18.85
24.33
10.34
26 660.4 252.00
3.42
2.00
4.00
19.18
17.98
22.60
10.27
30 762.0 292.00

Electrodo Electrodo Oxigeno Acetileno Oxigeno Acetileno


por
por
por
por
por
por
Tonelada Tonelada Tonelada Tonelada Tonelada Tonelada
Fabrica. Montaje Fabrica. Fabrica. Montaje Montaje
6.97
3.48
9.29
3.10
4.64
1.55