Department of Energy
Biomass 13.1%*
Geothermal 21.0%
Hydro 4.8%
NatGas 7.4%
Coal 17.3%
Hydro 9.79%
Solar Biomass 0.002% Wind Hydro 0.04% 0.09% 11.52% Geothermal 14.66% Coal 34.40%
= 67,743 GWh
Note: Generation data includes grid connected, embedded, and off-grid generators
b. Renewable Energy
Oil/Hydro Carbons
Global oil demand is expected to rise to 89.9 mb/d as economic growth accelerates through end-2012;
Non-OPEC supply fell in March to 52.7 mb/d. For the remaining months, supply is expected to grow to 53.4 mb/d
Electricity
Ave. Spot Price: 2010 P6.75 2011 P4.60 2012 P5.08 (March 2012)
Peak
Reserve Margin Requirement MW
Spot Market
Intermediate
Base-load
Bilateral Contract
TIME OF DAY
Capacity Mix
LUZON VISAYAS MINDANAO
63.94%
71.88%
37.31%
Note: Base-load Power Plants are the facilities used to meet some or all of a given continuous energy demand, and produce energy at a constant rate, usually at low cost relative to other facilities available to the system
Legend:
Geothermal Coal Natgas Hydro Oil-based 2012 System Peak Demand Required Reserve Margin
Legend:
Geothermal Coal Source: DOR & DOH of NGCP Hydro Oil-based 2012 System Peak Demand Required Reserve Margin
Legend:
Geothermal Coal Source: DOR & DOH of NGCP Hydro Oil-based 2012 Curtailed Demand Required Reserve Margin
Notes: Source of data, NGCP Daily Operation Report * Actual System Peak Demand for the Month of March 2012 for Luzon-Visayas Grid * Projected System Peak Demand for the Month of March 2012 for Mindanao Grid