Using Subsea Processing to Enable New Development and Increase Oil Recovery
Greenfield challenges:
Heavy oil Low reservoir pressure Hydrate formation
Brownfield challenges:
Declining oil & gas production Increasing water production Constrained topside facilities
25/04/2013
25/04/2013
Compression Station
Key Core Technology Areas Boosting Separation Compression Key Enabling Technology Areas Power Controls Advanced Subsea Infrastructure
4
25/04/2013 4th Ghana Summit
Boosting Station
Power
WHP
Limit of natural production with subsea water separation Boosting dp requirement Boosted production Boosting dp requirement with water separation
Flow
25/04/2013
Subsea Boosting
Main drivers:
Low pressure reservoirs Declining reservoir pressure Increasing watercut Increase and accelerate production
25/04/2013
25/04/2013
8
25/04/2013 4th Ghana Summit
Gas Compression
Main Drivers:
Decreasing reservoir pressure Maintain gas velocity to avoid liquid accumulation in flowlines Reduce need for water injection or pressure support Avoid surface installations: Subsea to beach Long step-outs possible
25/04/2013
Brownfield
Gas Compression To be installed 2015
Troll Pilot
Brownfield Gas/Oil/Water/Sand Separation Water Injection Installed 2001
Perdido
Greenfield
Pazflor
Greenfield Gas/Liquid Separation Boosting to topside Installed 2011
Marlim
Brownfield Gas/Oil/Water/Sand Separation Water Injection Installed 2012
BC-10 Ph 1 & 2
Greenfield Gas/Liquid Separation Boosting to topside Installed 2009
Greenfield
Brownfield
25/04/2013
10
Project Overview
Water Depth: Step Out: Process Capacity: MultiPhase Pump: 220 meter 12 km 200 000 bbl/day Helico-Axial 1.8 MW p 30 bar OiW 1000 ppm Sand Removal System: Max 500 kg/day
Challenges solved:
Increasing water production Declining pressure in wells Limited topside water handling capacity Sand production
SSBI Station: Height: 19 m Length: 48 m Depth: 28 m Weight: 1200 tons
25/04/2013
11
25/04/2013
12
Project Overview
Challenges solved:
Water Depth: Step Out: Process Capacity : 800 - 900 meter 14 Km 110,000 bopd and 1.0 MMSm3/d High viscosity and stable emulsion Large pressure drop in flowlines and risers High water production from year 4 Large amounts of methanol needed
Gas Tolerant Pump: Hybrid to 15% GVF 2 X 2.3 MW max p 180 bar
25/04/2013
13
14
25/04/2013 4th Ghana Summit
14
25/04/2013
15
Project Overview Water Depth: Step Out: Process Capacity : Water Injection Pump: 900 meter 5 Km 22,000 bpd, 67% W-cut 1.9 MW/p 180 bar OiW 100 PPM
Challenges solved:
Increasing water production High Viscosity Limited topside water handling
25/04/2013
16
Project Overview Water Depth: Step Out: Process Capacity : Water Injection Pump: 900 meter 5 Km 22,000 bpd, 67% W-cut 1.9 MW/p 180 bar OiW 100 PPM
Challenges solved:
Increasing water production High Viscosity Limited topside water handling
25/04/2013
17 17
25/04/2013
18
Marlim
25/04/2013
19
Marlim
25/04/2013
20
FMCs Vision
All Subsea
Thank You!