Introduction Cigr Study Committee B5

CIGRE Study Committee B5 Protection and Automation


Iony Patriota de Siqueira, D.Sc.
Chairman of Cigre SC B5 iony@tecnix.com.br

Outline Cigr Study Committee B5

Cigr Study Committee B5 Protection and Automation


Organization and Objectives Current Roles and Activities Future Challenges and Strategies

CIGR Mission Cigr Study Committee B5


International Council on Large Electric Systems Permanent non-governmental & non-profit association

Cigr

Mission

Exchange of engineering knowledge and information Synthesize state-of-the-art world practices about Electric Systems

CIGR Strategic Directions Cigr Study Committee B5

Cigr Organization Cigr Study Committee B5


General Assembly

Administrative Council

IEEE, IEC, UCTE, CIRED WORLD ENERGY COUNCIL EURELECTRIC

Steering Committee

Technical Committee

SC
A Components B Subsystems

Study Committees
C Systems D Support

CIGR Study Committees Cigr Study Committee B5


Components A1 - Rotating Electrical Machines A2 - Transformers A3 - High Voltage Equipment B1 - Insulated Cables B2 - Overhead Lines B3 - Substations B4 - HVDC and Power Electronics B5 - Protection and Automation C1 C2 C3 C4 C5 C6 System Economics and Development System Control and Operation System Environmental Performance System Technical Performance Power Supply Regulation and Trading Distribution System and Dispersed Generation

Subsystems

Systems

Support

D1 - Materials and Technologies for Power Systems D2 - Information Systems and Telecommunication

Study Committee B5 Scope Cigr Study Committee B5

Principles, design, application and management

Of power system protection, substation control, automation, monitoring, recording and metering

Including associated internal and external communications and interfacing for remote control and monitoring

Study Committee B5 Clients Cigr Study Committee B5

Top and medium management and technical staff of utilities, suppliers and consultants

Universities and Research Centers

Young engineers

Standardization Organizations

Study Committee B5 Organization Cigr Study Committee B5

Study Committee B5 Country Members Cigr Study Committee B5


25 Members 16 Observers
Greenland

Iceland Sweden Norway Canada


Estonia United Kingdom Latvia Denmark Lithuania Belarus
Netherlands

Russia Finnland

Ireland Germany
Belgium Luxemburg Czech Republic Slovakia Austria

Poland Ukraine
Moldawia Romania

Kazakhstan Mongolia

France

Switzerland

Hungaria

Slovenia

Croatia Bosnia-Herzegovina

Italy

Serbia Montenegro Albania Bulgaria Macedonia Georgia Armenia Azerbaijan Usbekistan Kirgistan

USA

Portugal

Spain

Greece

Turkey
Cyprus Lebanon Syria

Turkmenistan

North Korea
Tadschikistan

Tunesia Marocco Algeria Mexico


Cuba Haiti Dominican Republic Jamaica Puerto Rico Belize Honduras Nicaragua Costa Rica Panama Trinidad

South Korea Iraq


Jordan Kuwait Israel

Japan

Iran

Afghanistan

China

Pakistan
Qatar United Arab Emirates

Nepal

Libya

Egypt Saudi-Arabia

Bhutan

West Sahara Mauretania


Senegal Gambia Guinea-Bissau Guinea Sierra Leone French-Guayana Liberia

India

Bangladesh

Taiwan Laos Vietnam Philippines


Brunei

Oman

Mali
Burkina Faso Benin

Niger Chad Sudan Nigeria


Central Africa Cameroon Gabun Congo Uganda Kenya Eritrea
Dschibuti

Myanmar

Guatemala El Salvador

Yemen

Thailand

Cambodia Sri Lanka Malaysia

Venezuela Columbia

Guyana Surinam

Ivory Coast Ghana Togo

Ethiopia

Somalia

Ecuador

Zaire

Rwanda Burundi

Indonesia Papua-New Guinea

Tanzania Peru Brazil Bolivia Namibia Paraguay


Zimbabwe Botswana

Angola Sambia
Malawi Mozambique

Madagascar

Australia
Swaziland

South Africa
Lesotho

Uruguay Argentina Chile New Zealand

Current Roles and Activities

Cigr Study Committee B5

Cigr Study Committee B5 Current Roles and Activities


Issues in Substation Automation Issues in Protection and Monitoring New Network Requirements

Current Issues in Substation Automation Cigr Study Committee B5


Issues Actions PS1 2011: IEC 61850: Which tools for which user Tutorial 2011: IEC 61850 Moving towards Edition 2 PS1 2012: Impact of Future Network on PAC IEC 61850 - Widespread application and acceptance Experience - Lack of utility knowledge in new technologies Documentation - Deficiencies in reference material Training Lack of reference tutorials Testing - New requirements for comissioning and maintenance

Working Groups

WG B5.39: Documentation Requirements for DSAS WG B5.42: Experience Concerning Availability and Reliability WG B5.45: Acceptance, Commissioning and Field Testing WG B5.40: Education in PAC Systems WG B5.50: IEC 61850 Expectations from Stakeholders JWG.B5.C6.CIRED.26 PAC of Distribution Systems

Current Issues in Protection and Monitoring Cigr Study Committee B5


Issues FACTS & HVDC Requirements and impacts on protection Special equipments Protection requirements New Sensors Modeling and transients

Actions PS2 2009: Protection and Control of FACT Devices PS1 2010: PAC for the next decade PS2 2011: Protection of Hybrid Line/Cable Circuits Working Groups WG B5-23: Short Circuit Protection of Mixed Conductor Networks JWG B5/B4/C4-25: Impact of HVDC Station on AC Protection WG B5-37/49: PAC of Shunt Reactors & Shunt Capacitors WG B5-24: Transients on V & I Digital Acquisition Chain WG B5-27: Benefits of Standardized Protection Schemes WG B5-36: Application for Protection Schemes Based on IEC61850 WG B5.44: Protection Schemes for Special Transformers

Current Issues in New Network Requirements Cigr Study Committee B5


Issues WAMPS New requirements and impacts Metering New market demands and smart grids Management Coordination of Protection settings

Actions

PS1 - 2009: Strategies for the life time maintenance of SAS PS2 2010: Impact of Renewable Generation on PAC PS3 - 2011: Performance of Protection Systems Whilst the Network is under Stress PS2 2012: Utilization & Application of Remote Access

Working Groups

WG B5-14: Wide Area Protection & Control Technologies WG B5.41: Metering Systems for Billing Purposes WG B5.43: Coordination of P & C of Future Network WG B5.51: Application of SAS Remotely Accessed Information JWG.B5.C6.CIRED.25 Protection of Distribution Systems with DER

Study Committee B5 Working Groups Cigr Study Committee B5


Study Committee B5 Working Groups

Substation Automation
39 - Documentation Requirements - R. Hughes (AU) 42 - Availability and Reliability M. Petrini (IT) 45 - Commissioning and Field Testing - E. Cahuet (FR) 50 - IEC 61850 Expectations from Users - H.Grgory (BE)

Protection & Monitoring


23 - Protection of Mixed Conductor - L. Uyttersprot (BE) 24 Transient in Digital V & I Acquisition - Z. Zakonjsek (RU) 27 - Standardised Protection Schemes A. Apostolov (US) 37 - Protection of Shunt Reactors - P. Naisani (CA) 40 - Education in Protection & Control - M. Kezunovic (US)

New Network Requirements


14 Wide Area Protection & Control - V. Terzija (GB) 41 Metering for Billing Purposes - R. Adams (GB) 43 - PAC for Future Network - M. Adamiak (US) 51 Application of SAS Remotely Accessed Information L. Li (CN)

B5/C6.26/CIRED
26 - Automation of Distribution Future Networks - G. Mauri (IT)

44 - Protection of Special Transformers - Z. Gajic (SE) 47 - Protection Performance Audits - P. Watson (GB) 48 - Protection with Limited Fault Current - B. Su (CN) 49 - Protection of Shunt Capacitors - S. Chano (CA)

JWG B5/D2
46 Cyber Security for PAC D. Holstein (US)

JWG B4/B5
59 - Control and Protection of HVDC Grids K. Koreman (NL)

C6.25/B5/CIRED
25 - Protection of Distribution System with DER - P. Myrda (US)

Future Challenges and Strategies Cigr Study Committee B5

Future Challenges and Strategies


The Network of the Future The Future of Protection and Automation Challenges for Engineers and Managers

Current Structure of Electrical Grids Cigr Study Committee B5

Segregation

Generation

Transmission

Distribution

Consumer

One-way flow

Future Network Cigr Study Committee B5


Distributed Resources Photo Voltaic Virtual Power Plant Distributed Resources Virtual Power Plant Wind Power

Small Hydro Stirling Machine Nuclear Power Battery Storage Geo Thermal Power Cell
Heat

Fuel Cell Combined Cycle Combustion Turbine Reciprocating Engine Tidal Power

A to du r

Mega SmartGrid Two-way flow

Generation Transmission

Distribution Consumers Power Cell

Engineering Education Cigr Study Committee B5


Management Science Network Software Engineering Engineering Electrical Protection Automation Engineering Engineering Engineering

SC B5 Future Colloquia and Discussion Sessions Cigr Study Committee B5


Brazil 2013 2013 Preferential Subjects PS1 - Acceptance, Commissioning and Field Testing for Protection and Automation Systems PS2 - Experience and prospective of protections & automation connected to Non NonConventional Instrument transformers PS3 - Protection, Monitoring and Control of Shunt Reactors and Special Transformers
France 2014 Preferential Subjects PS1 - New protection and automation schemes based on enhanced communication possibilities PS2 - Expectations from stakeholders about IEC 61850

Thank you Cigr Study Committee B5

Thank you!
Iony Patriota de Siqueira, D.Sc.
Chairman of Cigre SC B5 iony@tecnix.com.br