1 Comments Concrete mix designs is best defined as a process in selecting suitable ingredients, which is cement, aggregate, sand and

water, and determining their relative proportions to give the required strength, workability and durability. A design mix, which is a performance specification stating required strength and minimum cement content but leaving the grading and details of the mix design to be work out.

Objective of Mix Design

Concrete Mixer Drum type 140L Two main objectives for concrete mix design:

To determine the proportions of concrete mix constituents of; Cement, Fine aggregate (or normally Sand), Coarse aggregate, and Water. To produce concrete of the specified properties. To produce a satisfactory of end product, such as beam, column or slab as economically as possible.

Theory of Mix Design

The Process of Mix Design The method of mix design applied here is in accordance to the method published by the Department of Environment, United Kingdom (in year 1988). There are two categories of initial information required: 1. Specified variables; the values that are usually found in specifications. 2. Additional information, the values normally available from the material supplier. Reference data consists of published figures and tables is required to determine the design values including;

Mix parameters such as target mean strength, water-cement ratio and concrete density. Unit proportions such as the weight of materials.

The design process can be divided into 5 primary stages. Each stage deals with a particular aspect of the mix design: Stage 1: Determining the Free Water/ Cement Ratio i) Specify the required characteristic strength at a specified age, fc ii) Calculate the margin, M. M=kxs .. [ F1 ]

where; k = A value appropriate to the defect percentage permitted below the characteristic strength. [ k = 1.64 for 5 % defect ] s = The standard deviation (obtained from CCS 1).

CCS 1: Approximate compressive strength (N/mm2) of concrete mixes made with a freewater/cement ratio of 0.5 iii) Calculate the target mean strength, fm fm = fc + M .. [ F2 ]

where; fm = Target mean strength fc = The specified characteristic strength iv) Given the type of cement and aggregate, use the table of CCS 1 to obtain the compressive strength, at the specified age that corresponds to a free water/cement ratio of 0.5.

CCS 4: Relationship between compressive strength and free-water/ cement ratio. v) In figure CCS 4, follow the starting line to locate the curve which passes through the point (the compressive strength for water/cement ratio of 0.5). To obtain the required curve representing the strength, it is necessary to interpolate between the two curves in the figure. At the target mean strength draw horizontal line crossing the curve. From this point the required free water/cement ratio can be determined. Stage 2: Determining the Free-water Content

CCS 2: Approximate free-water contents (kg/m3) required to give various levels of workability. Given the slump or vebe time, determine the free water content from table CCS 2. Stage 3: Determining the Cement Content Cement Content = Free Water Content / Free-water or Cement Ratio .. [ F3 ]

The resulting value should be checked against any maximum or minimum value that may be specified. If the calculated cement content from F3 is below a specified minimum, this minimum value must be adopted resulting in a reduced water/cement ratio and hence a higher strength than the target mean strength. If the calculated cement content is higher than a specified maximum, then the specified strength and workability simultaneously be met with the selected materials; try to change the type of cement, the type and maximum size of the aggregate. Stage 4: Determining the Total Aggregate Content This stage required the estimate of the density of fully compacted concrete which is obtained from figure CCS 5. This value depends upon the free-water content and the relative density of the combined aggregate in the saturated surface-dry condition. If no information is available regarding the relative density of the aggregate, an approximation can be made by assuming a value of 2.6 for un-crushed aggregate and 2.7 for crushed aggregate.

CCS 5: Estimated wet density of fully compacted concrete. With the estimate of the density of the concrete the total aggregate content is calculated using equation F4: Total Aggregate Content = D C W .. [ F4 ]

where; D = The wet density of concrete ( in kg/m3) C = The cement content (in kg/m3) W = The free-water content (in kg/m3) Stage 5: Determining of The Fine and Coarse Aggregate Contents

This stage involves deciding how much of the total aggregate should consist of materials smaller than 5 mm, i.e. the sand or fine aggregate content. The figure CCS 6 shows recommended values for the proportion of fine aggregate depending on the maximum size of aggregate, the workability level, the grading of the fine aggregate (defined by the percentage passing a 600 m sieve) and the free-water/ cement ratio. The best proportion of fines to use in a given mix will depend on the shape of the particular aggregate, the grading and the usage of the concrete.

CCS 6: Recommended proportions of fine aggregate according to percentage passing a 600 m sieve. The final calculation, equation F5, to determine the fine and coarse aggregate is made using the proportion of fine aggregate obtained from figure CCS 6 and the total aggregate content derived from Stage 4. Fine Aggregate Content = Total Aggregate Content x Proportion of Fines .. [ F5 ] Coarse Aggregate Content = Total Aggregate Content Fine Aggregate

Procedures of Mixing
Production of Trial Mix 1. The volume of mix, which needs to make three cubes of size 100 mm is calculated. The volume of mix is sufficient to produce 3 numbers of cube and to carry out the slump test. 2. The volume of mix is multiplied with the constituent contents obtained from the mix design process to get the batch weights for the trial mix. 3. The mixing of concrete is according to the procedures given in laboratory guidelines. 4. Firstly, cement, fine and course aggregate are mixed in a mixer for 1 minute. 5. Then, water added and the cement, fine and course aggregate and water mixed approximately for another 1 minute. 6. When the mix is ready, the tests on mix are proceeding.

Slump Test apparatus for Concrete Workability Tests on Trial Mix 1. The slump tests are conducted to determine the workability of concrete. 2. Concrete is placed and compacted in three layers by a tamping rod with 25 times, in a firmly held slump cone. On the removal of the cone, the difference in height between the uppermost part of the slumped concrete and the upturned cone is recorded in mm as the slump.

3. Three cubes are prepared in 100 mm x 100 mm each. The cubes are cured before testing.

The procedures for making and curing are as given in laboratory guidelines. Thinly coat the interior surfaces of the assembled mould with mould oil to prevent adhesion of concrete. Each mould filled with two layers of concrete, each layer tamped 25 times with a 25 mm square steel rod. The top surface finished with a trowel and the date of manufacturing is recorded in the surface of the concrete. The cubes are stored undisturbed for 24 hours at a temperature of 18 to 220C and a relative humidity of not less than 90 %. The concrete all are covered with wet gunny sacks. After 24 hours, the mould is striped and the cubes are cured further by immersing them in water at temperature 19 to 21oC until the testing date. 4. Compressive strength tests are conducted on the cubes at the age of 7 days. Then, the mean compressive strengths are calculated.

The Calculations
Here is one example of calculation from one of the mix design obtained from the laboratory. We have to fill in all particulars in the concrete mix design form with some calculations

CCS 3: Relationship between standard deviation and characteristic strength. Firstly, we specified 30 N/mm2 at 7 days for the characteristic strength. Then, we obtained the standard deviation, s from the figure CCS 3. So, s = 8 N/mm2. From the formula F1, k = 1.64 for 5 % defect. The margin, M is calculated as below: M = k x s = 1.64 x 8 = 13.12 N/mm2 With the formula F2, target mean strength, fm is calculated as below: Target mean strength, fm = fc + M = 30 + 13.12 = 43.12 N/mm2 The type of cement is Ordinary Portland Cement (OPC). For the fine and course aggregate, the laboratorys fine aggregate is un-crushed and for coarse aggregate is crushed before producing concrete.

Then, we obtain the free-water/ cement ratio from table CCS 1. For OPC ( 7 days ) using crushed aggregate, water/cement ratio = 36 N/mm2. After that, from the figure CCS 4, the curve for 42 N/mm2 at 0.5 free-water ratio is plotted and obtained the free-water ratio is 0.45 at the target mean strength 43.12 N/mm2. Next, we specified the slump test for slump about 20 mm and the maximum aggregate size we used in laboratory is 10 mm. For the specified above, we can obtained the free-water content from table CCS 2 at slump 10 30 mm and maximum size aggregate 10 mm, the approximate free-water content for the un-crushed aggregates is 180 kg/m3 and for the crushed aggregates is 205 kg/m3. Because of the coarse and fine aggregates of different types are used, the free-water content is estimated by the expression: Free-water Content, W = 2/3 Wf + 1/3 Wc = (2/3 x 180) + (1/3 x 205) = 188.33 kg/m3 where, Wf = Free-water content appropriate to type of fine aggregate Wc = Free-water content appropriate to type of coarse aggregate Cement content also can obtained from the calculation with the expression at F3: Cement Content, C = Free Water Content / Free-water or Cement Ratio = 188.33 / 0.45 = 418.52 kg/m3 We assumed that the relative density of aggregate (SDD) is 2.7. Then, from the figure CCS 5 with the free-water content 188.33 kg/m3, obtained that concrete density is 2450 kg/m3. The total aggregate content can be calculated by: Total Aggregate Content = D C W = 2450 418.52 188.33 = 1843.15 kg/m3 The percentage passing 600 m sieve for the grading of fine aggregate is about 60 %. The proportion of the fine aggregate can be obtained from the figure CCS 6, which is 38 %. Then, the fine and course aggregate content can be obtained by calculation: Fine Aggregate Content = Total Aggregate Content x Proportion of Fines = 1868.74 x 0.38 = 700.40 kg/m3 Coarse Aggregate Content = Total Aggregate Content Fine Aggregate = 1843.15 700.40 = 1142.75 kg/m3 The quantity per m3 can be obtained, which is; Cement = 418.52 kg

Water = 188.33 kg Fine aggregate = 700.40 kg Coarse aggregate (10 mm) = 1142.75 kg The volume of trial mix for 3 cubes = [(0.1 x 0.1 x 0.1) x 3] + [25% contingencies of trial mix volume] = 0.006 + 0.00075 = 0.00375 m3 The quantities of trial mix = 0.00375 m3, in which is; Cement = 1.57 kg Water = 0.71 kg Fine aggregate = 2.61 kg Coarse aggregate (10 mm) = 4.29 kg The Results of Mix Design Slump Test = True Slump of 55 mm All the 3 concrete cubes produced were then cured for 7 days. After that, the compressive cube test is carried out. The results are as follows: Sample Compressive Strength Average 1 2 3 32.37 33.54 35.70 (32.37 + 33.54 + 35.70) / 3 = 33.87

For cubes after 7 days of curing, compressive strength should not be less than 2/3 target mean strength. = 2/3 43.12 = 28.75 N/mm2 < 33.9 N/mm2 After 7 days of curing, the compressive strength of concrete cubes produced by the mix design method pass the specific strength requirements.

Discussions Upon Mix Design


Although our compressive strength passes the specific requirements, we still identified several factors which contribute to the lacking of compressive strength of concrete mixes produced in the experiment. However, the main factor is the condition of aggregates whether it is exposed to sunlight or rainfall. When the free water/cement ration is high, workability of concrete is improved. However, excessive water causes honey-comb effect in the concrete produced. The concrete cubes become porous, and hence its compressive strength is well below the design value. Other possible reasons include over compaction, improper mixing methods and some calculation errors.

Few suggestion upon several steps to avoid the problems previously faced:

All the raw materials, which is cement, aggregates, and sand should be protected from precipitation or other elements which may affect its physical properties. The quantity of ingredients may be adjusted if necessary, theoretical values are not always suitable. For example, if the aggregates are wet or saturated, less amount of water should be added, vice versa. Compaction should be done carefully, as either under or over-compaction will bring significant negative effect on the concrete produced.

The Conclusion
1. By using the concrete mix design method, we have calculated the quantities of all ingredients, that is water, cement, fine and coarse aggregate according to specified proportion. 2. The concrete produced did not fulfill the compressive strength requirements due to several reasons. Furthermore, some steps mentioned above should be taken into consideration to overcome this problem. Standard reference for the mix design is as accordance to British Standard; BS 5328: 1981 : Methods of Specifying Concrete including Ready-Mixed Concrete

WHAT IS CONCRETE Concrete is the product of mixing, aggregate, cement and water. The setting of concrete is a chemical reaction between the cement and the water, not a drying process. This reaction is called hydration, it evolves heat as does any chemical reaction, and the process is irreversible. There is an initial set when the concrete will cease to be liquid but have little strength (e.g. 6 to 24hrs. old), thereafter the concrete will gradually gain strength over time until it achieves the strength required. Differing mix proportions and cement types will achieve required strengths in differing time spans. CONSTITUENTS OF CONCRETE Cement, Aggregate and Water, (and sometimes additives). Aggregate Aggregates are usually distinguished between fine and coarse aggregate. Aggregates are classed as inert materials, such as washed natural sand (fine); and natural gravel, which can be crushed to produce the appropriate size and grading of aggregate, and similarly crushed, quarried stone (coarse).

The aggregate must have a minimum inherent strength requirement for structural concrete, the coarse aggregate must not be weaker than the concrete paste. All aggregate must be "clean", i.e. not contaminated with organic matter or clay/silty soils and overburden during extraction and storage. Cement Basically a material made by heating limestone and a suitable clay to produce a clinker rich in calcium silicates. This clinker is ground to produce a fine powder, this is cement. By using different clinkers, grinding them to differing degrees of fineness and the use of additives many different types of cement are produced with varied properties in their use, e.g. rapid hardening cement, sulphate resisting cement, etc.. Generally speaking the more cement in a mix the stronger more durable the concrete produced will be, but this does have to be related to other factors, primarily the amount of water used in the mix, i.e. water/cement ratio. Water Water is an extremely important part of concrete, and drinking quality water is usually required, or water from an approved source free from impurities. Additives The most commonly used additive is a "foaming" agent to produce air entrained concrete, mainly for carriageway concrete, but also other exposed situations. Another common use of an additive is to increase the workability of concrete without adding extra water and thus increasing the water/cement ratio and decreasing the strength of the concrete. TIME TAKEN TO PLACE CONCRETE AFTER BATCHING From the time of adding water to the cement the chemical reaction has begun and you only have a limited amount of time to place and compact the concrete, this is usually specified as 90 minutes. The delivery ticket of the load of concrete will be stamped with the time of batching. ADDITION OF WATER Given a set amount of cement and aggregate there is an optimum amount of water to be added to produce a chemical reaction to give the maximum obtainable strength, too little or too much water will produce a weaker concrete. Unfortunately as in all things, life is not that simple, and the workability of the concrete has to be considered when placing concrete, especially in difficult situations. These situations can be areas of high density of reinforcing bars, complicated formwork design, or where the concrete needs to be suitable for pumping. In these situations water content is increased to make the concrete more workable, BUT this increase in water content is calculated at the design stage and the cement content is increased accordingly to retain the strength of the mix. For every designed concrete mix with a specified strength there is a set WATER:CEMENT RATIO which must be retained in order to achieve the designed strength. WATER SHOULD NEVER BE ADDED TO CONCRETE, ESPECIALLY ON SITE, WITHOUT THE CONSIDERATION OF ALL THE ABOVE POINTS, AND THE APPROVAL OF THE ENGINEER CONCRETE WORKABILITY An on site simple test for determining workability is the SLUMP TEST.

This consists of a conical mould 300mm. high, with an opening at the top of 100mm. diam., and at the bottom of 200mm. diam.. The mould is filled with concrete in 4 layers and rodded to remove air voids, with the smaller orifice uppermost. The "slump" is the difference in height between the height of the mould and the height of the concrete column with the mould removed. The workability of the concrete will depend upon the situation into which the concrete is being placed. Low workability, i.e. stiff concrete, is needed for carriageway concrete which is laid by a "paving train". High workability concrete is needed in situations of high density of reinforcing steel to enable the concrete to flow around all the reinforcing without leaving any voids. SPECIFYING CONCRETE STRENGTH The strength/grade of concrete is specified and measured in newtons/sq. mm., meganewtons/sq. metre or even megapascals, in fact the numerical figure will be the same in each case. E.g. a strength of 20 newtons/sq.mm. is the same as 20 meganewtons/sq.metre. The strength/grade of concrete is normally specified by stating the strength you wish the concrete to achieve after a period of 28 days. The specifications governing the design, use and testing of concrete have undergone tremendous changes in the lat few years, I will not go into this topic on this page other than to say you may like to be aware of the introduction of, BS 8500-1:2002:Concrete - Complementary British Standard to BS EN 206-1 Part 1 : Method of specifying and guidance for the specifier BS 8500-2:2002:Concrete - Complementary British Standard to BS EN 206-1 Part 2 : Specification for constituent materials and concrete These are British Standards that have been published to help you understand, the current standard for concrete, which is, BS EN 206 - 1 : Concrete : Part 1 : Specification, performance, production and conformity and it is likely that you will need the help of BS 8500, even then it may prove difficult to understand BS EN 206. It is not a "user friendly" document. MEASURING CONCRETE STRENGTH The strength is measured by crushing concrete cubes to failure and recording this strength. Concrete cubes are made from fresh concrete sampled at the time of pouring by placing correctly sampled concrete into a steel mould and compacting to remove air voids. The concrete is allowed an initial "set" period of 24 hours, the mould is then stripped and the cube is cured in water at a temperature of 20 deg.c for 28 days prior to crushing. If you wish to strike shuttering before 28 days, extra cubes will be required to determine that the in-situ concrete has achieved the appropriate strength at the time you wish to strike the shuttering. This is usually an arrangement agreed by the contractor, the concrete supplier and the engineer. SAMPLE CONCRETE MIXES, FOR GUIDANCE ONLY (but you will be able to understand them) Below are a number of different types of concrete mixes showing batch weights and cement contents when a particular source of clean crushed river gravel and sand where used, so they are only an indication of concrete composition and will

not be suitable for all aggregates / sand / cement. I have included this item because of what I believe is the lack of basic concrete information that is readily available to young engineers and engineering technicians wishing to improve their working knowledge of concrete. These mixes are in fact concrete mixes produced to comply with the Specification for Road and Bridge works of 1963, i.e. still current in 1969 to 1972 while I was working on the M6 Link for Owen Williams and Partners. Back in this period, when I was beginning my career in highways materials, specifications and British Standards were written in such a way that basic information regarding concrete could be obtained from them, and they were my original learning tool. It is my opinion that this is no longer the situation with current specifications and standards hence the publication of BS 8500, Parts 1 & 2, and I would not regard these as particular user friendly for a "beginner". Basic concrete mixes are basic concrete mixes, and these are examples of basic concrete mixes. I know things have moved on, and there are now many types of cement, admixtures and fibres that produce enhanced concrete for particular uses, and that you do need to take into account the density of the aggregates, and the workability of the produced concrete, the source/chemical composition of the aggregate, etc., etc.. But remember this is "The Idiot's Guide to Highways Maintenance", and this is some basic information to assist those who want to know a little bit more about concrete for basic on site uses, and possibly minor structures. For most uses you will be buying your ready mixed concrete from an established supplier to an appropriate, modern, specification, but it does not hurt to have some knowledge of what you are buying and how it was produced. I have used the original broad descriptions (e.g. A) used in this specification to describe the types of concrete, each type having a particular use with regard to required strength, workability and cost to produce. These mixes were used in the Longford Viaduct and the Bedworth Viaduct, and the many other large structures on Contract 11, and the last time I looked they were all still standing, so I have confidence to reproduce them here. NOTE : I have quoted the quantities in LBS. and GALLONS (the original measures) as well as converting them to metric quantities, and S.I. units for strength, although I remain with meganewtons not megapascals, they are the same figures. If you do wish to use these quantities as a basis for determining your own batching weights, you MUST note that these figures will only give you a cubic yard of mixed concrete NOT a cubic metre, and if the density of your aggregates are different to the aggregates used in these mixes you may get slightly less or slightly more than a cubic yard. To save you looking it up, 1 cubic yard of concrete = 0.7646 cubic metres. As with any new concrete mix you must take cubes and crush them at appropriate dates to determine the real strength of the concrete you have designed / produced, only then can you consider using it in the works /structure, and you should expect to attain the Preliminary strengths in your trials to ensure the Works strength for normal production. The cement used in these "standard" mixes was OPC (Ordinary Portland Cement), and the strengths quoted are for 150mm. (6 inch) cubes crushed at 28 days. And do not forget to weigh your cubes and determine the density, as density is a good indication of a well designed concrete, and if you have crushed as many concrete cubes as I have, you will have noted that for each "mix", cube making and curing being constant, the cubes with the highest density will give the highest strengths.

Surface Dry Batch Weights for a number of Classes of Concrete

Strength (Mn Aggregate Agg. lbs/in) Concrete Cement Sand Water/Cement /Cement Class (kgs/lbs) (kgs/lbs) 20mm.- 40mm.Ratio Ratio PreliminaryWorks 5mm. 20mm. 29.0 / 327 / 408 / 975 / A 38.5 / 5600 4.25 0.52 4200 720 900 2150 26.0 / 281 / 458 / 975 / B 34.5 / 5000 5.1 0.49 3750 620 1010 2150 20.5 / 218 / 517 / 975 / C 27.5 / 4000 6.85 0.62 3000 480 1140 2150 168 / 472 / 454 / 630 / E1 N/A N/A 9.3 0.78 370 1040 1000 1390 41.5 / 340 / 395 / 975 / Y 52.0 / 7500 4.1 0.51 6000 750 870 2150 10mm.5mm. 1279 / 840 / 2820 1850

52.0 / 7500

41.5 / 6000

371 / 820

5.7

0.45

The amount of "free" water added to the above aggregate is based on the water cement ration and the moisture contents of the aggregates, especially the sand. That is why batching weights are initially given as "surface dry", you then determine the total amount of "free" water by applying the water cement ration to the quantity of cement. E.g. the water cement ratio for the concrete mix below is 0.45, water cement = 0.45

Therefore:- weight of water = weight of cement x 0.45 = 371 x 0.45 kgs. = 167kgs./litres (near enough for the purposes of demonstration) To better indicate this I include below a reproduction of a batching chart for Y concrete used at a concrete batching plant, i.e. as the moisture content of the aggregate, usually the sand, increases the added water decreases. However at times of heavy rainfall and with smaller aggregate the coarse aggregate can retain sufficient water that it needs to be taken into account, especially with high strength concrete. This indicates the importance of knowing the moisture content of the sand in the stockpiles, and often in the different levels of the stockpile.

Sand Moisture 10mm. Crushed Content % Gravel

Sand

Added "free" Water

Cement

0 1 2 3 4 5 6 7 8 9 10

840kgs. / 1850lbs. " " " " " " " " " "

1271kgs. / 2801lbs. 1284kgs. / 2830lbs. 1297kgs. / 2860lbs. 1309kgs. / 2885lbs. 1320kgs. / 2910lbs 1334kgs. / 2940lbs. 1347kgs. / 2970lbs. 1359kgs. / 2995lbs. 1372kgs. / 3025lbs. 1383kgs. / 3050lbs. 1397kgs. / 3080lbs.

168litres / 36.5galls 155litres / 34.0galls. 141litres / 31.0galls. 130litres / 28.5galls. 118litres / 26.0galls. 105litres / 23.0galls. 91litres / 20.0galls. 77litres / 17.0galls. 66litres / 14.5galls. 52litres / 11.5galls. 40litres / 9.0galls.

371kgs. / 820lbs. " " " " " " " " " "

Potrebbero piacerti anche