Bakreswar Thermal Power Project System Layout
400kV
IBT-1
220kV
DVC
DPL 220kV
G1
BS-1
G6 G2 Jeerat IBT-2
G3
DPL 132kV G
BS-2
05:23:56.694
05:23:56.695
The remote end breaker i.r.o.Bidhannagar ckt-1 did not tripped and this ckt also parallely feed the fault. From available Aux.relay operation list in GCR log as well as event report of DLP -only A pole got trip. But from the fault report it has been observed a BCph- Ground Fault.Disturbance waveform for exact picture couldnot be retreived from the Relay as the required software not yet been installed. 400/220/33kV IBT-1trip coil energized on Dirctional This Ckt bkr should not tripped.After testing it has been observered that Relay Backup E/F Relay (DFP) operation timming co-ordination w.r.t Feeder was not correct. However it has been rectified. 400/220/33kV IBT-2trip coil energized on Dirctional This Ckt bkr should not tripped.After testing it has been observered that Relay Backup E/F Relay (DFP) operation timming co-ordination w.r.t Feeder was not correct. However it has been rectified. BkTPP-Bidhannagar Ckt-1 A Pole close coil energized This reclosing of A Pole was not wanted ,but on checking no problem found in on Auto-Reclose Relay (MRS2000) operation the relay BkTPP-Bidhannagar Ckt-1Tripped Through Backup E/F Finally, the Breaker Three-Pole tripped through this relay. Relay (DFP)
Note: IBT 1 & 2 Over-fluxing relay has been operated at 220kV Bus side. Time of operation in question of tripping of IBTs through overfluxing could not be ascertained as (1) Overfluxing relay operating contact not extended to SOE-this is per scheme. (2) 220kV Bus voltage trend curv during the incident could not have been retreived as DAS Computer failed to due to the long time power interruption(beyond UPS capacity). 05:31:54.597 05:36:22.613 05:37:45.171 05:56:29.725 33kV Bus Sec-2 Opened 06:53:55.398 (Swapan Maity) Unit-1 Gen Ckt Bkr.-Tripped Unit-2 Gen Ckt Bkr.-Tripped Unit-3 Gen Ckt Bkr. Tripped 33kV Bkr of IBT-2 Opened Station Aux. Power Failure Station Aux. Power Failure Station Aux. Power Failure IBT-2 may be charged earlier to this time but cause of this Bkr opening not is not clear.As per record of GCR(message to CLD) IBT-1 & IBT-2 was normalised at 06:40hrs This is the time Aux. Power supplied to Power House through IBT-2 & ST-2. Before this Aux Power to ST-2 may have been extended from ST3(220/33kV).Time of extention not known. (M.K.Mitra)
UNIT-2
6.6kV 1SA 08 6.6kV OSC
07
Existing Source
OXB
I/C-2 SEC-B
SEC-A
IA-1
SA-1
IA-2
SA-2
Compressor Motor
2
6.6kV STN. SWGR -OSA07 (Existing)
LPB Station
LT Switchgear Incommer-1
DAS Panel
6.6kV Existing Cable 6.6kV New Cable 415V New Cable (2.5 mm2) 415V Existing Cable(2.5mm2) to be Removed Twisted pair 0.5sqmm DAS cable(New) Twisted pair 0.5sqmm DAS cable(Existing) to be removed
Cable to be laid & terminated ID No Cable Specification From 1 6.6kV grade power cable 3C/185sqmm XLPE
To
OSA07 2 1.1Kv grade PVC control cable cu 2.5sqmm, 7C,7C,7C,5C & 3C 3 1.1Kv grade PVC control cable cu 2.5sqmm, 7C 4 1.1kV grade PVC control cable cu,2.5sqmm,5C 5 1.1kV grade PVC control cable cu2.5sqmm 7C 6 Twisted pair signalling cable 0.5sqmm cu,2P & 2P
1SA08
UACB
1SA08
Tr M Box 1SA08
LPB Stn
1SA08
Rate 60/- per mtr, Glanding 800/including supply 10/-per mtr, 80/per glanding including supply of Gland, making panel hole 10/- each
Length
50mtr
Remarks Straight through joint has be made with existing cable at the point beneath the existing swgr panel(OSA) New cable have to laid
Amount 3800/-
170mtrX6 New cable have to laid 210mtr New cable have to laid 210mtr New cable have to laid
OPA-01
1SA08
CVP06
1SA08
200mtrX2 Total
HT Cable Termination & Jointing Supply of Swgr "End Termination Kit"-01 no Rs. and "Staight-Through Jointing Kit"-01 no Rs. All the job related upto termination ,-HT cable straight-through/jointing, HT cable terminating at SWGR end, including supply of terminating accessories of LT are to be in the scope of work. Cable to be disconnected & dismantalling sealing of cable hole From To Tr. M.Box OSA swgr Panel-07 SACB Panel OSA swgr Panel-07 LPB station OSA swgr Panel-07 DAS panel OSA swgr Panel-07 LT swgr I/C-1(OPA) OSA swgr Panel-07 Control Panel Modification 1. Panel cutout, fixing & related wiring of Ammeter-01 no , Amp. Sel. Sw-01 no,Bkr. Control Sw.-01 no, Indication Lamp-03 no,Aux relay -01 no,Annuncition modification, Al. strip for MIMIC diagram as per scheme. Total Rs.2000/(LS)
Cable description 01 no 05 no 01 no 02 no 01 no
Rs. 1000/(LS)
Commissioning:
Material required to be supplied by WBPDCL AA. 1 2 3 4 5 AB 1 2 3 4 AC 1 2 3 4 5 6 AD Cable: Description & Specification Length 3C/185sqmm HT XLPE 50mtr 7C/2.5sqmm LT Control 930mtr 5C/2.5sqmm LT Control 340mtr 3C/2.5sqmm LT Control 150mtr 4C/0.5sqmm Twisted Pair 400mtr Flexible Wire Description & Specification Length 2.5sqmm flexible wire cu RED 01 coil 2.5sqmm flexible wire cu YELLOW01 coil 2.5sqmm flexible wire cu BLUE 01 coil 2.5sqmm flexible wire cu GREY 01 coil Additional equipments for Control Panel Description & Specification Ammeter CTR-200/1,96X96mm Ammeter Selector Switch(SRP136MA60/GB) Breaker Control Switch(BCC03P016E67) Indication Lamp assembly RED Indication Lamp assembly AMBER Indication Lamp assembly GREEN HT Cable(3C/185 XLPE) Termination Kit HT cable Straight Through Jionting Kit
6Pair
Item Code 04C010045 04C010051 04C010010 04C010029 06C010004 06C010007 04C010041 04C010039 04C010038 04C010047
Qty 01 no 01 no 01 no 01 no 01 no 01 no 01 no 01 no
09 no 23 no 07 no 44 no 44 no 44 no
Existing Source
OXC Modified Source I/C-1 B/C 415V OPB IA-1 SA-1 IA-2 SA-2 Compressor Motor
OXD
I/C-2 SEC-B
SEC-A
LPB Station
Straight Thro'
LT Switchgear Incommer-2
DAS Panel
6.6kV Existing Cable 6.6kV New Cable 415V New Cable (2.5 mm2) 415V Existing Cable(2.5mm2) to be Removed Twisted pair 0.5sqmm DAS cable(New) Twisted pair 0.5sqmm DAS cable (Existing) to be removed
6.6kV Existing Cable 6.6kV New Cable 415V New Cable (2.5 mm2) 415V Existing Cable(2.5mm2) to be Removed Twisted pair 0.5sqmm DAS cable(New) Twisted pair 0.5sqmm DAS cable(Existing) to be removed SCOPE OF WORK : Cable laying, Termination of New cable and Dismantling of Old cable 1. XLPE Powe cable ( 6.6kV 3C/185 sqmm ) Laying, Straight-through jointing ( One no ) and End termination with Glanding at Swgr End. 2. Control Cable ( 1.1kV grade 2.5 sqmm PVC cu ) laying, Glanding, Termination and and also dismantling of old spare cables. 3. Twisted pair Signalling cable ( 0.5 sqmm cu ) Laying, Straight-through jointing, Glanding and Termination at Swgr. Note: Disconnecting and dismantling all spare old cables and sealing of old cable holes. Control panel Modification Job Panel Cut-out, Fixing and related wiring of Ammeter - 01 no, Ammeter Sel. Sw. - 01 no., Indication Lamp - 03 no, Aux. Relay - 01 no., Brk. Control Sw. - 01 no., Annunciation modification, Al strip for MIMIC diagram as per scheme.
HT(6.6kV) source to the Transformer(OXD) primary has to be changed from existing Station
Transform
Existing Source
OXC Modified Source I/C-1 B/C 415V OPB IA-1 SA-1 IA-2 SA-2 Compressor Motor
OXD
I/C-2 SEC-B
SEC-A
LPB Station
Straight Thro'
LT Switchgear Incommer-2
DAS Panel
6.6kV Existing Cable 6.6kV New Cable 415V New Cable (2.5 mm2) 415V Existing Cable(2.5mm2) to be Removed Twisted pair 0.5sqmm DAS cable(New) Twisted pair 0.5sqmm DAS cable(Existing) to be removed CABLING JOB XLPE Power cable (6.6kV 3C/185sqmm) Laying , straight-through jointing(one no.) and End terminaion with glanding at Swgr. Control Cable (1.1kV grade 2.5 sqmm PVC cu ) laying, Glanding & Termination Twisted pair Signalling cable(0.5sqmm cu) laying straight-through jointing,Glanding & Termination at Swgr. CONTROL PANEL MODIFICATION JOB Panel Cut-out ,Fixing & related wiring of Ammeter-01 no., Ammeter Sel Sw. -01 no,Indication Lamp-03 no, Aux Relay-01 no,Bkr. Control sw.-01 no., Annunciation modification, Al strip for MIMIC diagram as per scheme
PB Bus (UNIT-2)
6.6kV OSD 08