Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan

Date:
01-10-2012

INDEX OF CONTENT
S.NO
1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

INDEX OF CONTENT
SCOPE OF WORK DESIGN PARAMETERS DESIGN CHECK FOR SCAFFOLD PLANK DESIGN CHECK FOR TRANSOMS/BEARERS DESIGN CHECK FOR RUNNER DESIGN CHECK FOR RAKERS DESIGN CHECK FOR VERTICAL STANDARD LATERAL STABILITY CHECK FOR CAPACITY OF BRACE COUPLER ATTACHMENT

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan SCOPE OF WORK

Date:
01-10-2012

ERECTION/ DISMANTLING AND PERIODIC INSPECTION OF THE ERECTED SCAFFOLDING FOR ACCESS OF CONSTRUCTION OF JUBAIL MOSQUE DOME LOCATION : JUBAIL SYSTEM OF SCAFFOLDING : MAO CUPLOCK SYSTEM. REFERENCES : (a) SAUDI ARAMCO SCAFFOLD SAFETY HANDBOOK(SSH) (b) SAES-A-112 METEROLOGICAL AND SEISMIC DATA (c) AISC(ASD),ASCE-7,BS1139,EN74 etc. Height of structure MAO cuplock system scaffolding Grid Size Scaffolding height Vertical lift of ledger/transom Maximum no of plank level Maximum no of working platforms Live Load : : : : : : : : 7.5m(approx from peak point) independent run faade 1.8m/1.25 x 1.0m (Maximum) 6m + 1.5m 2.00m 2.4 kN/m2 (As per ACI 347-6)

DESIGN PARAMETERS MATERIAL 1) MAO Cuplock system scaffolding BS 1139 Outside Diameter'OD' = Wall thickness,t = Yield strength = Inner diameter = Area of tube = Plastic section modulus = Radius of Gyration = Moment of Inertia =

48.3mm 3.2mm 235 N/mm (48.3-3.2-3.2) = 41.9mm /4 x (48.3- 41.9) = 453.45 mm (48.3^3 41.9^3)/6 = 6519.76 mm3 Sqrt I/A = 16 mm /64 x (48.34 - 41.94 ) = 115856.5mm4

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan 2) Tube as per Bs 1139 specification Outside Diameter'OD' Wall thickness,t Yield strength Weight of tube = = = 48.3mm 3.2mm 235 N/mm = 0.035 KN/m

Date:
01-10-2012

Physical properties of Tube Inner diameter = (48.3-3.2-3.2) = 41.9mm Area of tube = /4 x (48.3- 41.9) = 453.45 mm Plastic section modulus = (48.3^3 41.9^3)/6 =6519.76 mm3 Radius of Gyration = Sqrt I/A = 16 mm Moment of Inertia = /64 x (48.34 - 41.94 ) =115856.5mm4 3) Scaffold Plank (LVL Boards),Hy Plank 42mm x 230mm as per OSHA STANDARD (See attachment) Weight of scaffold plank Bending stress,Fb Shear stress,Fv Youngs Modulus,Eb Area of Cross section,(Ab) Section Modulus Moment of Inertia Safe Bending capacity Safe Shear Capacity 4) LOADING Rating of Scaffolding Dead load (DL) Live load(L.L) = = = = = = = = = = = = 0.25 KN/m2 15.23 MPa. 0.863 MPa. 10563 MPa. 9660 mm2 67620 mm3 1420020 mm4 1.03 KN-m 3.34 KN Medium Duty Rating Wt of scaffold plank + wt of ledger 2.4 kN/m2

5) LOAD COMBINATIONS. Gravity Loads DL + 4 (LL) < Failure (as per SSH) Used to check flexural members. (scaffold plank,bearers,transom,runners, posts(standards) etc.). P(DL + LL) < Pf/4; Pf = Ag x Fa (for vertical standards or posts). DL+ LL (gravity loads) to check capacity of couplers & fittings ref 9.7.2L SSH (Multiply the rated SWL listed in SSH table II. 9.2 by 0.4 to obtain a safety factor of 4 ans also to check the deflection in scaffold boards,Transom/Bearer a Runners). Wind loads DL + LL + WL for vertical posts,braces (compression members). 3

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan 6) ALLOWABLE FLEXURAL MOMENT (Bearer, Transom, & Runner). Mf Mf SIF Z Fy

Date:
01-10-2012

= SIF x Fy (min) x Z = allowable flexural moment. = Strength increase factor (Max SIF : 1.20, actual Yield strength as per test result is 375 MPa) = Plastic section modulus = Minimum yield strength = 235 N/mm2

Mf = 1.20 x 235 6520 = 1.838 KN-M 7) ALLOWABLE SHEAR FORCE CAPACITY (Bearer, Transom, & Runner). Vc Fy A = Allowable shear capacity = 0.4 x Fy x SIF x A = Minimum yield strength = 235 N/mm2 = Area of C/S of tube.

Vc = 0.4 x 235 x 1.2 x (453.45/1000) = 51.15 KN. 8) Load carry capacity of MAO Cuplock standard per vertical leg. P = 59.376 KN 9) Check Scaffold Plank (Boards) Dead Load (DL) = Live Load(LL) light duty = Loading W = DL + 4 LL = (See Item no :19 )

0.25 KN/m2 2.40 KN/m2 0.25 + 4 x 2.4 =9.85 KN/m2

Considering a single plank of 230mm wide strip. Loading /m = 9.85 x 0.23 = 2.2655 KN/m. Spacing of transom/bearer supporting scaffold plank = Maximum bending moment = wl2 /8 = Maximum shear force = wl/2 = Allowable deflection(as per SSH)= L/60 = Maximum deflection = 5wl4/384 EI =

1.25m c/c max (from grid size) 2.2655 x 1.252 /8 = 0.443 KN-m 2.2655 x 1.25/2 = 1.42 KN. 1250/60 = 20.833 mm 5 x 2.2655 x 12504 = 4.83mm(safe) 384 x 10563 x 1420020

(10) Check Transom/Bearer (for cantilever 2) 4

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan Dead Load (DL) = 0.25 x 0.5(tributary width = Self weight of transom/bearer = = Live Load (LL) = Live Load/m (2.4 x 0.5) = Load combination DL + 4 LL. =0.162 + 4(1.2) = 4.97 KN/m Maximum bending moment = Maximum shear force = 0.125 KN/m 0.037 KN/m 0.162 KN/m 2.4 KN/m2 1.2 KN/m

Date:
01-10-2012

wl2/8 = 4.97 x 1.252/8 = 0.9692 < 1.838 KN-m (Mf refer item no 6) wl/2 = 4.97 x 1.25/2 = 3.1 KN < 51.15 KN (Vc,refer item no 7).

(11) Check Runner ledger 1.25m(for cantilever 2) Maximum bending moment = Maximum shear force = wl2/8 = 0.37 x 1 2/8 = 0.0049 < 1.838 KN-m (Mf refer item no 6) wl/2 = 0.037 x 1/2 = 0.00195 KN < 51.15 KN (Vc,refer item no 7).

(12) Check Transom/Bearer (for cantilever 1) 5

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan Dead Load (DL) = 0.25 x 0.375(trib width Self weight of transom/bearer Live Load (LL) Live Load/m (2.4 x 0.375) Load combination DL + 4 LL. =0.13075 + 4(0.9) = 3.74 KN/m Maximum bending moment = Maximum shear force = = = = = = 0.09375 KN/m 0.037 KN/m 0.13075 KN/m 2.4 KN/m2 0.9 KN/m

Date:
01-10-2012

wl2/8 = 3.74 x 1.82/8 = 1.52 KN-m < 1.838 KN-m (Mf refer item no 6) wl/2 = 3.74 x 1.8/2 = 3.37 KN < 51.15 KN (Vc,refer item no 7)

(13) Check Runner ledger 1.0m(for cantilever 1) Maximum bending moment =wl/8 + Wl = 0.85 < 1.838 KN-m (Mf refer item no 6) Maximum shear force = wl/2 + W= 3.27KN < 51.15 KN (Vc,refer item no 7).

(14) Check Capacity of Raker Tube(for cantilever 1) 6

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan (a) Total load acting on a raker = self wt of tubes,scaffold platform + live load Dead load = 0.25 KN/m2 , Live load = 2.4 KN/m2 Tributary area,A = 0.9m x 1m = 0.9m2 Used cantilever platform 1 no at a time S No. 1 2 Item M AO M-lock Std + Cups @ 500mm c/c.
(1Nos 1.5)

Date:
01-10-2012

Qty. No.s 1 1/2 2/2 1/2 2/2 2 1 4/2

U.Wt KNs
0.051KN/m

Total Wt KNs. 0.051 0.034 0.068 0.019 0.038 0.136 0.1 0.078 0.066 0.032 0.622KN 0.0311 0.225 0.0575 0.94KNs

MAO M-lock Ledger + Transom 1.80m Ledger 1.80m ledger handrail 1.0m Ledger 1.0m ledger handrail 1.8m Intermediate transom Raker Tube 3m 1m Double coupler Putlog coupler

0.068 0.068 0.038 0.038 0.068 0.1 0.039

4 5

6 0.016 2 0.016 Total Dead Wt other Planks = Add 5% for Bracing & Fitting = Scaffold Board (0.25Kn/m2 x0.9x1) @ 1 cantilever= Toe board (0.25 x 0.23 x 1) @ 1st cantilever= Total Dead Load W1=

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan

Date:
01-10-2012

(b) Live load = 2.4 KN/m2 = 2.4 x 0.9 (tributary area) x 1(working level) = 2.16 KN (c) Total Load = DL + LL = 0.94 + 2.16 = 3.1KN

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan Total load at first raker(cantilever 1) = DL + LL = 3.1 KN Axial Load in Raker = P/sin(48) = 3.1/0.743 = 4.18 KN < 9.627 KN(see attachment )

Date:
01-10-2012

(15) Check the capacity of double coupler SWL in slip of double coupler = 9.4 KN Allowable carrying capacity of coupler = 0.4 x 9.4 = 3.76 KN Axial Load in Raker = p/sin(48) = 4.18/0.743 = 5.62 KN < 2 Nos (0.4 x 9.4 = 3.76 KN) Used 2 Nos Double coupler at a raker joint connection. (16) Check Capacity of Raker Tube(for cantilever 2)

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan Qty. No.s 1 1 2 2/2 8/2 6/2 4/2 1 4/2 Total Wt KNs. 0.255 0.068 0.136 0.038 0.152 0.135 0.09 0.085 0.078 0.066 0.064 1.167KN 0.058 0.61 0.0575 2.41KNs

Date:
01-10-2012

S No. 1 2

Item M AO M-lock Std + Cups @ 500mm c/c.


(2Nos 1.5m, 1 Nos 2m)

U.Wt KNs
0.051KN/m

MAO M-lock Ledger + Transom 1.8m Ledger 1.8m ledger handrail 1.0m Ledger 1.0m ledger handrail 1.25m Ledger 1.25m ledger handrail Raker Tube 2.5m 1m Double coupler Putlog coupler

0.068 0.068 0.038 0.038 0.045 0.045 0.085 0.039

4 5

6 0.016 4 0.016 Total Dead weight= Add 5% for Bracing & Fitting = Scaffold Board (0.25Kn/m2 x2.425x1) @ 2nd cantilever= Toe board (0.25 x 0.23 x 1) @ 2nd cantilever= Total Dead Load W1=

10

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan

Date:
01-10-2012

(a) Live load = 2.4 KN/m2 = 2.4 x 2.425 (tributary area) x 1(working level) = 5.82 KN (b) Total Load = DL + LL = 2.41 + 5.82 = 8.23KN

Check the capacity of double coupler SWL in slip of double coupler = 9.4 KN Allowable carrying capacity of coupler = 0.4 x 9.4 = 3.76 KN 11

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan Axial Load in Raker = p/sin(58) = 8.23/0.0.85 = 9.7 KN. Used 2 Nos Raker with Double coupler at a raker joint connection at middle support.

Date:
01-10-2012

(17) Check Vertical post(MAO cuplock standard)

12

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan Qty. No.s 1 4 6/2 4 6/2 4 3/2 1/2 Total Wt KNs. 0.3825 0.02 0.114 0.152 0.135 0.18 0.085 0.078 0.066 0.064 1.28KN 0.064 0.16 0.0575 2.019KNs

Date:
01-10-2012

S No. 1 2 2

Item M AO M-lock Std + Cups @ 500mm c/c.


(3Nos 2m, 1 Nos 1.5m)

U.Wt KNs
0.051KN/m

Spigot with nuts/bolts attach to standard MAO M-lock Ledger + Transom 1.0m Ledger 1.0m ledger handrail 1.25m Ledger 1.25m ledger handrail Bracing Tube 2.5m 2m Double coupler Putlog coupler

0.005 0.038 0.038 0.045 0.045 0.085 0.071

4 5

1 0.016 4 0.016 Total Dead weight= Add 5% for Bracing & Fitting = Scaffold Board (0.25Kn/m2 0.625x1) = Toe board (0.25 x 0.23 x 1) = Total Dead Load W1=

13

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan

Date:
01-10-2012

(a) Live load = 2.4 KN/m2 = 2.4 x 0.625 (tributary area) x 1(working level) = 1.5 KN Load on standard = (DL + LL) + = 2.019 + 1.5 = 3.52KN Total load on standard = load on standard + load from cantilever 2 = 3.52 + 8.23 = 11.75 KN P (DL+LL) = Total load on standard = load on standard + load from cantilever 2 = 3.52 + 8.23 = 11.75 KN

(18)Check for Buckling of Compression Member (MAO M-Lock Vertical) Assumption P(DL+LL) = Load due to (Dead Load + Live Load) Per Leg. Pf = Allowable Load due to Allowable Stress (Fa) per Leg. P(DL+LL) Pf = Fa xA Pf /4 = 3.52 + 8.23 = 11.75 KNs. = 129.33 x 453.45= 58.645KNs. = 58.645/4 = 14.66 KNs

** P (DL+LL)< Pf /4 Hence Safe in Buckling of Compression Member.

14

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan

Date:
01-10-2012

(19) Load Carry Capacity of MAO Cuplock Standard per vertical Leg. Properties of vertical Standard pipes Fy (Min Yeid Strength) = 235 N/mm2 Un braced Length L Effective Length Leff=KL Slenderness Ratio Leff /rmin Euler critical Stress Cc = 2000mm. = 1.0 x 2000=2000mm = 2000/16=125. = Sqrt (2x()2xE)/Fy Sqrt (2x(3.142)2x210000)/235 = 132.83N/mm2. Leff/rmin < Cc. Allowable Stress (Corresponding to Leff/rmin = 125) Fa = {1-( Leff /rmin)2/2 Cc2}x Fy 15

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan = {1-(125)2/2 (132.83)2} x 235 = 130.94 N/mm2. Allowable Load Carry Capacity per vertical Pf= Fa x A = 130.94 x 453.45=59,376.72N Pf = 59.376 KNs

Date:
01-10-2012

20) Lateral Stability of Scaffold Wind Load Analysis as per ASCE 7-05 Design wind pressure P V = Basic Wind Speed (3-second gust) = 93mph = 150km/h=41.67m/s Exposure 'C' for Jubail as per SAES-A-112 As per ASCE-7 (Table C6-3),the 10-year MRI Wind Speed is 0.84times the 3-second gust. Hence Wind Velocity V = 41.67m/s x 0.84 = 35.01m/s Velocity Pressure q z = 0.613 Kz Kzt Kd V2 I Kz = Velocity Pressure Exposure Coefficient Table 6-3 Exposure C ASCE 7-05 Kzt = Topographic factor = 1.00 as per section 6.5.7 ASCE7-05 Kd = wind directionality Factor = 0.95 table 6.4 16

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan I= Importance Factor = 1.0 As per SSH Addendum #2 section 5.0 Wind Load Wind Pressure P = qz x G x Cf G Cf = Gust Response factor = 0.85 as per 6.5.8.1 = Force Coefficient

Date:
01-10-2012

Cf = 1.2 for round sections, 2.0 for Rectangular Sections (Toe Boards & Planks) As per SSH Addendum #2 section 5.0 Wind Load Ac = Area of Circular section (consider Impact area of wind Load). Ar = Area of Rectangular section (consider Impact area of wind load). Pc = Wind Pressure on Circular Sections. Pr = Wind Pressure on Rectangular Sections. Wind tributary area increased by 5% to allow for overhangs, overlaps etc Wind Force F = Pc x (Ac x 1.05) + Pr x (Ar x1.05) Horizontal Surface Area@ every 2.0m consider: Ac = Area of {(HZ Ledger Runner + Hand Rails) + Vertical Standard + Bracing tube} = (3x 2 x 0.0483) + 3 x 2 x 0.0483 + 3x 2x 0.0483 + 1 x 2.5 x 0.0483 = 0.90 Sq.m Ar = Area of Toe board = 0.23 x 2x2= 0.92 Sq.m

17

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan

Date:
01-10-2012

(rectangular section)

Acx1.05

Arx1.05

Force F KN

KN/m2

Pc KN/m2

Pr KN/m2

10m 12m 15.m

Main Brace requirement Brace Angle = Tan-1 (2/1)= 63.44 deg. 18

Ht m

(round section)

V m/s
35.01 35.01 35.01

Cf

Kz
1.000 1.039 1.073

Cf

0.714 0.741 0.765

Horizontal Lateral Wind Force F1 = 1.87 KN @ every 2.0m level F2 = 1.94 KN @ every 2.0m level F3 = 2.0. KN @ every 2.0m level

qz

0.85 0.85 0.85

1.2 1.2 1.2

2.0 2.0 2.0

0.945 0.945 0.945

0.966 0.966 0.966

0.728 0.756 0.780

1.214 1.260 1.30

1.87 1.94 2

Manar Al Omran Co
CR. No. 4030177499

Job Title : JUBAIL MOSQUE Dome R.C. Project Date:


01-10-2012

Subject: Design of external Access Scaffolding - Dome P.O. Box 46217 Prepared by: Jeddah 21532 S M Ali Tel.: (02) 620-4582, 620-0613 Client:Royal Commission J & Y Fax: (02) 620-7194 Contractor:PITCO CALCULATION SHEET Approved by: (STRUCTURAL) M. S. Khan

Date:
01-10-2012

V1= Axial Force in Brace / leg = 1.87/Cos (63.44 deg) = 4.18KN< 5.3KN (SWL of Swivel Coupler) V2= Axial Force in Brace / leg = 1.94/Cos (63.44 deg) = 4.34KN< 5.3KN (SWL of Swivel Coupler) V3= Axial Force in Brace / leg = 2/Cos (63.44 deg) = 4.473KN< 5.3KN (SWL of Swivel Coupler) Total Axial Force in Brace transfer to Standards V = (4.18+4.34+4.473) = 12.993 KN. Total Axial Force Transfer in 3 Nos Vertical Standard = 12.993KN/3 = 4.331KN per leg of a Standard. Therefore Load Combination = DL+LL+WL DL/ leg = 2.41 KN from Page 7. LL/leg = 5.82 KN from Page 7. WL (Axial Force/ leg)= 4.331KN. Therefore DL+LL+WL = 2.41 + 5.82 + 4.331 = 12.71KN < Pf (Safe.) Check Couplers on Vertical Bracing The Vertical Bracing is connected to the Vertical Standard using Swivel Coupler SWL of Swivel Coupler in Slip = 5.3 KN. As per the recommendation of SSH, for wind load in bracing tube, the SWL of couplers shown in table II 9.2 of SSH may be used. SWL in Slip available at the connection = 5.3 KN **Max Load in brace due to wind load = 4.473 KN < 5.3 KN SWL at Connection Safe.