A Diagnostic Test Report On 10 MVA Power Transformer At UPPTCL, Lucknow July 2013

Submitted By M/s Mtekpro Technologies Pvt. Ltd.

A DIAG GNOS STIC TEST T R ORT REPO ON 10 0 MVA A POW WER TRANS T SFORM MER AT U UPPTC CL, LU UCKNO OW JU ULY 2013

Submitte ed By M Mtekp M/s pro Techno ologies Pv vt. Ltd.


B 229 9, LGF, Grea ater Kailash h 1, New De elhi 110048 Ph: 011 0 4617 3333 / Fax: 011 0 4182 56 662 / info@ @mtekpro.co om / Web: www.mtekp w pro.com

Mtekpro Technologies Pvt. Ltd.

GENERAL SAFETY
Safety is right at Mtekpro Technologies Pvt. Ltd., not a privilege! Comply with all the safety regulations and recommendations of the equipment manufacturers and plant operators. A LIFE LOST HAS UNRECOVERABLE DAMAGES! So take following Precautions; Ensure that the DEVICE UNDER TEST (DUT) is de-energized/isolated from all sources. Ensure that safety grounds are put before making any connections to the DUT. Ensure that connections to the supply sources for tests are tight and FUSES/MCB of adequate rating is used. The connection should preferably be taken from metal clad switches instead of plug points. Supply cables should not lie on ground but should be suitably supported. Instrument should be arranged at height convenient for operation DUT and test area should be cordoned off. Only authorized persons should enter the area. Ensure that necessary authorization for testing the equipment has been obtained as per safety tagging procedure. Ensure that all connections to the equipment are tight. Ground connections should be neat if proper size. Cleaned and properly tightened.

Mtekpro Technologies Pvt. Ltd.

Index
Sr. No. 01 02 03 04 05 06 07 08 09 Executive Summary Partial Discharge Measurement Introduction Partial Discharge Measurement Report Transformer Turns Ratio Introduction Turns Ratio Report Winding Resistance Measurement Introduction Winding Resistance Measurement Report Physical Observation Service Brochure Contents Page Number 01 - 02 03 - 05 06 07 - 09 10 11 - 13 14 - 15 16

Mtekpro Technologies Pvt. Ltd.


Executive Summary on Condition Assessment Test of 10 MVA Power Transformer
1. Introduction:
M/s MVVNL, Lucknow invited M/s Mtekpro Technologies Pvt. Ltd., New Delhi to demonstrate the testing equipments for Electrical Power System. M/s Mtekpro Technologies Pvt. Ltd., New Delhi has deputed their Condition Assessment Team on 25th July 2013 to M/s MVVNL, Lucknow to demonstrate the Condition Assessment Equipments at Railway Power House. During the mobilization for Demonstration Transformer assessment testing was executed in the presence of M/s MVVNL, Lucknow officials.

2. Scope of Work:
In this visit at M/s MVVNL, Lucknow following Testings are done for demonstration: 2.1 10 MVA, 33/11 kV Power Transformer 2.1.1 Partial Discharge Measurement 2.1.2 Transformer Winding Turns Ratio Test 2.1.3 DC Winding Resistance Measurement

3. Detailed Analysis of the Report:


3.1 Partial Discharge Measurement was done on the Power Transformer by Acoustic Sensor Method. Measurement was done on all directions of Transformer tank body on various locations. Result does not show any critical partial discharge through the Winding and Insulating Oil. For more detailed report please refer partial discharge report on page number 06. 3.2 As Transfomer Tap Changer was damaged / not in operating condition turns ratio measurement was done only on one tap which was also not accessible. And the same was informed to M/s MVVNL, Lucknow officials to take necessary action for changing or repairing of Tap Changer. Winding Turns ratio measurement between the Phases are identical. In the absence of Tap position we are unable to check the ratio error of the winding. If transformer will run in this condition for any more time their may be possibility to burn down due to contact loss and heating in Tap Changer. For detail report on Winding Turns Ratio Measurement refer page number 10.

Mtekpro Technologies Pvt. Ltd.

3.3 Transformer winding resistance measurement was done by injecting DC 40 A current. The winding resistance measurement between Y and B phases are approximately same while R phase resistance differs from them. This might be possible due to loose contacts in tap connections. As Tap changer was damaged resistance measurement was possible at only one tap. The winding resistance measurement on LT 11 kV side was found satisfactory. For detail report refer page numbers 14 and 15.

4. Observations & Recommendations:


4.1 During the Testing of Transformer oil leakages are observed on entire tank body of the transformer and the same was informed to M/s MVVNL, Lucknow officials. This needs to be rectified as soon as possible. 4.2 The Partial Discharge measurement does not show any discharge abnormal condition. It is recommended to check PD after Six month or One year. It is also require to employ alternate technologies for PD measurement. For demonstration purpose we have carried Acoustic Sensor based technologies, while we have alternate technologies like ULD-40 & HFCT are available for PD measurement. 4.3 The Transformer is running with damaged tap changer from many years. That needs to be changed or repaired as soon as possible to increase the life and smooth operation of the transformer. The Winding Resistance and Turns Ratio Measurement was done on only one Tap it is recommended that after rectification of tap change these tests must be repeated. 4.4 Transformer oil BDV needs to be checked and if it falls below the standard value then needs to be filtered to make it free from dust and moisture. 4.5 M/s Mtekpro Technologies Pvt. Ltd., New Delhi also recommends M/s MVVNL, Lucknow to make complete assessment test on transformers and associated switchyard equipments to reduce the chances of breakdown during its operating period Please refer page number 17 & 18. 4.6 For Condition Monitoring and Diagnostic Testing (CMD) details refer our service brochure. All testings mentioned in brochure needs to be done once in a year or after a interval of two year to ensure the health condition of power equipments. For Power Transformer other recommended tests to chek the health of transformer refer page numbers 17 19.and 19.

Mtekpro Technologies Pvt. Ltd.

Mtekpro Technologies Pvt. Ltd.

Mtekpro Technologies Pvt. Ltd.

Mtekpro Technologies Pvt. Ltd.

Transformer Partial Discharge Test Report


HT Side (33kV) PD Measurement Measurement At Position 1 Position 2 Channel 1 (mV) 33.9 41.2 Channel 2 (mV) 32.8 38.4 Channel 3 (mV) 35.3 33.6

LT Side (11kV) PD Measurement Measurement At Position 1 Position 2 Channel 1 (mV) 15.8 17.4 Channel 2 (mV) 13.9 18.4 Channel 3 (mV) 18.4 21.8

OLTC Side PD Measurement Measurement At Position 1 Position 2 Channel 1 (mV) 38.8 42.8 Channel 2 (mV) 43.1 39.7 Channel 3 (mV) 44.7 45.7

Open Side PD Measurement Measurement At Position 1 Position 2 Channel 1 (mV) 10.3 16.6 Channel 2 (mV) 12.1 16.2 Channel 3 (mV) 9.7 12.4

Remarks: For details on report refer executive summary clause number 3.1 and for recommendations clause number 4.2.

Testing Engineer

Mtekpro Technologies Pvt. Ltd.

2.0 TRANSFORMER TURNS RATIO TEST


2.1 SCOPE
The function of a transformer is to transform power from one voltage level to another .The ratio test ensures that the transformer windings have the proper turns to produce the voltages required.

2.2 INSTRUMENTS
220V ,50H Turns ratio tester with a capability of measuring ratios from 0.8 to 15,000,three phase Excitation current ,Phase angle reading and can measure the turns ratio of phase shifting transformer. Make-VANGURD, USA Model-ATRT-01B

2.3 PREPARATIONS, PRECAUTIONS & WARNINGS


The voltages should be applied only HV winding in order to avoid unsafe voltage.

2.4 TEST PROCEDURE


The turns ratio is measure of the RMS voltage applied to the primary terminals to the RMS voltage measured at the secondary terminals.

R= Np / Ns
Where, R-Voltage ratio Np- Number of turns at primary winding. Ns- Number of turns at secondary Winding.

Mtekpro Technologies Pvt. Ltd.


.

2.5 EVALUATION OF TEST RESULTS AND ACCEPTANCE LIMIT


The IEEE standard (IEEE Standard 62) states that when rated voltage is applied to one winding of the transformer, all other rated voltages at no load shall be correct within one half of one percent of the nameplate readings. It also states that all tap voltages shall be correct to the nearest turn if the volts per turn exceed one half of one percent desired voltage .The ratio test verifies that these conditions are met. The IEC60076-1 standard defines the permissible deviation of the actual to declared ratio as follows: Principal tapping for a specified first winding pair: the lesser 0.5% of the declared voltage ratio or 0.1 times the actual short circuit impedance. Other taps on the first winding pair and other winding pair must be agreed upon, and must be lower than the smaller of the two values stated above.

Mtekpro Technologies Pvt. Ltd.

Deviations in turns ratio readings indicate problems in one or both windings .In particular ,the TTR test is useful for identifying shorted turns or open circuits in the windings, incorrect winding connections ,and other internal faults or tap changer defects. If possible, the ratio at each tap setting should be checked against the nameplate ratio for each tap. Measurements are typically made by applying a known low voltage across the high voltage winding so that the induced voltage on the secondary is lower, thereby reducing hazards while performing the test .For three phase delta/wye or wye/delta transformer, a three phase equivalency test is performed, i.e. the test is performed across corresponding single winding.

Mtekpro Technologies Pvt. Ltd.

Remarks: For details on report refer executive summary clause number 3.2 and for recommendations clause number 4.3.

Testing Engineer

Mtekpro Technologies Pvt. Ltd.

3.0 WINDING RESISTANCE MEASUREMENT


3.1 SCOPE
Transformer winding resistance is measured in the field in order to check for any abnormalities due to loose connections, broken strands and high contact resistance in tap changers as pre commissioning checks and compare the measured values with factory test values.

3.2 PREPARATION, PRECAUTIONS & WARNINGS


As the transformer winding have low resistance, the measurement has to be carried out with the help of Kelvin double bridge/Transformer Ohmmeter. To reduce the high inductive effect it is advisable to use a sufficiently high current to saturate the core. This will reduce the time required to get a stabilized reading. It is essential that a temperature of the winding be accurately noted because resistance is temperature sensitive. Care also must be taken to ensure that direct current circulating in the winding has settled down before the measurement is done. In some cases this may take several minutes depending upon the winding inductance.

3.3 PROCEDURE
Winding resistance measurement are performed with low-resistance ohmmeter. For a three phase Wye-connected transformer, the resistance is measured for each phase-to-neutral winding: Note that for delta-connected transformer, the measured resistance for each phase is composed of parallel combination of the winding under test and the series combination of the remaining winding .It is therefore recommended to make three measurements for each phaseto-phase winding in order obtain the most accurate results. It is also recommended to allow the transformer to sit de- energized until temperatures are equalized (difference between top and bottom temperature does not exceed 5C ANSI / AIEEE C57.12.90) before making resistance measurements.

11

Mtekpro Technologies Pvt. Ltd.

According to IEC 60076-1, in order to reduce measurement errors due to changes in temperature, some precautions should be taken before the measurement is made. For Star connected winding the neutral brought out, the resistance shall be measured between the line and neutral terminal and average of three sets of reading shall be the tested value. For Star connected auto transformers the resistance of the HV side is measured between HV terminal and IV terminal, then between IV terminal and the neutral. For Delta connected windings, such tertiary winding of auto-transformers measurement shall be done between pairs of line terminals and resistance per winding shall be calculated as per the following formula: Resistance per Winding = 1.5 X Measured Value For Dry type transformers, the transformer shall be at rest in a constant ambient temperature for at least three hours. For Oil immersed transformers, the transformers should be under oil and without excitation for at least three hours. In addition, it is important to ensure that the average oil temperature

12

Mtekpro Technologies Pvt. Ltd.

(average of the top and bottom oil temperatures) is approximately the same as the winding temperature. In order to diagnose possible problems, the measured results are compared to the factory values, values of other phases of the same transformer, or sister units, if available. Before making such comparisons, the resistance has to be converted to a common temperature base of 75C or 85C, depending on what is reported on the transformer factory test sheet. The corrected resistance is calculated as:

  Rs = Rmeas X
Where,

 

Rmeas = Measured Winding Resistance Rs = Corrected Winding Resistance  = Reference Temperature at which the resistance is corrected (75C)  = Temperature at which the resistance is measured (25C)  = 234.5 for copper windings / 225C for Al windings
Consistency in measurements and record keeping are the keys to making the proper analysis using this test. If the unit has a Tap Changer, it is important to compare resistances for the same tap position. The contact resistance of other tap positions can be investigated by moving taps and repeating the measurements.

13

Mtekpro Technologies Pvt. Ltd.

Remarks: For details on report refer executive summary clause number 3.3 and for recommendations clause number 4.3.

Testing Engineer

Mtekpro Technologies Pvt. Ltd.

Remarks: For details on report refer executive summary clause number 3.3 and for recommendations clause number 4.3.

Testing Engineer

Mtekpro Technologies Pvt. Ltd.

Mtekpro Technologies Pvt. Ltd.

Power Transformer Routine Testing


M/s Mtekpro Technologies Pvt. Ltd. Performs industry standard inspection Testing including: A-1 Electrical Tests 1. Turns - Ratio Test 2. Insulation Resistance Test 3. Polarization Index (PI) and Dielectric Adsorption Test 4. Capacitance and Tandelta Measurement for winding & Bushing 5. Impedance Measurement 6. Magnetizing Current Test 7. Core Ground Test 8. Magnetic Balance Test 9. Vector Group Check 10. Winding Resistance Test A-2 Oil Test 1. Dielectric breakdown 2. Neutralization number 3. Interfacial tension 4. Specific gravity 5. Colour and visual condition 6. Water content 7. Power factor 8. PCB 9. DGA 10. Furan 11. Inhibitors 12. Degree of polymerization of paper A-3 Transformer Visula Examination 1. Infrared thermography 2. Main tankstructure/leak 3. Radiators and cooling fans 4. Conservator Tank 5. Tap - Changer contacts / Control Mechanism 6. Gas detector and sudden pressure relays 7. Pressure relief device

17

Mtekpro Technologies Pvt. Ltd.

8. Bushing Insulator, gasket, leak 9. Oil and Winding temperature gauges 10. High and low voltage bushings 11. Valves and Piping 12. Control, VT and CT wiring A-4 Tap-Changer Test 1. Tap position Indicators 2. Gaskets and seals 3. Current carrying contacts 4. Drive Mechanism

18

Mtekpro Technologies Pvt. Ltd.

Advanced Diagnostic Testing


B-1 Dielectric Frequency Response (DFR) Dielectric Frequency Response Testing is performed on the transforme primary to estimate the moisture content of insulation. DFR is alos used to check the electical intergrity of the transformers. DFR assesses the insulation of High Voltage (HV) to tank, Low Voltage (LV) to core, and insulation between HV and LV. The transformer must be offline and preferably disconnected from all connection hardware such as disconnect switches, buses, cables , and surge arrestors. In the DFR test, , by applying a variable frequency voltage between the HV and LV winding , the current is recorded by a high resolution electrometer. Some calculation is required to extract the dissipation factor plot versus applied frequency. DFR testing can detect paper moisture, insulation contamination, series contact issues and most abnormalities insided the winding insulation and oil. B-2 Frequency Response Analysis (FRA) Kinectrics, (formerly the Ontario Hydro R 7 D Division ) pioneered FRA, which is a technique currently being used by several utilities to detect winding damage and winding losseness in power transformers. FRA is performed off-line . It is recommended that this test be performed at least once to extract the baseline transfer function of the winding , which is essential for future comparision. FRA measures the mutual transfer function of the transformer winding in a frequency range of 10 Hz to 2 MHz. B-3 Frequency Response Stray Losses (FRSL) FRSL is used to detect short strands within a conductor . In the FRSL test, the AC resistance of the windings is measured from 20 Hz to 4000 Hz . As the frequency increases the skin effect becomes more pronounced, resulting in higher resistance. The AC resistance of 3 phases is compared to identify the faulty phase.