Sei sulla pagina 1di 58

CONCISE MANUAL

TOWER CRANE STT403

EU Importer & Maintenance


Jinlong Europe Zandvoorstraat 10/6 2800 Mechelen Belgium

Tel.: ++ 32/15 285454 Fax: ++32/15 209680


Jinlong Europe UK & Ireland 2nd Floor, Titan Court, 3 Bishop Square - Hatfield AL10 9NA
Hertfordshire U.K.
Tel: ++ 44/1707 226 522 Fax: ++44/1707 226 001

Manufacturer:
Fushun Yongmao Construction Machinery C Ltd. China

STT 403 CONCISE TOWER CRANE MANUAL

-2-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

-3-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

-4-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

-5-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

-6-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

PREFACE

Jinlong Europe, a revolutionary evolution!


Reliability, quality, safety, and high technology are the success of Yongmaos topless
tower cranes all over the world.
In Europe all our cranes are CE approved. This is the result of a constant
technological research.
Because of our relentless efforts to improve our products, technical updates are from
time to time necessary. Therefore, the technical data in this manual are subject to
change without warning.
Topless tower cranes, a revolutionary evolution.

Jinlong Europe
Zandvoorstraat 10/6
2800 Mechelen Belgium
Tel: ++ 32/15 28 54 54 Fax: ++32/15 20 96 80

Jinlong Europe UK & Ireland


2nd Floor, Titan Court, 3 Bishop Square Hatfield
AL10 9NA Hertfordshire
U.K.
Tel.: ++ 44/1707 226 522 Fax: ++44/1707 226 001

-7-

RCVC.2.0.ENG

TABLE OF CONTENTS
CHAPTER 1. TECHNICAL DATA..................................................................................... 10
1.1. SPECIFICATIONS ............................................................................................................................................... 11
1.1.1. STT403-24T ...................................................................................................................................................... 11
1.1.2. STT403-18T ......................................................................................................................................................14
1.2. PREPARING THE CONSTRUCTION SITE .................................................................................................... 17
1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY.................................................................................................17
1.2.1.1. INTRODUCTION..................................................................................................................................... 17
1.2.2. DIMENDIONS..................................................................................................................................................18
1.2.2.1. TOTAL CRANE DIMENSIONS .............................................................................................................. 18
1.2.2.3. DIMENSIONS EN WEIGHT PARTS....................................................................................................... 19
1.3. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS..................................................................... 26
1.3.1. PREPARATION ................................................................................................................................................26
1.3.2. INSTALLATING THE CRANE FOUNDATION .............................................................................................27
1.3.3. GROUNDPRESSURE AND CHOICE OF THE FUNDATION.......................................................................28
1.3.4. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS..............................................................29
1.4. COUNTER-JIB BALLAST .................................................................................................................................. 30
1.4.1. INTRODUCTION.............................................................................................................................................30
1.4.2. COUNTER-JIB BALLAST DIMENSIONS .....................................................................................................31
1.5. REEVING (ZIE 2-5-8) .......................................................................................................................................... 37
1.5.1. FROM DUAL REEVING TO SINGLE REEVING..........................................................................................37

CHAPTER 2. WINCH UNIT ............................................................................................. 39


2.1. EXPLANATION OF THE SYMBOLS: .............................................................................................................. 40
2.2. COMPOSITION OF THE WINCH UNIT: ......................................................................................................... 40
2.3. WORKING PRINCIPLE...................................................................................................................................... 41
2.4. SPARE PARTS AND MAINTENANCE.............................................................................................................. 42
2.4.1. PROGRAMMEDCONTROLLER ....................................................................................................................42

CHAPTER 3. SLEWING MECHANISM ........................................................................... 43


3.1. EXPLANATION OF THE SYMBOLS: .............................................................................................................. 44
3.1.1. DESCRIPTION:................................................................................................................................................44
3.2. SLEWING MECHANISM.................................................................................................................................... 45
3.2.1. DESCRIPTION .................................................................................................................................................45
3.2.2. OPERATION.....................................................................................................................................................46
3.3. RTC SCHEMATIC DIAGRAM........................................................................................................................... 48
3.4. MALFUNCTIONS ................................................................................................................................................ 50

-8-

RCVC.2.0.ENG

CHAPTER 4. TROLLEY WINCH ..................................................................................... 52


4.1. SYMBOLS ............................................................................................................................................................. 53
4.2. TROLLEY BRAKE(ZIE FIG. 6-4-1) .................................................................................................................. 55
4.2.1. DESCRIPTION:................................................................................................................................................55
4.2.2. MAINTENANCE..............................................................................................................................................57

-9-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

CHAPTER 1. TECHNICAL DATA

-10-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.1. SPECIFICATIONS
1.1.1. STT403-24t
24t

Fig. 1-1-1a

-11-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Table 1-1-1a
R
80
74
70
64
60
54
50
40

Fall
IV
II
IV
II
IV
II
IV
II
IV
II
IV
II
IV
II
IV
II

R(max)
m
12.49
23.70
15.57
25.84
16.30
31.24
16.30
31.24
17.01
32.65
17.01
32.65
17.01
32.65
17.01
32.65

C(max) t

30

40

44

50

54

60

64

70

74

80

24.00
12.00
24.00
12.00
24.00
12.00
24.00
12.00
24.00
12.00
24.00
12.00
24.00
12.00
24.00
12.00

8120
9120
9090
10090
11580
12000
11580
12000
12220
12000
12220
12000
12220
12000
12220
12000

5460
6460
6180
7180
8020
9020
8020
9020
8500
9500
8500
9500
8500
9500
8500
9500

4740
5740
5400
6400
7070
8070
7070
8070
7500
8500
7500
8500
7500
8500

3880
4880
4460
5460
5925
6925
5925
6925
6305
7305
6305
7305
6305
7305

3420
4420
3950
4950
5310
6310
5310
6310
5660
6660
5660
6660

2840
3840
3320
4320
4540
5540
4540
5540
4855
5855

2520
3520
2970
3970
4110
5110
4110
5110

2110
3110
2520
3520
3555
4555

1870
2870
2255
3255

1555
2555

-12-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Fig. 1-1-2a
Table 1-1-2a
F2
F3

249t
176t

245t
182t

F1

159t

190t
In service

157t

205t

out of service

Crane weight without load or ballast with


longest jib and at maximum height

Crane mechanism specifications


Table 1-1-2b
Name

Mechanism

m/min

m/min

Hoisting

90LFV60

038
046
072

12
7.5
3.5

019
023
036

24
15
7

Trolleying

kW

550m
>550m1

90

11DFV10

0-65 m/min

11

RTC435

00.8 rpm.

3 x 145N.m

YMD100

00.8 rpm

3x10,5

RT

12.525 m/min

6x5,2

Slewing
Travelling

Please consult us.


-13-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.1.2. STT403-18t
18t

Fig. 1-1-1b

-14-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Table 1-1-1b
R
80
74
70
64
60
54
50
40

fall

R(max)
m

C(max) t

30

40

44

50

54

60

64

70

74

80

IV

16.6

18.000

9036

6160

5485

4685

4250

3710

3405

3015

2795

2500

II

30.5

9.000

9000

6660

5985

5185

4750

4210

3905

3515

3295

3000

IV

18.0

18.000

10001

6920

6175

5290

4810

4210

3875

3445

3200

II

33.6

9.000

9000

7420

6675

5790

5310

4710

4375

3945

3700

IV

21.7

18.000

12440

8875

8865

6775

6180

5445

5030

4500

II

41.2

9.000

9000

9000

9365

7275

6680

5945

5530

5000

IV

21.8

18.000

12520

8970

7970

6860

6265

5520

5100

II

41.6

9.000

9000

9000

8470

7360

6765

6020

5600

IV

22.5

18.000

13005

9351

8350

7200

6575

5800

II

43.3

9.000

9000

9000

8850

7700

7075

6300

IV

22.2

18.000

12795

9177

8255

7115

6500

II

42.9

9.000

9000

9000

8755

7615

7000

IV

23.3

18.000

13550

9723

8770

7600

II

45.4

9.000

9000

9000

9000

8100

IV

24.5

18.000

14315 10500

II

40.0

9.000

9000

9000

-15-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Fig.1-1-2b
Table 1-1-2a
F2

249t

245t

F3

176t

182t

F1

159t

190t
In service

157t

205t

Out of service

Crane weight without load or ballast with


longest jib and at maximum height.

Mechanism Specifications
Table 1-2-2b
Naam

Code

m/min

m/min

Hoisting

75LFV60

038
046
076

9.0
7.0
3.0

019
023
038

18.0
14.0
6.0

Trollying

kW

550m
>550m2

75

7.5DFV08

0-69 m/min

7.5

RTC435

00.8 rpm

3x145N.m.

YMD100

00.8 rpm

2 x10.5

RT

12.5-25 m/min.

6x5.2

Slewing

Travelling

Gelieve ons te contacteren.


-16-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.2. PREPARING THE CONSTRUCTION SITE


1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY

1.2.1.1. INTRODUCTION
This brochure provides the dimensions of the space requirements for the crane.
It consists of two sections:
- The entire crane with indication of the most important dimensions.
- The crane is shown in three parts:
Foundation anchors and undercarriage
Mast composition
Range and jib length
Based on the provided dimensions, you can prepare the assembly of the crane.

ATTENTION: The provided dimensions do not take account of sagging


under load or any manufacturing tolerances.

-17-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.2.2. DIMENDIONS

1.2.2.1. TOTAL CRANE DIMENSIONS


14

19

11
18 17 16

10
9

13

12

15

8
6

2
3

8x8m

Fig. 2-1-2-1
N

Name

Fixing angle

11

Tower head

Base ballast support

12

Jib

Central ballast3

13

Trolley mechanism

Travelling bogie

14

Trolley

Mast section

15

Hook assembly

Telescoping cage4

16

Counter-jib

Telescoping mechanism

17

Hoisting mechanism

Lower slewing

18

Elektric control system

Upper slewing
19

Counter-weight1

10

Name

Cabin

To deliver by the user


If .applicable
-18-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.2.2.3. DIMENSIONS EN WEIGHT PARTS

1740

1.2.2.3.1. FIXING ANGLES

1x1531kg

2706
Fig.2-1-3-1

1.2.2.3.2. Mast

2575

25
00

7047

7086kg

Fig. 2-1-3-2

-19-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.2.2.3.3. Telescoping cage

50
80

12005

17000kg

5080

Fig. 2-1-3-3

-20-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

3550

1.2.2.3.4. Slewing mechanism.

25
90

12588kg

2590
Fig. 2-1-3-4

7206

1.2.2.3.5. Cat head

3708

30
27

5442kg

Fig. 2-1-3-5

-21-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.2.2.3.6. Jib
25451kg

81m

Jib T2112-2

Jib T2112-3
4500kg

4059kg

10370

2480

2480

3680

10351

1400

1400

Jib T2112-4

Jib T2112-5
3232kg

10259

2600kg

2430

2395

10299

1400

1400

Jib T2112-6

Jib T2112-7
1622kg

2101kg

10223
1750

10231
1770

1400

1400

-22-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Jib T2112-8

Jib T2112-9
1240kg

958kg

10168

1400

1715

1730

10158

1400

Pulley support
163kg

775

1180

383

110kg

1400

724

603

Jibnose T2112-11

Fig.2-1-3-6

-23-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.2.2.3.7. Trolley
3245

1258

18
64

1223kg

Fig.2-1-3-7

1.2.2.3.8. Hook

1767

32
0

1869

578kg

Fig.2-1-3-8

-24-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.2.2.3.9. Counter-jib
13126kg

23687
- Counter-Jib T2116-1

3655

4337

1400

1400

- Counter-Jib T2116-2
3252kg

2430

8351

1700

- Counter-Jib weight T2116-3

2551

6243kg

2200

11516

Fig.2-1-3-9

-25-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.3. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS


1.3.1. PREPARATION
TO BE PREPARED BY CLIENT:
The concrete foundation of the foundation anchors must be executed on basis of
the parameters in Table 1-3-1.

ATTENTION: The listed parameters are minimum values to be observed,


taking account of the stability requirements of the crane

Please contact us in case of deviating conditions.5

Jinlong Europe Zandvoorstraat 10/6 2800 Mechelen Belgium Tel.:++32/15 28 54 54 Fax: ++32/15 20 96 80.
and
Jinlong Europe UK & Ireland 2nd Floor, Titan Court, 3 Bishop Square Hatfield - AL10 9NA Hertfordshire - U.K.
Tel: ++ 44/1707 226 522 Fax: ++44/1707 226 001

-26-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.3.2. INSTALLATING THE CRANE FOUNDATION


The foundation must be defined taking account of:
- Type of crane
- The height of the crane
- The soil resistance
For this, we refer to table 1-3-2.
The crane reaction forces must at all times be less than the soil resistance.

ATTENTION: Incorrect installation of the foundation anchors may cause


crane instability, which, in turn, may result in an accident.

-27-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.3.3. GROUNDPRESSURE AND CHOICE OF THE FUNDATION


Mv
Fh

e=

Fv

M v + Fh h b

Fv + Fg
3

Fg

2( Fv + Fg )

pB =

3bl

[ pB ]

Mt

TorquekNm

Mv

Over turning moment (kNm)

Fv

Crane weight (kN)

Fh

Horizontal forces (kN)

Jiblength (m)

n. of mast section

YM:

Types of concrete blocks

Fg

Concrete block weight (kN)

ES

In service

HS

Out of service

Excentricity (m)

Dimension of concrete blocks (m)

pB

Ground pressure(kN/m2)

[pB]

Permissible ground pressure (kN/m2)


Table 3-1-1

n
80

74 70

Es

Hs

L(m)

L(m)

64

60

54

50

40

80

74 70

64

60

54

50

40

Mv 5156 5388 5810 5796 5807 5681 5859 5789 6672 6417 5941 5815 5670 5562 5377 5034
73.2

12

Fh

49.9 45.4 45.4 45.4 45.4 45.4 45.4 45.4

177

172

172

172

172

168

168 168

Fv 2007 1991 1987 1948 1945 1892 1889 1818 1767 1751 1747 1708 1705 1652 1649 1578
Mt

670 670 670 670 670 670 670 670

Table 3-1-2
H

73.2

12

YM173N

YM206N

YM235N

YM270N

YM307N

YM347N

YM307N

Fg

1730

2060

2350

2700

3070

3470

3070

pB

39.2

27.8

21.9

18.2

15.8

14.1

12.9

6.0

6.5

7.0

7.5

8.0

8.5

9.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

-28-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.3.4. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS

The foundation anchors must be placed symmetrically in relation to the


axes of the block and have to form a 2m square according to the dimension
of the mast they have to support.(fig. 3-3-1 en fig. 3-3-2)

300

ATTENTION: Please respect the 300mm distance between the mounting


plates and the fixing angles. See fig. 3-3-1.

2
1

2500x2500
Fig. 3-3-1

1.

Foundation anchor

2.

Reference line

ATTENTION: Cutting or reducing the reinforcement in the foundation is


prohibited.

-29-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.4. COUNTER-JIB BALLAST


1.4.1. INTRODUCTION
The counter-jib ballast consists of various reinforced concrete blocks A, B or
C. The counter-jib ballast is governed by the length of the jib. These blocks are
suspended one by one at the rear of the counter-jib.
Make sure that during erection the counter jib ballast will not be damaged.
The permissible weight tolerance is

+50
0

kg per block.

The manufacturing drawings are added in annex.


- Ballast 4000 kg fig. 5-1-1
- Ballast 2000 kg fig. 5-1-2
- Ballast 1000 kg fig. 5-1-3

NOTA: We recommend weighing the concrete blocks and marking their


weight with paint on a visible side of the concrete block.
.

-30-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.4.2. COUNTER-JIB BALLAST DIMENSIONS

Jib length

40

50

54

60

64

70

74

80

Counter-jib length in m

24.2

24.2

24.2

24.2

24.2

24.2

24.2

24.2

3A+C

4A+B

4A+B

5A+B

5A+B

6A+C

6A+C

6A+B

13000 18000

18000

22000

22000

25000

25000

26000

During use
and
telescoping

Blocks
Weight (kg)

Block type

Density (t/m3)

2.4

4000

1%

2.4

2000

2%

2.4

1000

2%

Weight(kg)

-31-

Tolerance

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

-32-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Fundation STT403-1

-33-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Fig. 5-1-1

-34-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Counter-weight A: 2000 kg

Fig. 5-1-2

-35-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Counter-weight B: 1000 kg

Fig. 5-1-3

-36-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.5. REEVING (ZIE 2-5-8)


1.5.1. FROM DUAL REEVING TO SINGLE REEVING
- Bring the trolley against the jib foot and fasten it.
- Lower the hoist hook down the ground (vertical position).
- Remove the connecting pin (8) so that the single and dual hookblock
separate.
- Reinstall the connecting pin (8) on the single hookblock and secure it
with cotter pins.

9
5

Fig.2-5-8

-37-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

- Bring the trolley (4) against the trolly (jib)(see fig. 2-5-9).
- Remove the pin (8).
- Reinstall the connecting pin (8) and secure it with cotter pins (8).
- This terminates the connection from dual to single reeving.

8
Fig. 2-5-9

NOTE: Conversion from dual reeving to single reeving takes place in reverse
order.

-38-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

CHAPTER 2. WINCH UNIT

-39-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

2.1. EXPLANATION OF THE SYMBOLS:


LFV
Single-wire
Type
Motor power in kW

2.2. COMPOSITION OF THE WINCH UNIT:

Fig.5-2-1

- Frequency controlled electrical motor(1)


- Brake mechanism (2)
- Gear box (3)
- Drum (4)
- Limiter (5)
- Ventilator (6)
- Support base (7)

-40-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

2.3. WORKING PRINCIPLE


The LFV system makes is possible to change the 3 phase power supply
(by a AC converter) to a frequency driven power voltage.
The electrical diagram:

XL
PLC
Lfa
PG
LM

Joy-stick
Programmable controller
Brake
Encoder
Motor

-41-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

2.4. SPARE PARTS AND MAINTENANCE


2.4.1. PROGRAMMEDCONTROLLER
The PLC must be checked frequently.

Part

Explanation

Parameter

Power supply

Voltage PLC

AC 220V

0C~55C
30%~85%RH

Control panel

I/O Voltage

Operation voltage

Fittings

Check for correct operation

Battery backup

Check batteries

-42-

AC100 240V
(85-264V) referentie

Ca. 3 jaar

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

CHAPTER 3. SLEWING MECHANISM

43-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

3.1. EXPLANATION OF THE SYMBOLS:


R T C
Torque (N.m)
Current brake
Voltage regulator
Slewing mechanism

3.1.1. DESCRIPTION:
Select the slewing speed according to the required displacement. Increase or decrease
slewing speed gradually. Slow down gradually instead of stopping abruptly by means
of the slew brake.
The slewing brake may only be used to position the jib when hoisting at wind speeds
< 13 m/s.
To prevent damage to the hoist rope, avoid simultaneous slewing and hoisting (rope
twisting risk)

44-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

3.2. SLEWING MECHANISM

3.2.1. DESCRIPTION
The slewing mechanism RTC consists of:
1/ A squirrel cage motor turning at constant speed in the desired direction;
2/ An electrodynamic coupling/brake producing the speed changes;
3/ A reduction in which the clutch engages directly on the slewing ring;
4/ Safety brakes mounted on the electrodynamic coupling/brake;
5/ Tacho-dynamo, for speed control;
6/ Slewing limiter;
7/ The crane can be put in weathervaning both manually and electrically.

45-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

3.2.2. OPERATION
1/ Make the motor run in the desired direction.
2/ The brake releases.
3/ The electrodynamic brake inductor is supplied with direct current.
4/ An amperage change in the inductor produces a speed change. In that way, the

desired speed can be obtained by means of the control box.


AT STANDSTILL:
- The power supply to the motor is switched off, power is supplied
to the inductor of the electrodynamic brake and the jib is brought
to a stop;
- The safety brake only locks when, in case of necessity, the operator
presses the thereto-provided button.

ATTENTION: Stopping the jib by counter-slewing is prohibited.


At the end of the workday, the jib must be placed in weathervaning.

46-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

1.

Motor

2.

Gearbox

3.

Weathervaing smechanism

3
4.

Slewing ring

5.

Limit switch

6.

Slewing brake

1
5

6
2

Fig. 6-2-1

47-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

3.3. RTC SCHEMATIC DIAGRAM


IC
V

RP

IC

Adjustable 3-phase

IC

alternating voltage

RP
IC
Anticlockwise contactor
V

Voltage feedback
Clockwise contactor

Functiediagram

Name
RP:

Potentiometer

IC:

Signal amplifier

Operation:
The control signal of the potentiometer RP (slewing mechanism RTC) is converted
through the amplifier IC to a single and three-phase AC-voltage that directly controls
the driving motor.

The slewing direction is controlled through a separate signal.

48-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Wiring diagram
RDi

A
RD

RM

RG

AC48V

49-

RRa

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

3.4. MALFUNCTIONS
1/ The slewing mechanism is provided with an electronic control device that:
- Controls slewing acceleration and deceleration;
- Prevents changing of the slewing direction by a control error;
2/ If a malfunction occurs, working with the crane must be stopped and its cause

must be eliminated.
Table 5-3-1
Operation

Normal

Abnormal

Slewing movement from 0


position on joystick.

Slewing starts gradually up to


its maximum speed.

Slewing starts abruptly. The


tower deforms.

Slewing movement towards


0 position.

The slewing movement slows


down and stops after 7-10
seconds.

Slewing stops instantly. The


tower deforms.

Shunt bridging.

Free slewing.

Slewing stops suddenly.

50-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

NOTE: These malfunctions can have the following causes:


1/ Incorrect connection of the 380 VAC/48 VAC power supply; excessive

voltage fluctuations;
2/ Potentiometer and joystick are not compatible or are incorrectly

adjusted with reference to the resistance (O-R/2);


3/ Check if the inverter is intact and operates properly within the

parameters;
4/ Check the connections of each part for damage and/or improper

tightening;
5/ Check if the control box still works within the given parameters.

51-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

CHAPTER 4. TROLLEY WINCH

52-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

4.1. SYMBOLS
DFV
Torque
Frequency controlled
Motor voltage (kW)
ATTENTION: The trolley hoisting speed must be selected
according to the distance to be run. Increase and
decrease speeds gradually.

53-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Composition of the trolley winch

11

6
Fig 7-2-1

1.

Support plate

2.

Reductor

3.

Drum

4.

Motor

5.

Limiter

6.

Brake

54-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

4.2. TROLLEY BRAKE(ZIE FIG. 6-4-1)


4.2.1. DESCRIPTION:
The electromagnetic brake starts operating as soon as the power supply is
cut. Brake clearance in the active range is automatically adjusted.

Fig. 6-4-1

1.
Fixed brake disc
2.
Brake disc
3.
Brake clearance
4.
Shaft
5.
Spring
6.
Brake plate
7.
Electromagneet
8.
Brake yoke nut
9.
Pressure disk
10.
Brake
11-12-13. Fixation
14.
Cover
15.
Complete brake
16.
Cover

55-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

Brakes:
When the current is cut, the electromagnetic atrractive force disappears.
The brake spring (8) pushes the pressure plate (6) back on the brake disc
(1-2). This closes the brake.
Opening the brake:
When the excitation coil (7) is excited, the pressure plate (6) is attracted
by which the brake compression spring (8) is pressed in. By this, the
brake discs (1 and 2) open up.
Brake clearance:
Normal brake clearance is 0.8 to 1.2 mm. Check brake surfaces for
soiling (oil- grease).
Brake moment adjustment:
The brake moment is set at the factory.
Opening the brake manually:
The brake can be released manually by loosing the brake yoke (9 en 10).
Cover

Chassis

Nut

Splitpen

Screw

ATTENTION: It is prohibited to work with a manually opened


brake.

56-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

4.2.2. MAINTENANCE
1/ Every 200 hours or once a month:
2/ Check brake clearance and brake moment, as well as the condition

of the brake discs. Normal brake clearance is normally 0.8 to 1.2


mm.
3/

Attention: replace brake discs before they are completely worn.

4/ Check if there is any foreign matter in the brake and if it is free

from oil and grease.

ATTENTION: The brake must immediately be inspected if:


- It does not work properly
- It is overheating
- Abnormal vibrations are noticed
- Braking torque is insufficient

57-

RCVC.2.0.ENG

STT 403 CONCISE TOWER CRANE MANUAL

EU Importer & Maintenance


Jinlong Europe Zandvoorstraat 10/6 2800 Mechelen Belgium

Tel.: ++ 32/15 285454 Fax: ++32/15 209680


Jinlong Europe UK & Ireland 2nd Floor, Titan Court, 3 Bishop Square - Hatfield
AL10 9NA Hertfordshire U.K.
Tel: ++ 44/1707 226 522 Fax: ++44/1707 226 001

Manufacturer:
Fushun Yongmao Construction Machinery C Ltd. China

Potrebbero piacerti anche