UNITIAREA: PDH
EVENT TYPE: REFERENCE NUMBER : DATE REMOVED FROM SERVICE: DATE RETURNED TO SERVICE:
INSPECTION
(DO-MMM-W
CHECKLIST DETAILS
1 SHELL AND TRANSITION CONE. . . .
found satisfactory
2 LOWER HEAD (NORTH OR WEST HEAD IF HORIZONTAL) Check for weld cracks, corrosion and mechanical damage.
NOT APPLICABLE
ACTION REQ'D
found
3 UPPER HEAD (SOUTH OR EAST HEAD IF HORIZONTAL)
Examine for cracking and mechanical damage, check vents and drains.
found
4 INTERMEDIATE HEADS.
g
-
. -
found
5 NOZZLES AND MANWAYS INCLUDING PADS AND ATTACHMENT WELDS. - RE-ENFORCING
:TION REQ'
Look for corrosion, cracking, signs of leakage, excess vibrations and proper gusseting..
8 PIPE SUPPORTS, GUIDES AND BRACES. --Check hoffcold settings, springslhangers for damage, wear..
ACTION REQ'D
NOT APPLICABLE
Inspect for elongated or mushroomed holes, mechanical damage and cracked welds.
ACTION REQ'D
I I
[NO-ACTION REQ'D
Examine for corrosionlpaint failure in tight areas, crackingldistortion and proper drainage.
11 SKIRT AND SUPPORT LEGS INCLUDING DIAGONAL BRACING. Check moisture collecting areas for corrosion, mechanical damage and debris in skirt.
I INOACTION REQ'D
I
Date:
DD
MMM
l N S T R U C T l O N S
13 PLATFORMS AND HANDRAILS Inspect welds to vessel for cracks, looselmissing hardware or handrail components. 'LICABLE REQ'D NO ACTION REQ'D
14 -LADDERS
ACTION REQ'D
15 STAIRWAYS. Examine for loose treads, missing rails and missinglloose hardware.
17 FOUNDATION AND ANCHOR BOLTS Examine for looselmissing bolts, crackedlspalledlmissing concrete.
NO -- ACTION REQ'D
- -
NO ACTION--REQ'D
-NOT APPLICABLE
ACTION REQ'D NOT APPLICABLE ACTION REQ'D
NO ACTION REQ'D
21 LEVEL GAUGES. Check for proper gusseting, clear glasslreadable, gasket leaks NO ACTION REQ'D
NO ACTION REQ'D
'
23 OTHER PRESSURE CONTAINING INSTRUMENTS Note what they are, check proper operation and condition.
NOT APPLICABLE
ACTION REQ'D
NO ACTION REQ'D
NO
-
COMMENT
- --
. -
GENERAL NOTElSlGN OFF SECTION Note: 1. 2. 3. 4 The Document Number in the top right corner is to be completed by the Document Control Centre. Use the Additional Comments area when you run out of space on the specific Instruction comment area. Attach drawing showing areas of concern. Return checklist to ERG Inspector upon completion of inspection. REVIEWER SIGN-OFF (if applicable)
(krcllrrosdbbvdn~mlurrsl
(include printed name anddate with signature)
z
-
INSPITECH'S SIGNATURE: