Sei sulla pagina 1di 8

ERECTION PROGRAMME FOR 500MW BOILER - NTPC KORBA

As on 01 - 09 - 2009
MONTH / YEAR
PG

Description

08/09 09/09 10/09 11/09 12/09 01/10 02/10 03/10 04/10 05/10 06/10 07/10
DESIGN Compld. BAL.
WEIGHT

Remarks
6

10

11

12

13

14

15

16

17

PRESSURE PARTS
04

BOILER DRUM

240

230

10

05

WW HEADERS

191

191

06

WW PANNELS

593

593

07

RISER TUBES

322

322

08

BUCK STAYS

655

653

09

SEAL BOXES

13

13

10

SH HEADERS

183

183

11

SH PANNELS

884

884

455

450

51

51

310

310

RH HDR SUSPENSION

98

88

SKIN CASING

22

12

12

SH HDR SUSPENSION

15

RH HEADRS

16

RH COILS

17
18

10

Drum Internals

DC seismic Guides
Furnace Guides, Rear Arch
Buckstay.

25

25

10

10

10

10

SH. Divisional Loose Tubes, Eco.,


LTSH, Backpass Header
Shielding, Links Support, SH
steam Cooled Spacer.

RH Cross Over tubes, RH steam


Cooled Spacer.
7

Page 1 of 8

ERECTION PROGRAMME FOR 500MW BOILER - NTPC KORBA


As on 01 - 09 - 2009
MONTH / YEAR
PG

Description

08/09 09/09 10/09 11/09 12/09 01/10 02/10 03/10 04/10 05/10 06/10 07/10
DESIGN Compld. BAL.
WEIGHT

Remarks
6

19

ECO SYSTEM

888

888

24

TRIM PIPING

335

202

133

30

40

31

BOILER FIXING
COMPONENTS

16

12

5256

5082

174

70

78

PPA TOTAL

10

11

12

13

14

15

16

17

Eco. Header Supports.


25

25

15

42

40

31

20

SOOT BLOWERS

79

74

21

SB PIPING

27

27

10

106

74

32

15

13

13

165

93

72

15

25

30

15

14

178

93

85

17

27

33

15

16

78

71

15

15

10

10

FUEL OIL PIPING TOTAL

82

75

17

17

10

10

PPA GRAND Total

5622

5256

90

70

58

SB PIPING TOTAL
28

DOORS

30

ENCLOURS

ENCLOSURE TOTAL
41

OIL GUNS

42

FUEL OIL PIPING

366 119 129

Fuel Oil Pump House Clearance.

Page 2 of 8

ERECTION PROGRAMME FOR 500MW BOILER - NTPC KORBA


As on 01 - 09 - 2009
MONTH / YEAR
PG

Description

08/09 09/09 10/09 11/09 12/09 01/10 02/10 03/10 04/10 05/10 06/10 07/10
DESIGN Compld. BAL.
WEIGHT

Remarks
6

10

11

12

13

14

15

16

17

STRUCTURE
35

BOILER STRUCTURE

4185

4089

96

36

BOILER PLATFORM

3410

2419

991

80

80

80

100

100

100

100

100

100

80

38

INTER CONN.
PLATFORM

810

801

100

60

80

100

80

80

80

80

60

39

FAN HANDLING
STRUCTURE

100

100

10

20

25

20

13

12

99

EQUIPMENT HANDLING
ARRANGEMENT

46

46

8551

6517

2034

190

165

185

230

193

192

190

10

10

10

Structure Total

10

80

96

RHS Lift Col. & addnl. floor grills.

92

Bunker Bay Col. Clearance to


start interconnection platforms.
Mill Maintenance Platform, PPA
Handling Structure.
Fan foundations are not ready.

10

10

180

170

93

10

Sequential holdup of Fans , Mills


& APH.
80

188

NON PRESSURE PARTS


81

81

10

BURNER BLOCKS

153

150

47

COAL PIPING

716

183

533

50

75

100

100

75

75

50

20

10

48

DUCTING

1749

904

845

100

100

100

100

100

100

80

100

80

85

50

SCAPH

20

20

57

DAMPERS

356

130

226

10

20

20

25

2125

1034

43

AIR SYSTEM PIPING

45

DUCTING TOTAL

Bunker Bay Stru. & Feeder floor


Clearance.
24

Bunker Col. Clearance


Fan foundations are not ready.

25

20

1091 115 125 125 130 125 120

80

14

160 114

10

20

22

90

105

46

Page 3 of 8

ERECTION PROGRAMME FOR 500MW BOILER - NTPC KORBA


As on 01 - 09 - 2009
MONTH / YEAR
PG

Description

Non Pressure Parts Total

08/09 09/09 10/09 11/09 12/09 01/10 02/10 03/10 04/10 05/10 06/10 07/10
DESIGN Compld. BAL.
WEIGHT

3075

1367

Remarks
6

10

11

1708 173 213 235 240 210 200

12

13

14

15

215 144 109 121

16

17

46

Page 4 of 8

ERECTION PROGRAMME FOR 500MW BOILER - NTPC KORBA


As on 01 - 09 - 2009
MONTH / YEAR
PG

Description

08/09 09/09 10/09 11/09 12/09 01/10 02/10 03/10 04/10 05/10 06/10 07/10
DESIGN Compld. BAL.
WEIGHT

Remarks
6

10

11

12

13

14

15

16

17

ROTATING MACHINES
52

PRIMARY AIR PRE


HEATER

568

552

16

52

AIR PRE HEATER

892

849

43

10

10

10

APH TOTAL

1460

1401

59

14

14

16

14

14

10

55

FD FAN - A

51

51

10

15

55

FD FAN - B

51

35

16

15

55

PA FAN - A

48

27

21

16

55

PA FAN - B

48

24

24

14

198

86

112

26

28

32

26

AXIAL FANS TOTAL


ID FAN - A

112

121

-9

56

ID FAN - B

112

112

30

20

10

56

SEAL AIR FAN

RADIAL FANS TOTAL

232

121

111

35

25

15

FANS TOTAL

430

207

223

61

53

47

736

736

80

80

MILLS - LHS

Fan foundations work in progrss


Material received on 16.03.09.
Preparatory work in progress.

56

61

Fan foundations Excavation work


not started.
Material received on 14.03.09.
Preparatory work in progress.

15

13

0
Fan foundations Work in
progress.

Fan foundations Excavation work


not started.

34

20

20

11

80

100

75

75

100

75

50

10

11

Fan foundations Excavation work


not started.

Mill foundations are not ready.

Page 5 of 8

ERECTION PROGRAMME FOR 500MW BOILER - NTPC KORBA


As on 01 - 09 - 2009
MONTH / YEAR
PG

61

Description

MILLS - RHS

MILLS TOTAL

08/09 09/09 10/09 11/09 12/09 01/10 02/10 03/10 04/10 05/10 06/10 07/10
DESIGN Compld. BAL.
WEIGHT

736

736

1472

63

63

Remarks
6

10

11

12

13

14

100

100

100

100

90

75

50

10

11

1472 100 180 180 180 190 150

65

FEEDER

67

FEED PIPE TO MILL

108

108

Rotating Machines
Total

3533

1608

1925

30

175

277

125 110

283

233

229

175

170

16

17

Mill foundations are not ready.

86

50

10

40

154

93

57

16

15

30
40

15

11
Feeder floor not ready.
Sequential erection of Mills &
Feeders

Page 6 of 8

ERECTION PROGRAMME FOR 500MW BOILER - NTPC KORBA


As on 01 - 09 - 2009
MONTH / YEAR
PG

Description

08/09 09/09 10/09 11/09 12/09 01/10 02/10 03/10 04/10 05/10 06/10 07/10
DESIGN Compld. BAL.
WEIGHT

Remarks
6

10

11

12

13

14

15

16

17

PIPING
24

MS PIPING P - 91 &
Boiler Filling Line

57

54

167

36

131

Piping Total

224

90

134

TOTAL

21005

14838

6167

80 & SG PIPING &


81 EXPANDERS

P-91 material pending.


CBD tank foundation not
available.

10

10

20

20

20

20

20

10

11

10

20

20

20

20

20

10

659

795

803

793

710

594

597

498

382

279

146

203

Non DRAINABLE WELDING


No. of Joints - 5589

MONTH (may . - 09)

67

CUMULATIVE

3298

DRUM LIFTING - 27/02/2008 ,

DRAINABLE HYDRO TEST - 28.01.09(02:45 HRS.)

Page 7 of 8

SUMMARY
TEXCEL ENGINEERS PVT. LTD
500MW BOILER NTPC KORBA
As on 01 - 09 - 2009
MONTH / YEAR
Description

08/09 09/09 10/09 11/09 12/09 01/10 02/10 03/10 04/10 05/10 06/10 07/10

DESIGN Compld.
WEIGHT

BAL.
6

10

11

12

13

14

15

16

17

Pressure Parts Total

5622

5256

366

119

129

90

70

58

Structure Total

8551

6517

2034

190

165

185

230

193

192

190

180

170

93

80

188

3075

1367

1708

173

213

235

240

210

200

215

144

109

121

46

3533

1608

1925

175

277

283

233

229

175

170

154

93

57

16

15

Piping Total

224

90

134

11

10

20

20

20

20

20

10

TOTAL

21005

14838

6167

659

795

803

793

710

594

597

498

382

279

146

203

Non Pressure Parts


Total
Rotating Machines
Total

Page 8 of 8

Potrebbero piacerti anche