Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Task
Description It seems that some values are not accepted and the owning unit field clears out when you move past it. The corresponding field unit XXXF is accepted. (ECP,ECPF),(NCP,NCPF),(WEP,WEPF),(SCP,SCPF) Documents attached to old epmps 37629 are from path http://camdocweb1:8080/dmwebdav/files/epmp/36 345/WO #10.pdf users not able to Enroll ePMP's. After clearing the temp internet files, opened and closed the browser and then user was able to Enroll this ePMP date of ePMP created always default to 9/2004. Need to check for this Client name need to be updated. Client Number:42522 Mastery Level Project/Program/Construction Management Roles . Need to check its not affecting ePMP. Need to find a solution to stop duplication of client, during client creation process in Oracle. Mastery Level Project/Program/Construction Management Roles . Need to check its not affecting eCloseout. client contact details are not correct. Need to check on this. Need to check and test in test environment. clients details are missing when eCloseout created for WSA projects.
Status
Assigned To
Assigned/Escalate d Date
Comments
In Production.
Abirami
In Progress
Abirami
ePMP
on Hold
Abirami
4 5 6 7 1
ePMP date Issue during pmp creation User Request :Wing maher Marie HR changes for PM role ePMP - Client Duplication HR changes for PM role
on Hold on Hold completed/prod change form created. on Hold completed/prod change form created.
eCloseout
on Hold
Abirami
on Hold Waiting for European employee details(Old Emp# and New Emp#),Update script for 'per_people_f' table Completed Hold Hold Hold
Abirami
1 Discipline 2 1 2 3
Kadiresan
Production change form Approved by Rachael. 8/2/2012 8/8/2012 Updated in Test Updated Stored Procedure Waiting for feedback from Terry Customization Required
Update for 6 digit employee number DMS Analytics Sitemap XML Module Report on keywords and phrase entered for search in cdmsmith.com Modify Rebrand API to Update MetaTag Keyword field for all Items in sitecore Page not Found Error in Production Podcasts on iTunes CDMSmith.com updates for new marketing campaign Itunes RSS feed not showing Description Login option for CDMSmith.com SharePoint 2010 Web Part for ITS Global portal Locator Search resumes for SharePoint 2010 Job search page Multiple Role Assignment For CED,Early Termination for DM Role Convert the FWO Workflow to VS 2010 and setting up the Dev Environment Updates on the Notification FWO Webpart Tier 2 and 3 Sites Change the Content from CDM to CDM Smith Tier 2 and 3 Sites follow-up for Rebranding
CDMSmith.Com
Moved to Production Moved to Production Completed Hold In Progress Completed./Waiting for feedback from Terry. Completed In Testing/ Waiting for Feedback from Rachael Moved to Production Moved to Production Completed Completed/In testing by Terry Moved to Production In progress
4 5 6 7 8
8/5/2012 http://portaltest.cdm.com/ITHome/ default.aspx Updated to use WCF to fetch resume from Marketpoint
1 1
New Updates Update Locator to Search resume in SP 2010 repository Update the job code search link in Job search page Work on to Update the Role to have multiple values Update the Workflow , to handle Early termination for DM Role in case of CED
Maheswaran Manju Manju Manju Manju Maheswaran Manju 2/13/2012 2/13/2012 11/8/2011 Moved to Test
CSS updates to Increase the font size for Tier 2 Change the Notification Content from CDM to CDM Smith Rebranded the banner
Moved to Production
Kadiresan
4 5 1 1 2
FWO Workflow FWO Portal and HR banner updates Print All Reports Revenue Report Backlog Report
In Testing
Graph is not showing the correct information CDM Consulting and Engineering and CDM Constructors Inc. value is not shows
BI 3 Data Validation on Weekly(Utilization report)/Monthly basis(financial reports) Validate the May 2012 Monthly data for Financial Reports In progress Maheswaran
UT Report (Weekly Testing) for 5/May/2012: Compared the excel sheet values with BI site grid values which Bill Kiesel have sent to me. All values are matching. Financial Report(Monthly Testing) for Jan - June: All values are matching
4 1 2 Production Move 3 4 Locator Resumes Locator - Employee Search 1 1 1 1 2 3 Email List builder 2
Employee Utilization Report HR and Fwo Rebranding Search pages Oracle Webservice Company Store updates Incorrect resumes for Market point Employee, Office and Hotel Search Connection Timeout Update the Connection string from Session variable to constant value Users are periodically getting the You must set the SQL property if not passing a recordset error JavaScript issues in office Locator Fix the Autocomplete issues in office locator IIS 7.5 Settings for Classic ASP
Workgroup was showing error for CDM Europe Rebranding updates for HR and FWO banner and Webpart Rebrand the Search Pages and Advanced Pages in Portal.cdm.com Updated the Oracle Webservice Change the payment type for Gift certificate Incorrect resumes for Market point Add code to catch the Error and send mail to ITSCAGDEV and check with Windows Authentication is
Kept on hold Moved to Production Moved to Production Moved to Production Moved to Production Moved to Production Moved to Production Moved to Production
Maheswaran Manju Manju Manju Manju Manju Maheswaran Manju Maheswaran Manju Manju Manju
Add code to catch the Error and send mail to ITSCAGDEV and check with Windows Authentication is enabled Fixed the JavaScript issues in Office Locator Fix the bug in the Autocomplete for office locator Investigate the IIS settings to avoid Session drop Change the CDM logo to CDMSmith logo, Change the Content from CDM to CDM Smith, Change the link from "CDM Web" to "inSite" and Change the the link from "cdm.com" to "CDM Smith.com" Change the CDM logo to CDMSmith logo, Change the Content from CDM to CDM Smith, Change the link from "CDM Web" to "inSite" and Change the the link from "cdm.com" to "CDM Smith.com" Remove the CDM logo, Change the Content from CDM to CDM Smith, Change the link from "CDM Web" to "inSite" and Change the the link from "cdm.com" to "cdmsmith.com" Rebranding updates
BI Reports
Maheswaran
2 Rebranding Tier 3 3
BI Portal
Hold
Kadiresan
3/19/2012
6/5/2012
eCloseout
Completed/ In Testing
Abirami
SAA
Manju
Traffic Analysis
In Discussion
Manju
1 Company Store 2
Company Store
Updated the application for Support to 6 digit employee numbers Eunice, Yeo user not able to access company store site Checking exception Add the Demo Page Updates in Advanced Search page MacDonald, Mariannes projects are not showing in the MyProject webpart to be build using SSRS report builder
In Testing
Maheswaran
company store
In Progress
Maheswaran
My Project Demo Page Advanced Search page My Project registration report CSM report, Required Training Report Drug/Alcohol report Exxon Mobil Report H&S Report Employee report PM report 3D/4D PW Report CWC Report Learning Activities Report
LMS Reports 2
In Progress
Abirami
ILM Provisioning ILM Provisioning Update for 6 digit employee number Expected Task Completed date August 17th 2012 August 16th 2012 August 16th 2012 August 21st 2012 On Leave Yet to Assign Task
German characters not accepting in Employee picker Updated the application for Support to 6 digit employee numbers
Will be Free From August 17th 2012 August 17th 2012 August 22nd 2012
SNo 1
Task Name
Report Name
COBRA Report Cyempl EEO Report Requirement FSG Indirect Expense Detail Rpt Workcell changes 106 110 RE: FSG Charge Number Status Rpt 118 LOA Report 100r Update Role names CCI Employee UT Summary - WTD,MTD,YTD Contract Analysis Rewrite German UT report FSG AR Aging Report Deltek Discoverer Reports Expenses Direct Deposit Confirmation PM profit report 59 iR Oracle UT report - needed for SPARS Deltek for DE & EU - New Discoverer Report CCI: Labor Hours Report CCI JV Project Overview Report Missing Invoices HR Discoverer Reports HR Discoverer Reports 117
Busy till 14_Aug-2012 14_Aug-2012 14_Aug-2012 14_Aug-2012
Federal reports CDM Reports German Reports German Reports Federal Reports German reports Inc Reports German Reports German reports CCI Reports Inc Reports German Reports Federal reports Inc Discoverer Reports Inc Reports German Reports German Reports Inc Reports Deltek Reports CCI Reports CCI JVReports INC HR INC HR German Reports
Summary status of the work & Availability of the developer(s)
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25
GROUP
HR reports/Enhancements Requirement is to to add the addition of a Wrk Grp Name column, to the right of existing Wrk Grp column. So the request includes this and the multi month requirement. Changes to the email text and the total charges column and Disable an ability to modify the work cell number from Caf responsibility Changes on the report - removal of location Parameter and the role changes Changes on the report - removal of location Parameter and the role changes changes to Direct Projects sheet andf new Indirect project sheet Addttional parameters to the Report Report to capture Employee Leave Types Addition of new columns and rearrangement of columns Update the role names for project Manager and Assistant Project Manager as it affets the Project enrollment Modifications of an existing report convert legacy Pro COBOL Contract analysis report to a BI Publisher report Summarised version with Division wise totals Address the credit memo grouping by bill number Deltek Discoverer Reports for Tracking changes to the test of the notification BI Publisher report showing details per PM Add net-hours calculations to the I version of the 59 report Chargeable hours shown doubled Timesheet Status Tracking Report (Missing/Open new bug while testing Miising Invoices-Bill to date and Received to date Additional Fields to DISCOVERER Additional Fields to DISCOVERER The report considers the wrong period where previous period is to be considered . Issue fixed
Free From 16_Aug-2012 16_Aug-2012 16_Aug-2012 16_Aug-2012
oracle
oracle
oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle oracle
Priority
Status / Action
Business Unit
Technology
MED
working
INC
Oracle Forms
Tom/Bernadette
MED
working
FED
Oracle Reports
Visser Gerrit
High MED MED MED MED MED MED MED MED MED MED MED MED MED MED MED MED MED MED MED MED MED MED
working completed Completed working completed completed Completed working completed completed completed Hold completed completed working working completed Assigned Assigned Assigned Assigned Assigned completed
INC Germany Germany FED Germany INC INC Germany CCI Inc Germany FED Inc Inc Germany Germany Inc Germany CCI CCI INC INC Germany
Oracle Reports Oracle Reports Oracle Reports Discoverer Report Oracle Reports Discoverer Reports Oracle Reports Oracle Reports Oracle Reports Reports Reports Reports Reports Reports Reports Reports Reports Reports Reports Reports Discoverer Report Discoverer Report Oracle Reports
Kapoor Nitin Thomas Bott Thomas Bott Visser Gerrit Thomas Bott Kapoor Nitin/Tom Thomas Bott Thomas Bott Loring Jon/Sam Kapoor Nitin Thomas Bott Kapoor Nitin Kapoor Nitin Kapoor Nitin Kapoor Nitin Thomas Bott Kapoor Nitin Kapoor Nitin Kapoor Nitin Kapoor Nitin Kapoor Nitin Kapoor Nitin Thomas Bott
Assigned To
Assigned Date
Subramanian Rajalakshmi
8/26/2011
Hold
9/11/2011 G N Raja Ambika/Raji Issac/Raji Issac/Raji Raja/Raji Issac/Raji Raja/Raji Issac/Raji Issac/Raji Issac/Raji Ambika/Raji Issac/Raji Ambika/Raji Raja/Raji Ambika/Raji Ambika/Raji Issac/Raji Ambika Raja/Raji Issac/Raji Issac/Raji Issac/Raji Issac/Raji Subramanian Rajalakshmi 2/9/2012 2/15/2011 2/15/2011 3/28/2012 3/19/2012 4/16/2012 7/10/2012 5/16/2012 5/24/2012 6/7/2012 6/20/2012 7/5/2012 7/10/2012 7/17/2012 7/23/2012 7/19/2012 1/8/2012 7/30/2012 8/8/2012 8/8/2012 8/8/2012 8/8/2012 2/2/2012 14_Aug-2012 completed completed completed 14_Aug-2012 completed completed completed 14_Aug-2012 completed completed completed Hold completed completed 14_Aug-2012 14_Aug-2012 completed 14_Aug-2012 14_Aug-2012 14_Aug-2012 14_Aug-2012 14_Aug-2012 completed
COMMENTS
EROOM #
working on the performance issues completed the Priority 1 portion and is under testing completed and is under testing completed and is under testing working on the new spec User testing Completed Promoted to Prod Completed Priority 1 and 2 reports Code Promo sent completed, under testing Completed/ testing Hold Testing code Promo sent working Working Code Promo submitted Working working working working working User testing
1812 1901 1901 1785 1662 1804 1758 1901 1850 1895 1898 1738 1876 1897 1909 1912 1917 1886 1907 1922 1885 1906 1784