6th February, 2013 ProJKRM Dewan Tan Sri Mahfoz Khalid, KL

Executive

Tan Sri (Dr) Ir. Jamilus Hussein Chairman / CEO KLIA Premier Holdings Sdn Bhd

IMPORTANCE OF THE CONSTRUCTION INDUSTRY


Construction Sector as an Enabler of Economic growth Help stimulate Domestic Demand Multiplier effect Creation of Wealth Help to Elevate and Improve Quality of Life Construction output for Malaysia estimated to RM50 Billion per year Account for 3% to 5% of GDP Provides employment for 800,000 workers

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

TOLL ON THE ENVIRONMENT

GLOBAL WARMING

Every living system is in decline and the rate of decline is increasing.


-The Union of Concerned Scientists

AIR POLLUTION

WATER POLLUTION

OZONE DEPLETION

+ 1C

Arctic is melting

Coral Reefs dying + 2C

Amazon rainforest drying out + 3C Many coastal cities could be flooded + 4C Increase in climate refugees + 5C

+ 6C

Global Wipe Out

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

PRESENTATION OUTLINE
ISSUES IN CONSTRUCTION INDUSTRY TOWARDS SUSTAINABLE CONSTRUCTION GREEN PERFORMANCE ASSESSMENT TOOLS AND TECHNIQUES TO ACHIEVE SUSTAINABLE

AND GREEN CONSTRUCTION


CONCLUDING REMARKS

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

CONSTRUCTION INDUSTRY TODAY


ECONOMY SOCIAL ENVIRONMENT
LE RO

CONSTRUCTION INDUSTRY TODAY


S ES C C SU PR OB LE MS

PE CU L

AR IT IE S

Fragmentation Uniqueness Complexity Resource Driven Schedule Driven

Timely Completion Within Cost Required Quality

Time Overrun Cost Overrun Construction Waste Excessive Resource Consumption Environmental Threat

CONSTRUCTION TIME OVERRUN


Worldwide problem : seldom projects completed on time. In Nigeria : 50% projects experienced time overrun with an average

percentage escalation period up to 188%. In Bosnia and Herzegovina : 51.40% project experienced time overrun In Jordan : 82% of projects are delayed In Saudi Arabia and Ghana : 70% of projects were delayed In Malaysia : 18.2% of the public sector projects and 29.45% of private sector projects only are completed on time.

Time Delay can be due to one or more reasons including problems

of financing and payment for completed works, poor contract management, changes in site conditions , shortage of materials, design changes , weather condition, etc. Initial conceptionalisation not captured and formalised before calling of Tenders changes during construction. Integrated Master Implementation Programme.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

CONSTRUCTION COST OVERRUN


Cost is a major problem both in developed and developing countries.

The trend is more severe in developing countries where these overruns sometimes exceeds 100% of the anticipated cost of the project. United Kingdom (UK) : nearly 1/3 of the clients complaint that their projects generally experienced budget overrun. In Nigeria : A minimum average percentage escalation cost of projects was 14%. In Slovenia : 51 % projects faced price overrun In Croatia : 81% projects faced cost overrun In Bosnia and Herzegovina : 41.23% of the projects faced cost overrun. In Uganda : (Northern-by-pass project in Kampala) the cost overrun was more than 100% of the contract price.

CONSTRUCTION COST OVERRUN


Worldwide research in transportation projects : 9 out of 10 projects face cost

overrun. The common overruns are between 50 to 100%. In Malaysia : only 46.8% and 37.2% of public and private sectors projects completed within the budget respectively.

The factors identified that contribute to cost overrun : lack of

contractor s experience, poor site management and supervision, inaccurate time and cost estimates, schedule delay, frequent design changes, fluctuation of prices of materials, cash flow and financial difficulties faced by contractors .

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

CONSTRUCTION QUALITY
Construction carried out according the specification and detail

construction drawings. Materials approving committee Method statement Site management and control of works (QA/QC)

EXCESSIVE RESOURCES CONSUMPTION


Built environment has significant impact on resources : consuming

1/6 of the worlds freshwater withdrawals, 1/4 of wood harvest and 2/5 of materials. About 40% of the energy used is linked to the construction and maintenance of buildings. Excessive resource and energy use : Resulted in growing demand for raw materials, are largely responsible for the depletion of natural resources worldwide, acceleration of global warming and detrimental wastage affecting our ecological integrity.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

CONSTRUCTION WASTE
Waste is one of the serious problems in construction projects. Waste has direct impact on the productivity, material loss and completion time

of project resulting in loss of a significant amount of revenue. Waste contributes to around 30-35% of a project s production cost. The amount of construction materials wasted on the site is relatively high and equals 9% by weight of the purchased materials.

Construction waste can be generated because of one or more

reasons including frequent design changes, poor quality of materials, workers' mistakes during construction, poor planning, poor site management, ordering errors, materials not in compliance with specification, effect of weather, etc.

CONSTRUCTION WASTE
A study conducted on 30 construction sites in Malaysia identified

six types of waste materials which includes concrete (12.32%), metals (9.62%), bricks (6.54%), plastics (0.43%), timber (69.10%) and other wastes (2%) Hence, it is timely for Malaysia to adopt a systematic and efficient waste management strategy which would minimise the generation of waste at different level. Advanced tool likes lean construction techniques can help in reducing waste at source and can minimised the waste produced during the operation by re-using and re-cycling.

Adopting waste minimization strategy like recycling and

reusing material can save 2.5% of the total budget.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

CONSTRUCTION WASTE MANAGEMENT STRATEGY

ENVIRONMENTAL THREAT
Environmental Threat due to built environment : It consumes large

amounts of natural resources and produces a great deal of pollutants. Ethics of construction players: Not serious about environmental protection at construction sites, assume that a construction site is only a temporary setup, ignoring source of pollutants CO2 emission : Contributing to the global warming and extreme weather. Other Impacts : The harvest of timber leads to the lost of natural forests, widespread use of toxic chemicals in materials. Site clearings for development especially on slopes, etc.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

SCHEME OF SUSTAINABLE DEVELOPMENT

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

SUSTAINABLE CONSTRUCTION
In November 1994, the First International Conference on Sustainable

Construction held in Tampa, Florida, USA, the conference convener Kibert defined sustainable construction as, Creating a healthy built environment using resource-efficient, ecologically-based principles. Sustainable construction involves a commitment to:
Economic sustainability increasing profitability by making more efficient

use of resources, including labour, materials, water and energy. Environmental sustainability preventing harmful and potential irreversible effects on the environment by careful use of natural resources, minimizing waste, protecting and where possible enhancing the environment. Social sustainability responding to the needs of people at whatever stage of involvement in the construction process (from commissioning to demolition), providing high customer satisfaction and working closely with clients, suppliers, employees and local communities

OBJECTIVES OF SUSTAINABLE CONSTRUCTION


Environmental dimension:
Increase material efficiency by reducing the material demand of

non-renewable goods Reduce the material intensity via substitution technologies Enhance material recyclability Reduce and control the use and dispersion of toxic materials Reduce the energy required for transforming goods and supplying services Support the instruments of international conventions and agreements Maximize the sustainable use of biological and renewable resources Consider the impact of planned projects on air, soil, water, flora, and fauna.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

THE IMPACT OF THE BUILT ENVIRONMENT

OBJECTIVES OF SUSTAINABLE CONSTRUCTION


Economic dimension:
Consider life-cycle costs Internalize external costs Consider alternative financing mechanisms Develop appropriate economic instruments to promote sustainable

consumption Consider the economic impact on local structures.


Social dimension:
Enhance a participatory approach by involving stakeholders Promote public participation Promote the development of appropriate institutional frameworks Consider the influence on the existing social framework Assess the impact on health and the quality of life.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

CHALLENGES IN SUSTAINABLE CONSTRUCTION


Shifting to sustainability : A new paradigm where sustainable objectives are

within the building design and construction industry. Key Action : The objectives should be considered in decision making at all stages of the life cycle of the facility. Figure below shows the evolution and challenges of the sustainable construction concept in a global context.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

GREEN BUILDINGS
Green building practices are:
environmentally responsible and resource-efficient to promote building practices that conserve energy and water

resources, preserve open spaces. to minimise the emission of toxic substances to harmonise with the local climate, traditions, culture and the surrounding environment to sustain and improve the quality of human life maintaining the capacity of the ecosystem at local and global levels.

BENEFITS OF GREEN BUILDING

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Benefits to the targeted groups


S (society) EU (end user)

Long-term economic returns

Lower electric and water utility costs

EU

Higher Benefits Initial Cost


S S

EU

Enhanced health and productivity

Environmentally effective use of materials

Reduced environmental impact

GREEN BUILDING STANDARDS


BREEAM (UK/Global) BRE Environment Assessment Method LEED (USA/ Global) Leadership in Energy & Environment design Green Star (Australia) Green Star NZ ( New Zealand) GBTool (Canada) HQE (France) High Environmental Quality HK-BEAM (Hong Kong) HK Building Environmental Assessment Method SBAT (South Africa) Sustainable Buidling Assessment Tool CASBEE (Japan) Comprehensive Assessment System for Building Energy Efficiency GBI (Malaysia)

Green Building Assessment and indexing System

Green PASS (CIDB, Malaysia)

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

GREEN BUILDING INDEX


The Green Building Index, developed by Pertubuhan Akitek Malaysia

(PAM) and the Association of Consulting Engineers Malaysia (ACEM) is a rating system that provides guidelines for developers for designing and constructing green buildings. GBI (Green Building Index) comprises of 6 key criteria as:
Energy Efficiency, Indoor Environmental Quality, Sustainable Site Planning and Management, Material and Resources, Water Efficiency, and Innovation

GBI CRITERIA
Energy Efficiency (EE) Improve energy consumption by optimizing building orientation, minimizing solar heat gain through the building envelope, harvesting natural lighting, adopting the best practices in building services including use of renewable energy, and ensuring proper testing, commissioning and regular maintenance. Indoor Environment Quality (EQ) Achieve good quality performance in indoor air quality, acoustics, visual and thermal comfort. These will involve the use of low volatile organic compound materials, application of quality air filtration, proper control of air temperature, movement and humidity.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

GBI CRITERIA
Sustainable Site Planning & Management (SM) Selecting appropriate sites with planned access to public transportation, community services, open spaces and landscaping. Avoiding and conserving environmentally sensitive areas through the redevelopment of existing sites and brown fields. Implementing proper construction management, storm water management and reducing the strain on existing infrastructure capacity Materials & Resources (MR) Promote the use of environment-friendly materials sourced from sustainable sources and recycling. Implement proper construction waste management with storage, collection and reuse of recyclables and construction formwork and waste. Water Efficiency (WE) Rainwater harvesting, water recycling and water-saving fittings. Innovation (IN) Innovative design and initiatives that meet the objectives of the GBI

GBI RATING SYSTEM


GBI rating for Non-residential (commercial, institutional, and industrial in nature.
Factories, hospitals, offices, hotels, etc) More emphasis on energy efficiency

GBI rating for Residential residential buildings (Linked houses, apartment,

bungalows, condominium, etc, More emphasis on sustainable site planning & management)

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

GBI CLASSIFICATION

GREEN PERFORMANCE ASSESSMENT SYSTEM IN CONSTRUCTION (GREEN PASS)

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Introduction
Green Performance Assessment System In Construction (Green Pass) is designed to meet this need through a standard conformance that promoted sustainable construction in an integrated manner with other with other Construction Industry Standards (CIS). ii. This standard is based on minimum requirements for buildings and systems using performance-related provisions and complements existing standards to form a comprehensive assessment system for green building construction. iii. The Green PASS has incorporated international standards in its development, specifically PAS 2050, Common Carbon Metrics (United Nations SBCI), United Nations GHG Protocol, ANSI and other relevant standards inline with emerging global technological and sustainability requirements.
i.

Scope
The Green PASS estimates the carbon emission from building construction

works throughout a buildings life cycle. Assessment system covers construction, operations, renovation and demolition. The evaluation of Green PASS is divided into:
i. ii.

Building Construction Building Operations

Embodied carbon is referred to as COe 2 emitted during the construction or

retrofitting processes. Operational carbon is CO 2 emitted during building. Green PASS adopt minimum standards of performance for baselings in key areas e.g. water, waste, IEQ (Indoor Environment Quality)

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Objectives of Green PASS


To evaluate the environmental impact of construction and operational performance of building in relation to carbon emission reduction. ii. To give due recognition for Low Carbon building construction and operations. iii. To align and support the Low Carbon Cities Framework and Assessment System (LCCF&AS). iv. To encourage peer review of construction and operations management practices towards sustainable construction. v. To increase awareness of carbon reduction and environmental impact in construction and building operations amongst project stakeholders.
i.

Objectives of Green PASS


The outcomes of the Green PASS provide information on the: i.Baseline emissions and project emissions from five elements: Site, Material, Energy, Water, Waste ii.A non-GHG qualitative and quantitative analysis of Indoor Environmental Quality, iii.Percentage reduction in carbon emissions iv.Opportunity for further improvement

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Application of Green PASS


Green PASS assesses the whole performance of a

building in terms of carbon emission reduction based on: Site, Material, Energy, Water & Waste
while indoor environmental quality (IEQ) is a qualitative and quantitave assessment of building occupants comfort and overall satisfaction.

Structure of Green PASS


Green PASS certification Categories Building Construction Green PASS Building Operations
Indoor Environmental Quality

Elements

Site

Material

Energy

Water

Waste

Energy

Water

- Thermal Comfort

Sub-elements Green PASS Rating


Diamond Rating Scheme Diamond Rating Scheme with Bonus 1 to <10 + 1 to <10 10 to <30 + 10 to <30 30 to <50 30 to <50 + + 50 to <70 50 to <70

- Indoor Air Quality - Indoor Lighting - Indoor Acoustic

% of CO

Reduction

70 to <100

100% Carbon Neutral + 100% Carbon Neutral

+ 70 to <100

Upon completion of the assessment, the applicant will be awarded a Green PASS certificate The category of assessment (Green PASS Building Construction or Green PASS Building

Operation)
The level of carbon reduction achieved, represented by number of diamonds.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

TOOLS AND TECHNIQUES


Advanced technological methods in achieving sustainable

construction are:
Lean techniques, Good Project Management Practise Industrialized Building System (IBS) , Value Engineering (VE), Automated Construction, Building Information Modelling (BIM), Sustainable Supply Chain Management (SSCM) etc.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

LEAN TECHNIQUES

LEAN AND SUSTAINABILITY

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

GOOD PROJECT MANAGEMENT PRACTISE

The Concept & Role of PM in Construction Industry


The Rightful Roles :
- The Client determines the WHAT. - The Construction industry determines the HOW. - The Construction Industry is obligated to results, based on key role of Project Management in conceptual development, optimisation of know-how and innovative processes. - Independent role of Project Management in protecting Clients overall interest is assured as it is the Project Managers main interest. - Independent Project Management will result in the right balance throughout the Project between Budget, Quality, Time, Information & Organization forcing all involved Parties to clearly focused on Clients aim and objectives. -The (non-technical) Client can focus on his principal role in the Project without placing a load on his organization. Thus, retaining his valuable resources for his Core Business.

Project Management

HOW

Lead Consultant

Disciplinary Consultants Main Contractor & Sub-Contractors

Construction Industry

Client

WHAT

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

The 3 Cornerstones of Project Management

C O N T R O L

Pha s i ng Decision-making
This represents the BASIS for the Project Management Working Method
47

The Project Controlling Principle


Each Development Phase must be Controlled to ensure the Project Development is in accordance with the set Project END RESULT or GOAL

T C Q O I

Broad Plan for subsequent Phases Detailed Plan & Approach for next Phase Project Result Controlling Aspects

Each Phase will be subjected to Controlling Processes in Time, Cost, Quality, Organization & Information
48

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Phased Project Development


Project Phasing
Idea What How

P1
Inception Phase

P2
Definition Phase

P3
Design Phase

How to Make

Do

Preserve

P4
Procurement Phase

P5
Construction Phase

P6
O&M Phase

Dividing the Overall Project Development into Distinct Project Phases. Each with their unique Development Content. Formulating UPFRONT how the Execution Processes takes place, Making the Total Development Scope MANAGEABLE!
49

The Managerial Integration


Project Phasing
Idea What How How to Make
Procurement Phase

Do

Preserve

Initiative Phase Remaining Scope Achieved Result

Definition Phase

Design Phase

Construction Phase

O&M Phase

T C Q O I
Project Inception

T C Q O I
Project Program

T C Q O I
Project Design

T C Q O I
Implementation Program

T C Q O I
Operation & Maintenance Program

Control

Decision-making

Leads to a Decisive, Controlled and therefore Manageable Overall Process!


50

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Project Phasing
Idea

P1
Inception Phase

Need and intention to built (incl. initial thought

on facility) Feasibility studies & Technical & economic study Project Budget Project brief design, technical, cost, quality, time parameters External & Internal Stakeholders

51

External Project Environment

EXTERNAL PROJECT ENVIRONMENT


Shareholders Financiers (Main) Client Clients Representatives Primary End Users Secondary End Users Government Ministries Public Media Professional Associations Government Agencies

Corporate Enterprise
and its business purpose Project Sponsor

Consulting Engineers
Project Manager
and Project Team

Legislative Authorities

General Construction

Local Authorities

Local Municipality

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Internal Project Environment

Corporate Policy Facility Planning & Standards Finance/Accounting/Payments Audit Legal Marketing Operations User Coordination

Board of Directors

Corporate Enterprise
and its business purpose
Project Sponsor

Architectural Structural Mechanical Electrical & ICT Energy preservation Acoustics/Noise Conveying Quality Assurance Quality Inspection Process, Evironmental & other Specialists

Consulting Engineers

Estimating Scheduling Project Admin

Project Manager
and Project Team

Contract Admin Labour Relations Trade Coordination Shop Drawings Expediting

Construction Supervision

General Construction

Special Suppliers Trade Contractors Bonds arrangements & Insurances Major Suppliers

Health, Safety, Security & Environment Cost Control Quality Control

Project Phasing
Idea What

P1
Inception Phase

P2
Definition Phase

Requirement capture from Internal & External Stakeholders Scope of Work, Deliverables, time & budget Technical & Design Concept (incl. site condition, soil

investigation & functionality) Project implementation strategy Master Implementation Program Organizational structure, System & Procedure QA/QC, Communication & Information Plan HSSE Document Control Centre

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Project Phasing
Idea What How

P1
Inception Phase

P2
Definition Phase

P3
Design Phase

Detail design development, materials search Value engineering, maintenance awareness Preparing procurement strategy, tender documentation Detail cost estimate & budget, cost control system Performance & technical specifications Approval of the Client

Project Phasing
Idea What How

P1
Inception Phase

P2
Definition Phase

P3
Design Phase

How to Make

P4
Procurement Phase

Tendering process & Award Evaluation Criteria Spreadsheet Presentation for Comparison of different

Tender Proposal / Pricing Recommendation

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Project Phasing
Idea What How

P1
Inception Phase

P2
Definition Phase

P3
Design Phase

How to Make

Do

P4
Procurement Phase

P5
Construction Phase

Site planning Detail construction work programs (incl. interfacing) Contract administration Design, technical site review & adjustment How to manage TCQIOP QA/QC, HSSE implementation & control Operational readiness & maintenance plan Testing, commissioning & handover (incl. CF)

Project Phasing
Idea What How

P1
Inception Phase

P2
Definition Phase

P3
Design Phase

How to Make

Do

Preserve

P4
Procurement Phase

P5
Construction Phase

P6
O&M Phase

Operation & maintenance process (Client /

Operator Organization) Defect liability management Contract closing & final account (incl. dispute, claims) Post-project evaluation & documentation

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Project Life Cycle Variables


Total Project Life Cycle
Planning Phase 1 Conceive
Decreasing Opportunity

Execution Phase 2 Develop Phase 3 Execute Phase 4 Finish

Val ue

Constructive Opportunity

Destructive Intervention

Cost to Change

Time

Level of Planning
Deliverable/s
Planners Level of Conceptual & Managerial Skills

Level 5

Strategic Planning

Master Plan, Business Plan, Strategies, Roadmaps Project Organization & Operational Scheme, Control Systems, Communication Plan Project Activities Approaches & Strategies, 4D Planning, Master Implementation Progm Integrated logic Network Progm, Interface Mgt System Detailed Project Activities Schedules & Sub-schedules

Level 4

Tactical Planning

Level 3

Master Programming

Level 2

MultiDisciplinary

Level 1

Singular Disciplinary

Level of Conceptual & Managerial Complexity of Projects


60

Increasing Cost

Opport unity to A dd

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

PM and Contractor Construction Management Organization


Client WHAT Project Management HOW Construction Industry

Contractor Construction Management Organization Client

Project Management Organization Client

Lead Consultant Disciplinary Consultants Main Contractor & Sub-Contractors

PD/PM PM Org

PD/PM PM Org

Both organization compliment to work towards Project objectives

PD/PM Contractor Org

Planning & Integration

Quality QA/QC

Cost Contract Risk

HSSE

Design Dev Engineering

Planning & Integration

Quality QA/QC

Cost Contract Risk

HSSE

Design Dev Engineering (Consultants)

Construction Management & Supervision

PROJECT MANAGEMENT MATRIX


Board of Directors

= =

Client PMC
PROJECT Construction Director
CEO Office Managing Director

Procurement Committee

Audit Committee

Finance Committee PMC Support

Management Committee PMC Support

Users Committee PMC Support Senior Construction GM

Security Committee PMC Support

SERVICE

Senior Construction GM

Project Manager 1 Technical Management Support to Client Design Mgmt, Procurement, Planning, & Finance

Project Manager 2

Project Manager 3

Project Manager 4

Site Development & Control Survey

S U P P O R T C O N S U L T A N T S

Health,Safety, Security & Environment

General Manager Engineering


Document Control

CONSULTANT (S

General Manager Procurement


Procurement & Contract

General Manager Planning & Quality Assurance

Planning Quality Assurance

General Manager Finance


Administration

General Manager Administration

CONTRACTOR APPOINTED
62

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Industrialized Building System (IBS)

PREFABRICATION
Modern Methods of Construction

Off-Site Manufacture (OSM)

Non Off-Site Manufacture

Panellised

Tunnel Form

Volumetric (Modular Construction) Hybrid (Semi-Volumetric) Sub-Assemblies and Components

Thin-Joint Masonry

Carpet Reinforcement

Insulating Concrete Formwork

......

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

PREFBRICATION
Environmental

Social 1. Better site safety 2. Less construction noise 3. Reduction on-site dust

Economic 1. Shorter construction time 2. Less labor requirement 3. Government incentives

1. Material conservation 2. Reduced waste on site 3. Better air quality 4. Less CO2 emission

Prefabrication
Economic Environmental More transport emissions Social More unemployed workers 1. Higher initial investment 2. Higher cranage cost 3. Higher transport cost

Jaillon and Poon(2008), Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study. (7 projects)

Industrialized Building System (IBS)


It must be mentioned here that the

traditional in-situ construction practices leads to large wastage in the form of timber used for formworks, excess material, errors in dimensions and measurements, high labour utilisation leading to high social costs and other forms of temporary works. The use of offsite construction can eliminate the problem of wastage substantially and reduce construction time.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Industrialized Building System (IBS)


However, due to ease of securing

relatively cheaper foreign labour innovative construction technology and techniques has not made a significant impact on the Malaysian construction industry and as much, cannot provide the economies of scale that is needed to transform the construction industry from one that is labour intensive, to one that is technology intensive.

Definition of Industrialized Building Systems (IBS)

A construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works
Comparison: Offsite construction UK Modern Method of Construction - MMC

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

PROPOSED POLICY OBJECTIVES OF IBS

MISSION, FOCUS AND FUNCTIONS OF IBS

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

VALUE ENGINEERING

VALUE ENGINEERING AND MANAGEMNET


Value Management and life cycle costing is about managing

overall development process by making the appropriate decisions when one moves from one phase of development to the other based on 5 basic controls: TIME, COST, QUALITY, ORGANIZATION and INFORMATION

It does not happen by chance or when the need arise. It has

to be planned and structured to make it happened affectively. Value management is NOT just a cost cutting exercise.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

AUTOMATED CONSTRUCTION

AUTOMATED CONSTRUCTION
According to the Architectural Institute of Japan, 150 types of

construction robots have been developed in the field of building construction. Robots category
Robots for structure construction works , including fire-proofing, steel

welding, iron-bar placing, concrete placing, concrete finishing, and remote wirereleasing. Robots for work completion , including exterior wall spraying, ceiling panel placing, and light-weight wall panel handling. Robots for inspection works, including outer wall tile inspection, and clean room inspection. Robots for maintenance works , including coating glass cleaning, and floor cleaning.

A total of 12 systems has been thus far developed by eight

construction companies and introduced on more than 20 construction sites.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

AUTOMATED CONSTRUCTION

Automated Construction
Concrete finishing robot Fire-proofing robot Steel welding robot Tunnel cave detection system

Exterior wall spraying robot

THE FUTURE OF SUSTAINABLE CONSTRUCTION Summit on the Global Agenda, Dubai, UAE, 7-9 Nov. 2008

WE CANNOT MOVE TO A POSTIVE FUTURE WITHOUT REVOLUTIONIZING CONSTRUCTION.

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

"Teach your children what we have taught ours, that the earth is our mother. Whatever befalls the earth befalls the sons of the earth. The earth does not belong to man; man belongs to the earth. Man did not weave the web of life; he is merely a strand in it. We do not inherit the earth from our ancestors; we borrow it from our children."
THE GREAT leader of the Native American Suquamish Tribe, Chief Seattle or See-ahth

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Contribution : plays vital role in economic growth, helps in improving the quality

of life of its citizens Negative Impacts : implication to the environment and social aspect of the country, emission of CO 2 by buildings contributed to the global warming and extreme weather Resource Consumption : About 40% of the world's resource and energy use is linked to the construction and maintenance of buildings. Green building approach : environmentally responsible and resource-efficient, promotes building practices that conserve energy and water resources, preserve open spaces, reduce energy consumption up to 50%, CO 2 emission up to 39%, water used up to 40% and finally reduction in solid waste up to 70%. Advanced technological methods : Lean techniques, Good Project Management Practise, Industrialized Building System (IBS), Building Information Modelling (BIM), Value Engineering (VE), Sustainable Supply Chain Management (SSCM) etc.