Stepwise Document for Load Monitoring Failures

Document Version / Dtails : Ver 1.0 / 24-AUG-08

Record Of Release Versio n No. 1.0 Created / Modified By Mugdha Sawant Reviewed By Sachin Tamhane Release Date Modifications Done

03/01/2011

Project ID:

E6806

Project Name:

FSS BW Operation

Document Title: Stepwise Document for Load Monitoring Failures

Scope of Document: This document helps us understand the steps to be followed incase we encounter a failure in the daily load monitoring process. Steps: Step1: The Identification of a chain failure would be done through the program /SSA/BWT through which we monitor all the chains. Step2: If the chain fails, go to the process chain and identify the failed process type Step3: Right Click on the failed process type and read the error message. Incase of load failures, if the display messages is not comprehensible, then go to the process monitor of that particular failed load and try to analyze the issue in the details tab. Given below are a few examples of failures that are commonly encountered on daily basis: 1) Changerun Failure: If you receive any of the below errors:

PM-03-04 Ver 1.0/14-Aug-08

Page 2 of 13

Document Title: Stepwise Document for Load Monitoring Failures

Please refer the below document :

Attribute Change Run.doc

PM-03-04 Ver 1.0/14-Aug-08

Page 3 of 13

Document Title: Stepwise Document for Load Monitoring Failures

2) Invalid character when loading the data:

From this error message it is not clear what the error is, hence we have to go to the process monitor for understanding in detail

PM-03-04 Ver 1.0/14-Aug-08

Page 4 of 13

Document Title: Stepwise Document for Load Monitoring Failures

Please refer the below document :


How to resolve Invalid Characters Error in Cube.doc

PM-03-04 Ver 1.0/14-Aug-08

Page 5 of 13

Document Title: Stepwise Document for Load Monitoring Failures

3) Datasource replication:

Please refer the below document :


Datasource Replication.doc

PM-03-04 Ver 1.0/14-Aug-08

Page 6 of 13

Document Title: Stepwise Document for Load Monitoring Failures

4) Locked by other Objects:

Please refer the below document :

Locked by Other Process.doc

5) Error 7 in the update:

PM-03-04 Ver 1.0/14-Aug-08

Page 7 of 13

Document Title: Stepwise Document for Load Monitoring Failures

Please refer the below document:

Error 7 in update.doc

6) Memory Allocation Issue:

Please refer the below document:

Memory Allocation Issue.doc

After taking the corrective action if you have repeated the process chain then the Chain would move ahead once the failed process type is successfully completed. However if you have taken manual action on the failed process type then you have to force green the failed process type by following the below steps Step1: Right click on the failed process type and go to the display messages

PM-03-04 Ver 1.0/14-Aug-08

Page 8 of 13

Document Title: Stepwise Document for Load Monitoring Failures

Step2: Note down the Instance and the variant,

PM-03-04 Ver 1.0/14-Aug-08

Page 9 of 13

Document Title: Stepwise Document for Load Monitoring Failures

Incase if either of the two(Instance/variant) are missing then note down the Job count number.

PM-03-04 Ver 1.0/14-Aug-08

Page 10 of 13

Document Title: Stepwise Document for Load Monitoring Failures

Step3: Go to table rspcprocesslog in SE16 and enter the instance and variant taken from the previous step

PM-03-04 Ver 1.0/14-Aug-08

Page 11 of 13

Document Title: Stepwise Document for Load Monitoring Failures

Step4: Display the table entry

Step5: Go to function module RSPC_PROCESS_FINISH and execute

PM-03-04 Ver 1.0/14-Aug-08

Page 12 of 13

Document Title: Stepwise Document for Load Monitoring Failures

Step6: Enter the Login ID, Type, Variant and instance obtained from SE16 and make the state as G

Step7: Execute the function Module The chain would be moved ahead successfully