UMS
Surveyed & Prepared by : Rashid Tapa Contact Number : 019-8280386 Date: 18th January, 2011 Asia Debut Sdn Bhd 8-1, Damai Niaga, Jalan Damai Raya 2, 58000 Cheras, Kuala Lumpur.
1.0
INTRODUCTION
A site survey was carried out by Asia Debut Sdn Bhd technical team at Masjid Besar UMS with the assistance UMS Kota Kinabalu Management personnel. Prior to the visit, drive test was done around the area and it was identified that the most suitable place for Mobile phone and broadband operate to install a GSM, 3G, Wimax system in order to solve outdoor and indoor coverage issue on surrounding area is at Masjid Besar UMS, Kota Kinabalu,Sabah.
This document is produced as a proposal to UMS Management stating the component that is going to be installed at this site. It also describes the technical issues involved.
2.0
SITE DETAILS
N 6.03693
E 116.12463
3m
The main equipment and components to be installed at the site: i. ii. iii. iv. RBS equipment (unmanned equipment and operating 24 hours per day) RF antennas and feeder cables Antenna mounting Microwave antenna
3.0
3.2 CELCOM
Antenna No of Antenna Antenna Diameter Weight Direction (TN) TX Frequency RX Frequency Proposed height Antenna Type TX Power RF ANTENNA 3 MICROWAVE TBA TBA TBA TBA TBA TBA TBA TBA TBA
APX16DWV-16DWVS-C
TBA
3.3 DIGI
Antenna No of Antenna Antenna Diameter Weight Direction (TN) TX Frequency RX Frequency Proposed height Antenna Type TX Power RF ANTENNA 3 MICROWAVE TBA TBA TBA TBA TBA TBA TBA TBA TBA
KAT 742236
TBA
4.0
CABLING
No of Radio Antenna feeder cables Type of feeder cables 6 7/8" feeder cables
The feeder cables, antennas and equipments will be installed appointed by contractor
5.0
POWER SUPPLY
Asia Debut Sdn Bhd will deal with SESB for power supply or tapping from building power source but in case of any changes in the modes of power supply Asia Debut Sdn Bhd will inform UMS Management.
6.0
EARTHING 6.1 Telcos will provide own Main Ground Bar at Microwave Antenna Level for all equipments on building and connected to own DC Earth Chamber at ground via 50.0 mm Ground Cable. Telcos will provide own DC Earth Chambers for all equipments at ground level. Telcos will provide own AC Earth Chamber and connected to AC inlet. All DC Earth Chambers are connected together via 25.0mm Copper Tape.
6.2
6.3 6.4
7.0 SITE ACCESSIBILITY During the initial stage of site preparations and equipment installation, testing and commissioning there will be frequent movement of staffs. After the site has been commissioned the maintenance staff will visit the site periodically or if there is shortcoming occurs. The requirement for accessibility during the Operational Phase is 24 hours accessibility as the site operates continuously. Permission and work permit will be obtained prior to the above-mentioned work.
8.0 ADDITIONAL INFORMATION
ATTACHMENT : v v v v v v Site Location Map Proposed Structure Location Sample of Lamp pole Site Photo Site Drawings Detail Drawings
ATTACHMENT
Area: Behind mosque open area Site Name: ST-6 Masjid Besar UMS Lat: 6.03693 Long: 116.12463
SITE PHOTO