Sei sulla pagina 1di 4

Bd-O - OIL PAINTING

Sr. No. & Item Code 1 Bd-O 1 DESCRIPTION OF ITEMS Providing and applying two coats of lead/zinc base oil paint / bituminous paint of approved colour and shade to new wood work and fiber boards including preparing the surface, knotting, scaffolding if necessary, excluding primer coat complete. Spec.No.:Bd.O. 1 Page No. 403 Providing and applying one coat of lead/zinc base oil paint / bituminous paint of approved colour and shade to old wood work previously painted and fiber boards including if necessary scaffolding preparing the surface, excluding primer coat complete. Spec.No.:Bd.O. 2 Page No. 404 Providing and applying two coats of lead/zinc base oil paint/bituminious paint of approved colour and shade to old wood work and fiber boards previously painted including if necessary scaffolding preparing the surface, excluding priming coat complete. Spec.No.: Bd.O. 2 Page No. 404 Providing & applying two coats of lead/zinc base oil paint/ bituminious paint of approved colour to new structural steel work and iron work in buildings including scaffolding if necessary, cleaning and preparing the surface (excluding primer coat) Spec. No.: Bd.O. 3 Page No. 404 Providing and applying _______ of alluminium paint of approved make to new structural steel work in building and workshop includng scaffolding if necssary, cleaning and preparing surface (excluding primer coat) complete. Spec.No.: Bd.O.4 Page No. 405 a) One Coat b) Two Coats Unit Sq.Mt. Rate for 2012-2013 (in Rs.) Completed Labour 48.00 11.00

2 Bd-O 2

Sq.Mt.

25.00

5.00

3 Bd-O 2A

Sq.Mt.

37.00

11.00

4 Bd-O 3

Sq.Mt.

47.00

12.00

5 Bd-O 4

Sq.Mt. Sq.Mt.

39.00 56.00

9.00 15.00

55

Sr. No. & Item Code 6 Bd-O 5

DESCRIPTION OF ITEMS Providing and applying two coats of synthetic enamel paint of approved colour to new / old structural steel work and wood work in building, including scaffolding if necessary, cleaning and preparing the surface (excluding primer coat) complete. Spec. No.: Bd.O. 5 Page No. 405 Providing and applying __________ of flat oil paint of approved colour to the old structural steel work and iron work previously painted in building including scaffolding, if necessary, cleaning and preparing surface ( excluding primer coat) complete. Spec. No.: Bd.O. 6 Page No. 406 a) One Coat b) Two Coats Providing and applying _________ of flat oil paint of approved colour and shade to internal / external plastered surfaces including scaffolding if necessary, cleaning and preparing the surface ( excluding primer coat) complete. Spec.No.: Bd.O. 7. Page No. 406 a) One Coat b) Two Coats Providing and applying two coats of water proof cement paint of approved manufacture and of approved colour to the plastered surfaces including scaffolding if necessary cleaning and preparing the surfaces, watering for two days complete. Spec.No.: Bd.O. 8 Page No. 406 Removing old paint from steel and other metal surface and making the surfaces even with hand scrapping, scaffolding etc. complete. Spec. No.: As directed by Engineer in charge. Providing and applying priming coat over new wood and wood based surfaces, including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting, scaffolding etc. complete. Spec.No.: As directed by Engineer in charge.

Unit Sq.Mt.

Rate for 2012-2013 (in Rs.) Completed Labour 48.00 15.00

7 Bd-O 6

Sq.Mt. Sq.Mt.

30.00 41.00

9.00 16.00

8 Bd-O 7

Sq.Mt. Sq.Mt. Sq.Mt.

27.00 44.00 35.00

9.00 15.00 16.00

9 Bd-O 8

10 Bd-O 8B

Sq.Mt.

7.00

7.00

11 Bd-O 8C

Sq.Mt.

15.00

4.00

56

Sr. No. & Item Code 12 Bd-O 8D

DESCRIPTION OF ITEMS Providing and applying priming coat over new/old steel and other metal surfaces including preparing the surface by throughly cleaning oil, grease, dirt and other foreign matter and scoured with wire brushes, fine steel wool, scrappers and sand paper, scaffolding etc. complete. Spec. No.: As directed by Engineer in charge. Providing and applying priming coat concrete/ masonary/Asbestos Cement plasterd surfaces including scaffolding if necessary, preparing the surface by throughly cleaning oil, grease, dirt and other foreign matter and sand papering as required. Spec. No.: As directed by Engineer in charge. Providing and applying one coat of seal cement primer of approved manufacture and shed including scaffolding preparing the surface by cleaning dirt and other foregin matters, scrapping if necessary including scaffolding etc. complete. Spec. No.: As directed by Engineer in charge. Providing and applying pearl/luster finish paint of approved colour and shade to the existing plastered surface including scaffolding, preparing the surface, applying primer and the acrylic wall putti etc. complete. Spec. No. : As directed by Engineer in charge. Providing and applying two coats of textured synthetic paint of approved shade and quality and one coat of primer before applying textured paint including scaffolding if neccessary preparing surface by thoroughly cleaning oil, grease, dirt and other materials as required, etc. complete Spec. No.: As directed by engineer in charge.

Unit Sq.Mt.

Rate for 2012-2013 (in Rs.) Completed Labour 14.00 6.00

13 Bd-O 8E

Sq.Mt.

14.00

4.00

14 Bd-O 8F

Sq.Mt.

8.60

5.00

15 Bd-O

Sq.Mt.

181.00

77.00

16 Bd-O

Sq.Mt.

105.00

18.00

57

Sr. No. & Item Code

DESCRIPTION OF ITEMS

Unit

Rate for 2012-2013 (in Rs.) Completed Labour

NEW ITEMS
17 Bd-O Providing and applying two coats of appex Ace white exterior paint of approved manufacture and of approved colour to the plastered surfaces including cleaning, prepairing the plaster surface ,applying primer coat, scaffolding if necessary, and watering the surface for two days complete. Spec.No.: As directed by Engineer in charge. Providing and applying two coats of exterior white weathershield paint of approved manufacture and of approved colour to the plastered surfaces including cleaning, prepairing the plaster surface, applying primer coat, scaffolding if necessary, and watering the surface for two days complete. Spec.No.: As directed by Engineer in charge. Note: For Item No. 15 to 18 prior approval of Superintending Engineer will be necessary. Sq.Mt. 124.00 60.00

18 Bd-O

Sq.Mt.

123.00

60.00

58

Potrebbero piacerti anche